196
Views
3
CrossRef citations to date
0
Altmetric
Article

Run length distribution for a modified EWMA scheme fitted with a stationary AR(p) model

, ORCID Icon & ORCID Icon
Pages 4260-4279 | Received 06 Oct 2019, Accepted 18 Jul 2021, Published online: 06 Aug 2021

References

  • Adegoke, N. A., M. Riaz, R. A. Sanusi, A. N. H. Smith, and M. D. M. Pawley. 2017. EWMA-type scheme for monitoring location parameter using auxiliary information. Computers & Industrial Engineering 114:114–29. doi:10.1016/j.cie.2017.10.013.
  • Alpuim, T., and A. El-Shaarawi. 2008. On the efficiency of regression analysis with AR(p) errors. Journal of Applied Statistics 35 (7):717–37. doi:10.1080/02664760600679775.
  • Andel, J. 1988. On AR(1) processes with exponential white noise. Communications in Statistics – Theory and Methods 17 (5):1481–95. doi:10.1080/03610928808829693.
  • Areepong, Y., and A. Novikov. 2008. Martingale approach to EWMA control chart for changes in exponential distribution. Journal of Quality Measurement and Analysis 4 (1):197–203.
  • Box, G. E. P., G. M. Jenkins, G. C. Reinsel, and G. M. Ljung. 2016. Time series analysis: Forecasting and control. 5th ed. Hoboken, NJ: John Wiley & Sons, Inc.
  • Brockwell, P. J., and R. A. Davis. 2012. Introduction to time series and forecasting. 2nd ed. New York: Springer-Verlag.
  • Champ, C. W., and S. E. Rigdon. 1991. A comparison of the Markov Chain and the integral equation approaches for evaluating the run length distribution of quality control charts. Communications in Statistics – Simulation and Computation 20 (1):191–203. doi:10.1080/03610919108812948.
  • Davison, K. R., and A. P. Donsig. 2002. Real analysis with real applications. Hoboken, NJ: Prentice Hall.
  • Diggle, P. J. 1990. Time series: A biostatistical introduction. Oxford: Clarendon Press.
  • Fellag, H., and M. Ibazizen. 2001. Estimation of the first-order autoregressive model with contaminated exponential white noise. Journal of Mathematical Sciences 106 (1):2652–6. doi:10.1023/A:1011318515549.
  • Flury, M. I., and M. B. Quaglino. 2018. Multivariate EWMA control chart with highly asymmetric gamma distributions. Quality Technology & Quantitative Management 15 (2):230–52. doi:10.1080/16843703.2016.1208937.
  • Frank, J., and J. R. Massey. 1951. The Kolmogorov-Smirnov test for goodness of fit. Journal of the American Statistical Association 46 (253):68–78.
  • Guidolin, M., and M. Pedio. 2018. Essentials of time series for financial applications. London: Elsevier Inc.
  • Henderson, G. R. 2001. EWMA and industrial applications to feedback adjustment and control. Journal of Applied Statistics 28 (3–4):399–407. doi:10.1080/02664760120034135.
  • Hussain, S., L. Song, S. Ahmad, and M. Riaz. 2018. On auxiliary information based improved EWMA median control charts. Scientia Iranica 25 (2):954–82.
  • Khan, N., M. Aslam, and C. H. Jun. 2017. Design of a control chart using a modified EWMA statistic. Quality and Reliability Engineering International 33 (5):1095–104. doi:10.1002/qre.2102.
  • Kuo, H. H. 2000. White noise distribution theory. Florida: CRC Press.
  • Li, Y., E. Pan, and Y. Xiao. 2020. On autoregressive model selection for the exponentially weighted moving average control chart of residuals in monitoring the mean of autocorrelated processes. Quality and Reliability Engineering International 36 (7):2351–69. doi:10.1002/qre.2701.
  • Montgomery, D. C. 2009. Introduction to statistical quality control. 6th ed. Hoboken, NJ: John Wiley & Sons, Inc.
  • Montgomery, D. C., and C. M. Mastrangelo. 1991. Some statistical process control methods for autocorrelated data. Journal of Quality Technology 23 (3):179–93. doi:10.1080/00224065.1991.11979321.
  • Montgomery, D. C., J. C. C. Torng, J. K. Cochran, and F. P. Lawrence. 1995. Statistically constrained economic design of the EWMA control chart. Journal of Quality Technology 27 (3):250–6. doi:10.1080/00224065.1995.11979597.
  • Morton, A. P., M. Whitby, M. L. McLaws, A. Dobson, S. McElwain, D. Looke, J. Stackelroth, and A. Sartor. 2001. The application of statistical process control charts to the detection and monitoring of hospital-acquired infections. Journal of Quality in Clinical Practice 21 (4):112–7. doi:10.1046/j.1440-1762.2001.00423.x.
  • Patel, A. K., and J. Divecha. 2011. Modified exponentially weighted moving average (EWMA) control chart for an analytical process data. Journal of Chemical Engineering and Materials Science 2:12–20.
  • Peerajit, W., Y. Areepong, and S. Sukparungsee. 2018. Numerical integral equation method for ARL of CUSUM chart for long-memory process with non-seasonal and seasonal ARFIMA models. Thailand Statistician 16 (1):26–37.
  • Peerajit, W., Y. Areepong, and S. Sukparungsee. 2019. Explicit analytical solutions for ARL of CUSUM chart for a long-memory SARFIMA model. Communications in Statistics – Simulation and Computation 48 (4):1176–90.
  • Phanthuna, P., Y. Areepong, and S. Sukparungsee. 2018. Numerical integral equation methods of average run length on modified EWMA control chart for exponential AR(1) process. Proceedings of the International MultiConference of Engineers and Computer Scientists 2018, ed. S. I. Ao, O. Castillo, C. Douglas, D. D. Feng, and A. M. Korsunsky, 845–7. Hong Kong: Newswood Limited.
  • Sanusi, R. A., M. Riaz, N. A. Adegoke, and M. Xie. 2017. An EWMA monitoring scheme with a single auxiliary variable for industrial processes. Computers & Industrial Engineering 114:1–10. doi:10.1016/j.cie.2017.10.001.
  • Sukparungsee, S., and Y. Areepong. 2017. An explicit analytical solution of the average run length of an exponentially weighted moving average control chart using an autoregressive model. Chiang Mai Journal of Science 44 (3):1172–9.
  • Sunthornwat, R., Y. Areepong, and S. Sukparungsee. 2017. Average run length of the long-memory autoregressive fractionally integrated moving average process of the exponential weighted moving average control chart. Cogent Mathematics 4 (1):1358536–11. doi:10.1080/23311835.2017.1358536.
  • Sunthornwat, R., Y. Areepong, and S. Sukparungsee. 2018. Average run length with a practical investigation of estimating parameters of the EWMA control chart on the long memory AFRIMA process. Thailand Statistician 16 (2):190–202.
  • Suriyakat, W., Y. Areepong, S. Sukparungsee, and G. Mititelu. 2012. On EWMA procedure for AR(1) observations with exponential white noise. International Journal of Pure and Applied Mathematics 77:73–83.
  • Tang, A., P. Castagliola, J. Sun, and X. Hu. 2019. Optimal design of the adaptive EWMA chart for the mean based on median run length and expected median run length. Quality Technology & Quantitative Management 16 (4):439–58. doi:10.1080/16843703.2018.1460908.
  • Weisang, G., and Y. Awazu. 2008. Vagaries of the Euro: An introduction to ARIMA modeling. Journal of the French Statistical Society 2 (1):45–55.
  • Weiß, C. H. 2011. Detecting mean increases in Poisson INAR(1) processes with EWMA control charts. Journal of Applied Statistics 38 (2):383–98. doi:10.1080/02664760903406520.
  • Woodall, W. H. 2006. The use of control charts in health-care and public-health surveillance. Journal of Quality Technology 38 (2):89–104. doi:10.1080/00224065.2006.11918593.
  • Zaman, B., M. H. Lee, M. Riaz, and M. R. Abujiya. 2019. An adaptive EWMA chart with CUSUM accumulate error-based shift estimator for efficient process dispersion monitoring. Computers & Industrial Engineering 135:236–53. doi:10.1016/j.cie.2019.06.012.
  • Zhang, N. F. 1998. A statistical control chart for stationary process data. Technometrics 40 (1):24–38. doi:10.1080/00401706.1998.10485479.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.