192
Views
9
CrossRef citations to date
0
Altmetric
Original Articles

Monotonic change point estimation of generalized linear model-based regression profiles

&
Pages 2207-2227 | Received 23 Jan 2015, Accepted 06 Apr 2015, Published online: 24 Nov 2016

References

  • Ahmadzadeh, F. ( 2009). Change point detection with multivariate control charts by artificial neural network. The International Journal of Advanced Manufacturing Technology 1–12. doi:10.1007/s00170-009-2193-6
  • Amiri, A., Allahyari, S. ( 2012). Change point estimation methods for control chart post signal diagnostics: a literature review. Quality and Reliability Engineering International 28(7):673–685.
  • Amiri, A., Khosravi, R. ( 2013). Identifying time of a monotonic change in the fraction nonconforming of a high-quality process. The International Journal of Advanced Manufacturing Technology 68(1–4):547–555.
  • Amiri, A., Koosha, M., Azhdari, A., Wang, G. ( 2014). Phase I monitoring of generalized linear model-based regression profiles. Journal of Statistical Computation and Simulation, doi:10.108000949655.2014.942864 (published online).
  • Atashgar, K., Noorossana, R. ( 2011). An integrating approach to root cause analysis of a bivariate mean vector with a linear trend disturbance. The International Journal of Advanced Manufacturing Technology 52(1–4):407–420.
  • Ayoubi, M., Kazemzadeh, R. B., Noorossana, R. ( 2014). Estimating multivariate linear profiles change point with a monotonic change in the mean of response variables. The International Journal of Advanced Manufacturing Technology 75(9):1537--1556.
  • Best, M. J., Chakravarti, N. ( 1990). Active set algorithms for isotonic regression; a unifying framework. Mathematical Programming 47(1–3):425–439.
  • Chang, S. I., Tavakkol, B., Chou, S. H., Tsai, T. R. ( 2014). Real-time detection of wave profile changes. Computers & Industrial Engineering 75:187–199.
  • Christensen, R. ( 1990). Log-linear Models and Logestic Regression, 2nd ed. New York, NY: Spinger.
  • Dobson, A. J. ( 2002). An Introduction to Generalized Linear Models. Boca Raton, FL: Chapman & HallCRC.
  • Eyvazian, M., Noorossana, R, Saghaei, A, Amiri, A. ( 2011). Phase II monitoring of multivariate multiple linear regression profiles. Quality and Reliability Engineering International 27(3):281–296.
  • Ghazanfari, M., Alaeddini, A., Niaki, S. T. A., Aryanezhad, M. B. ( 2008). A clustering approach to identify the time of a step change in Shewhart control charts. Quality and Reliability Engineering International 24(7):765–778.
  • Huwang, L., Wang, Y. H. T., Xue, S., Zou, C. ( 2014). Monitoring general linear profiles using simultaneous confidence sets schemes. Computers & Industrial Engineering 68:1–12.
  • Kazemzadeh, R. B., Noorossana, R., Ayoubi, M. ( 2015). Change point estimation of multivariate linear profiles under linear drift. Communications in Statistics-Simulation and Computation 44(6):1570–1599.
  • Li, Z. H., Wang, Z. H. ( 2010). An exponentially weighted moving average scheme with variable sampling intervals for monitoring linear profiles. Computers & Industrial Engineering 59(4):630–637.
  • Mahmoud, M. A., Parker, P. A., Woodall, W. H., Hawkins, D. M. ( 2007). A change point method for linear profile data. Quality and Reliability Engineering International 23(2):247–268.
  • Movaffagh, A., Amiri, A. ( 2013). Monotonic change point estimation in the mean vector of a multivariate normal process. The International Journal of Advanced Manufacturing Technology 69(5–8):1895–1906.
  • Niaki, S. T. A., Khedmati. M. (2014). Monotonic change-point estimation of multivariate Poisson processes using a multi-attribute control chart and MLE. International Journal of Production Research 52(10):2954--2982.
  • Niaki, S. T. A., Khedmati, M. ( 2013). Change point estimation of high-yield processes with a linear trend disturbance. The International Journal of Advanced Manufacturing Technology 69(1–4):491–497.
  • Niaki, S. T. A., Khedmati, M. ( 2014). Change point estimation of high-yield processes experiencing monotonic disturbances. Computers & Industrial Engineering 69(1–4):82–92.
  • Noorossana, R., Heydari, M. ( 2009). Change point estimation of a process variance with a linear trend disturbance. Journal of Industrial Engineering International 2:25–30.
  • Noorossana, R., Saghaei, A., Amiri, A. ( 2011). Statistical Analysis of Profile Monitoring. Hoboken, NJ: John Wiley.
  • Noorossana, R., Shadman, A. ( 2009). Estimating the change point of a normal process mean with a monotonic change. Quality and Reliability Engineering International 25(1):79–90.
  • Noorossana, R., Eyvazian, M., Vaghefi, A. ( 2010). Phase II monitoring of multivariate simple linear profiles. Computers & Industrial Engineering 58(4):563–570.
  • Olsson, U. L. F. (2002). Generalized linear models: an applied approach, Studentlitteratur AB, ISBN-13: 978-9144041551.
  • Pacella, M., Semeraro, Q. ( 2011). Monitoring roundness profiles based on an unsupervised neural network algorithm. Computers & Industrial Engineering 60(4):677–689.
  • Perry, M. B., Joseph, J., Pignatiello, J. R., James, R. Simpson. ( 2007). Change point estimation for monotonically changing Poisson rates in SPC. International Journal of Production Research 45(8):1791–1813.
  • Samuel, T. R., Joseph, J., Pignatiello, J. R., James, A. C. ( 1998). Identifying the time of a step change in a normal process variance. Quality Engineering 10(3):529–538.
  • Shadman, A., Mahlooji, H., Yeh, A. B., Zou, C. ( 2014). A change point method for monitoring generalized linear profiles in phase I. Quality and Reliability Engineering International, doi:10.1002qre.1671 (published online).
  • Sharafi, A., Aminnayeri, M., Amiri, A., Rasouli, M. ( 2013a). Estimating the change point of Binary profiles with a linear trend disturbance. International Journal of Industrial Engineering 24(2):123–129.
  • Sharafi, A., Aminnayeri, M., Amiri, A. ( 2012a). Identifying the time of step change in Binary profiles. The International Journal of Advanced Manufacturing Technology 63(1–4):209–214.
  • Sharafi, A., Aminnayeri, M., Amiri, A. ( 2012b). Identifying the change point in monitoring Poisson regression profiles with linear trend disturbance. Journal of Quality Engineering and Management 1(1):39–44 ( In Farsi).
  • Sharafi, A., Aminnayeri, M., Amiri, A. ( 2013b). An MLE approach for estimating the time of step changes in Poisson regression profiles. Scientia Iranica 20(3):855–860.
  • Sogandi, F., Amiri, A. ( 2015). Estimating the time of a step change in Gamma regression profiles using MLE approach. International Journal of Engineering 28(2):230–238.
  • Sogandi, F., Amiri, A. ( 2014). Change point estimation of Gamma regression profiles with a linear trend disturbance. International Journal of Quality Engineering and Technology 4(4):352–368.
  • Soleimani, P., Noorossana, R., Amiri. A. ( 2009). Simple linear profiles monitoring in the presence of within profile autocorrelation. Computers & Industrial Engineering 3(57):1015–1021.
  • Vakilian, F., Amiri, A., Sogandi, F. (2015). Isotonic change point estimation in the AR(1) auto-correlated simple linear profiles. International Journal of Engineering-Transactions A: Basics 28(7):1059--1068.
  • Yeh, A. B., Huwang, L., Li, Y. M. ( 2009). Profile monitoring for a Binary response. IIE Transactions 41(11):931–941.
  • Zand, A, Yazdanshenas, N., Amiri, A. ( 2013). Change point estimation in phase I monitoring of logistic regression profile. The International Journal of Advanced Manufacturing Technology 67(9–12):2301–2311.
  • Zarandi, M. F., Alaeddini, A. ( 2010). A general fuzzy-statistical clustering approach for estimating the time of change in variable sampling control charts. Information Sciences 180(16):3033–3044.
  • Zou, C., Fugee, T., Zhaojun, W. ( 2007). Monitoring general linear profiles using multivariate exponentially weighted moving average schemes. Technometrics 49(4):395–409.
  • Zou, C., Yujuan, Z. H., Zhaojun, W. ( 2006). A control chart based on a change-point model for monitoring linear profiles. IIE Transactions 38(12):1093–1103.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.