88
Views
0
CrossRef citations to date
0
Altmetric
Research Article

Optimal replacement scheduling for a multi-component system with failure interaction

Pages 2092-2102 | Received 27 Apr 2022, Accepted 23 Aug 2022, Published online: 11 Sep 2022

References

  • Barlow, R. E, and L. C. Hunter. 1960. Optimum preventive maintenance policies. Operations Research 8 (1):90–100. doi:10.1287/opre.8.1.90.
  • Brown, M, and F. Proschan. 1983. Imperfect repair. Journal of Applied Probability 20 (4):851–9. doi:10.2307/3213596.
  • Chang, C. C. 2014. Optimum preventive maintenance policies for systems subject to random working time, replacement, and minimal repair. Computers & Industrial Engineering 67:185–94. doi:10.1016/j.cie.2013.11.011.
  • Chang, C. C. 2021. Optimal preventive replacement policy for operating products with renewing free-replacement warranty. Communications in Statistics - Theory and Methods 50 (18):4255–70. doi:10.1080/03610926.2020.1713371.
  • Chen, M., S. Mizutani, and T. Nakagawa. 2010. Random and age replacement policies. International Journal of Reliability, Quality and Safety Engineering 17 (1):27–39. doi:10.1142/S0218539310003652.
  • Chen, Y. L, and C. C. Chang. 2022. Optimum sequential preventive maintenance first or last policies with imperfect maintenance for a system subject to shocks. Communications in Statistics - Theory and Methods 51 (1):162–78. doi:10.1080/03610926.2020.1746807.
  • Jhang, J. P, and S. H. Sheu. 2000. Optimal age and block replacement policies for a multi-component system with failure interaction. International Journal of Systems Science 31 (5):593–603. doi:10.1080/002077200290902.
  • Murthy, D. N. P, and D. G. Nguyen. 1985. Study of a multi-component system with failure interaction. European Journal of Operational Research 21 (3):330–8. doi:10.1016/0377-2217(85)90153-5.
  • Nakagawa, T, and D. N. P. Murthy. 1993. Optimal replacement policies for a two-unit system with failure interaction. RAIRO - Operations Research 27 (4):427–38. doi:10.1051/ro/1993270404271.
  • Nakagawa, T, and X. Zhao. 2013. Comparisons of replacement policies with constant and random times. Journal of the Operations Research Society of Japan 56 (1):1–14. doi:10.15807/jorsj.56.1.
  • Nicolai, R. P, and R. Dekker. 2008. Optimal maintenance of multi-component systems: A review, 263–86, London, UK: Springer.
  • Pandey, M., M. J. Zuo, and R. Moghaddass. 2016. Selective maintenance scheduling over a finite planning horizon, Proceedings of the Institution of Mechanical Engineers. Part O: Journal of Risk and Reliability 230 (2):162–77. doi:10.1177/1748006X15598914.
  • Sheu, S. H., T. H. Liu, Z. G. Zhang, and H. N. Tsai. 2018. The generalized age maintenance policies with random working times. Reliability Engineering & System Safety 169:503–14. doi:10.1016/j.ress.2017.09.003.
  • Sugiura, T., S. Mizutani, and T. Nakagawa. 2004. Optimal random replacement policies. Tenth ISSAT International Conference on Reliability and Quality Design, 99–103.
  • Sung, C. K., S. H. Sheu, T. S. Hsu, and Y. C. Chen. 2013. Extended optimal replacement policy for a two-unit system with failure rate interaction and external shocks. International Journal of Systems Science 44 (5):877–88. doi:10.1080/00207721.2011.626905.
  • Tambe, P. P. 2022. Selective maintenance optimization of a multi-component system based on simulated annealing algorithm. Procedia Computer Science 200:1412–21. doi:10.1016/j.procs.2022.01.342.
  • Wang, G. J, and Y. L. Zhang. 2009. A geometric process repair model for a two-component system with shock damage interaction. International Journal of Systems Science 40 (11):1207–15. doi:10.1080/00207720903038010.
  • Wang, R., E. Dong, E. Cheng, L. Rong, and Q. Wang. 2021. Optimization of extended warranty cost for multi-component products with failure interaction. Discrete Dynamics in Nature and Society 2021:1–12. doi:10.1155/2021/5564740.
  • Xiao, L., S. Song, X. Chen, and D. W. Coit. 2016. Joint optimization of production scheduling and machine group preventive maintenance. Reliability Engineering & System Safety 146:68–78. doi:10.1016/j.ress.2015.10.013.
  • Yang, L., Y. Zhao, and X. Ma. 2019. Group maintenance scheduling for two-component systems with failure interaction. Applied Mathematical Modelling 71:118–37. doi:10.1016/j.apm.2019.01.036.
  • Zhang, Z., S. Wu, B. Li, and S. Lee. 2015. (n, N) type maintenance policy for multi component systems with failure interactions. International Journal of Systems Science 46 (6):1051–64. doi:10.1080/00207721.2013.807386.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.