References
- Aly, A. A., M. A. Mahmoud, and W. H. Woodall. 2015. A comparison of the performance of phase II simple linear profile control charts when parameters are estimated. Communications in Statistics – Simulation and Computation 44 (6):1432–40. doi:10.1080/03610918.2013.821484.
- Castagliola, P., W. Wu, M. B. C. Khoo, and S. Chakraborti. 2014. Synthetic phase II Shewhart-type attributes control charts when process parameters are estimated. Quality and Reliability Engineering International 30 (3):315–35. doi:10.1002/qre.1576.
- De Araújo Rodrigues, A. A., E. K. Epprecht, and M. S. De Magalhães. 2011. Double-sampling control chart for attributes. Journal of Applied Statistics 38 (1):87–112. doi:10.1080/02664760903266007.
- Diko, M. D., R. Goedhart, S. Chakraborti, R. J. M. M. Does, and E. K. Epprecht. 2017. Phase II control charts for monitoring dispersion when parameters are estimated. Quality Engineering 29 (4):605–22. doi:10.1080/08982112.2017.1288915.
- Faraz, A., C. Heuchenne, and E. Saniga. 2017. The np chart with guaranteed in-control average run lengths. Quality and Reliability Engineering International 33 (5):1057–66. doi:10.1002/qre.2091.
- Gandy, A., and J. T. Kvaløy. 2013. Guaranteed conditional performance of control charts via bootstrap methods. Scandinavian Journal of Statistics 40 (4):647–68. doi:10.1002/sjos.12006.
- Hashemian, S. M., R. Noorossana, A. Keyvandarian, and A. M. Shekary. 2016. Performance of adaptive np-chart with estimated parameter. International Journal of Quality & Reliability Management 33 (6):769–91. doi:10.1108/IJQRM-05-2014-0059.
- Hu, X., and P. Castagliola. 2017. Guaranteed conditional design of the median chart with estimated parameters. Quality and Reliability Engineering International 33 (8):1873–84. doi:10.1002/qre.2152.
- Hu, X., P. Castagliola, X. Zhou, and A. Tang. in press. Conditional design of the EWMA median chart with estimated parameters. Communications in Statistics – Theory and Methods doi:10.1080/03610926.2018.1440310.
- Jones, M. A., and S. H. Steiner. 2012. Assessing the effect of estimation error on risk-adjusted CUSUM chart performance. International Journal for Quality in Health Care 24 (2):176–81. doi:10.1093/intqhc/mzr082.
- Keefe, M. J., W. H. Woodall, and L. A. Jones-Farmer. 2015. The conditional in-control performance of self-starting control charts. Quality Engineering 27 (4):488–99. doi:10.1080/08982112.2015.1065323.
- Keyvandarian, A., R. Noorossana, S. M. Hashemian, and S. A. Maryam. 2017. Adaptive c-chart with estimated parameter. Communications in Statistics – Theory and Methods 46 (1):87–103. doi:10.1080/03610926.2014.985842.
- Khoo, M. B. C., W. L. Teoh, P. Castagliola, and M. H. Lee. 2013. Optimal designs of the double sampling X¯ chart with estimated parameters. International Journal of Production Economics 144 (1):345–57. doi:10.1016/j.cie.2013.11.001.
- Kumar, N., and S. Chakraborti. 2016. Phase II Shewhart-type control charts for monitoring times between events and effects of parameter estimation. Quality and Reliability Engineering International 32 (1):315–28. doi:10.1002/qre.1752.
- Saghir, A., S. Chakraborti, and I. Ahmad. 2017. On the performance of phase-I bivariate dispersion charts to non-normality. Quality and Reliability Engineering International 33 (3):637–56. doi:10.1002/qre.2046.
- Saghir, A., and A. Faraz. 2018. Approximate design and performance of the robust control charts for monitoring dispersion in Phase I. Quality and Reliability Engineering International 34 (2):175–87. doi:10.1002/qre.2246.
- Saleh, N. A., M. A. Mahmoud, M. J. Keefe, and W. H. Woodall. 2015a. The difficulty in designing Shewhart X¯ and X control charts with estimated parameters. Journal of Quality Technology 47 (2):127–37. doi:10.1080/00224065.2015.11918120.
- Saleh, N. A., M. A. Mahmoud, L. A. Jones-Farmer, I. Zwetsloot, and W. H. Woodall. 2015. Another look at the EWMA control chart with estimated parameters. Journal of Quality Technology 47 (4):363–82. doi:10.1080/00224065.2015.11918140.
- Saleh, N. A., I. M. Zwetsloot, M. A. Mahmoud, and W. H. Woodall. 2016. CUSUM charts with controlled conditional performance under estimated process parameters. Quality Engineering 28 (4):402–15. doi:10.1080/08982112.2016.1144072.
- Sun, L., B. X. Wang, B. Guo, and M. Xie. 2018. Synthetic exponential control charts with unknown parameter. Communications in Statistics – Simulation and Computation 47 (8):2360–77. doi:10.1080/03610918.2017.1343840.
- Wu, S., P. Castagliola, and M. B. C. Khoo. 2016. Run rules based phase II c and np charts when process parameters are unknown. Communications in Statistics – Theory and Methods 45 (4):1182–97. doi:10.1080/03610926.2013.861493.
- Zhang, M., X. Hou, Z. He, and Y. Xu. 2017. Performance comparison for the CRL control charts with estimated parameters for high-quality processes. Quality Technology & Quantitative Management 14 (1):31–43. doi:10.1080/16843703.2016.1191143.
- Zhang, M., F. M. Megahed, and W. H. Woodall. 2014. Exponential CUSUM charts with estimated control limits. Quality and Reliability Engineering International 30 (2):275–86. doi:10.1002/qre.1495.
- Zhang, X., and W. H. Woodall. 2017. Reduction of the effect of estimation error on in-control performance for risk-adjusted Bernoulli CUSUM chart with dynamic probability control limits. Quality and Reliability Engineering International 33 (2):381–6. doi:10.1002/qre.2014.
- Zhao, M. J., and A. R. Driscoll. 2016. The c-chart with bootstrap adjusted control limits to improve conditional performance. Quality and Reliability Engineering International 32 (8):2871–81. doi:10.1002/qre.1971.