References
- Absi N, Archetti C, Dauzère-Pérès S, Feillet D. 2014. A two-phase iterative heuristic approach for the production routing problem. Transport Sci. 49(4):784–795.
- Archetti C, Bertazzi L, Laporte G, Speranza MG. 2007. A branch-and-cut algorithm for a vendor-managed inventory-routing problem. Transport Sci. 41(3):382–391.
- Adulyasak Y, Cordeau JF, Jans R. 2012. Optimization-based adaptive large neighborhood search for the production routing problem. Transport Sci. 48(1):20–45.
- Adulyasak Y, Cordeau JF, Jans R. 2015. The production routing problem: A review of formulations and solution algorithms. Comput Oper Res. 55:141–152.
- Amorim P, Belo-Filho MAF, Toledo FMB, Almeder C, Almada-Lobo B. 2013. Lot sizing versus batching in the production and distribution planning of perishable goods. Int J Prod Econ. 146(1):208–218.
- Armstrong R, Gao S, Lei L. 2008. A zero-inventory production and distribution problem with a fixed customer sequence. Ann Oper Res. 159(1):395–414.
- Belo-Filho MAF, Amorim P, Almada-Lobo B. 2015. An adaptive large neighborhood search for the operational integrated production and distribution problem of perishable products. Int J Prod Res. 53(20):6040–6058.
- Boudia M, Louly MAO, Prins C. 2007. A reactive GRASP and path relinking for a combined production distribution problem. Comput Oper Res. 34(11):3402–3419.
- Brahimi N, Aouam T. 2016. Multi-item production routing problem with backordering: A MILP approach. Int J Prod Res. 54(4):1076–1093.
- Chen ZL, Vairaktarakis GL. 2005. Integrated scheduling of production and distribution operations. Manage Sci. 51(4):614–628.
- Chen ZL. 2010. Integrated production and outbound distribution scheduling: Review and extensions. Oper Res. 58(1):130–148.
- Desrochers M, Laporte G. 1991. Improvements and extensions to the Miller-Tucker-Zemlin subtour elimination constraints. Oper Res Lett. 10(1):27–36.
- Farahani P, Grunow M, Günther HO. 2012. Integrated production and distribution planning for perishable food products. Flex Serv Manuf J. 24(1):28–51.
- Gao S, Qi L, Lei L. 2015. Integrated batch production and distribution scheduling with limited vehicle capacity. Int J Prod Econ. 160:13–25.
- Geismar HN, Laporte G, Lei L, Sriskandarajah C. 2008. The integrated production and transportation scheduling problem for a product with a short lifespan. Informs J Comput. 20(1):21–33.
- Lei L, Lee K, Oppenheim R, Qi L, Dong H, Wang S. 2014. Integrated production/distribution/routing planning for supply chain networks: a review. In: Chaovalitwongse WA, Liang Z, editors. Supply chain management and logistics: innovative strategies and practical solutions. CRC Press – Taylor & Francis Group.
- Low C, Chang CM, Li RK, Huang CL. 2014. Coordination of production scheduling and delivery problems with heterogeneous fleet. Int J Prod Econ. 153:139–148.
- Moons S, Ramaekers K, Caris A, Arda Y. 2017. Integrating production scheduling and vehicle routing decisions at the operational decision level: a review and discussion. Comput Ind Eng. 104:224–245.
- Polat O, Kalayci CB, Kulak O, Günther HO. 2015. A perturbation based variable neighborhood search heuristic for solving the vehicle routing problem with simultaneous pickup and delivery with time limit. Eur J Oper Res. 242(2):369–382.
- Van der Laan E, Salomon M, Dekker R. 1999. An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies. Eur J Oper Res. 115(1):195–214.
- Viergutz C, Knust S. 2014. Integrated production and distribution scheduling with lifespan constraints. Ann Oper Res. 213(1):293–318.
- Zachariadis EE, Tarantilis CD, Kiranoudis CT. 2009. A guided tabu search for the vehicle routing problem with two-dimensional loading constraints. Eur J Oper Res. 195(3):729–743.