References
- Allen, D.M., Cady, F.B. (1982). Analyzing Experimental Data by Regression. Belmont, CA: Wadsworth.
- Baye, M.R., Parker, D.F. (1984). Combining ridge and principal component regression: a money demand illustration. Commun. Stat. Theor. Meth. 13(2):197–205.
- Hadi, A.S. (1992). A new measure of overall potential influence in linear regression. Comput. Stat. Data Anal. 14:1–27.
- Haith, D.A. (1976). Land use and water quality in New York rivers. J. Environ. Eng. Div. Am. Soc. Civ. Eng. 102:1–15.
- Hoerl, A.E., Kennard, R.W. (1970). Ridge regression: Biased estimation for non-orthogonal problems. Technometrics. 12:55–67.
- Jimichi, M., Inagaki, N. (1996). r-k class estimation in regression model with concomitant variables. Ann. Inst. Stat. Math. 48:89–95.
- Kadiyala, K. (1986). Mixed regression estimator under misspecification. Econ. Lett. 21:27–30.
- Kaçıranlar, S., Sakallıoğlu, S. (2001). Combining the Liu estimator and the principal component regression estimator. Commun. Stat. Theory Methods. 30:2699–2705.
- Kibria, B.M.G. (2003). Performance of some new ridge regression estimators. Commun. Stat. Theory Methods. 32:419–435.
- Liu, K. (1993). A new class of biased estimate in linear regression. Commun. Stat. Theory Meth. 22:393–402
- McDonald, G.C., Galarneau, D.I. (1975). A monte carlo evaluation of some ridge-type estimators. J. Am. Stat. Assoc. 70(350):407–416.
- Özkale, M. R., Kaçıranlar, S. (2007). Superiority of the r-d class estimator over some estimators by the mean square error matrix criterion. Stat. Prob. Lett. 77:438–446.
- Sarkar, N. (1989). Comparisons among some estimators in misspecified linear models with multicollinearity. Ann. Inst. Stat. Math. 41(4):717–724.
- Simpson, D.G., Ruppert, D., Carroll, R.J. (1992). On one-step GM estimates and stability of inferences in linear regression. J. Am. Stat. Assoc. 87(418):439–450.
- Uemukai, R. (2011). Small sample properties of a ridge regression estimator when there exist omitted variables. Stat. Papers 52:953–969.