References
- Brennecke , D. , “ Two Parameter Assembly Line Balancing Model ,” Models and Analysis for Production Management , ed. M. Hottenstein , International Textbook Company , Scranton , Pa. ( 1968 ).
- Bryton , B. , “ Balancing of a Continuous Production Line ,” Unpublished MS Thesis, Northwestern University, Evanston, Illinois ( June 1954 ).
- Ignall , E. , “ A Review of Assembly Line Balancing ,” Journal of Industrial Engineering , 16 , 4 , 244 – 254 ( July-Aug. 1965 ).
- Kottas , J. , and Lau , H. , “ A Cost-Oriented Approach to Stochastic Line Balancing ,” AIIE Transactions , 5 , 2 , 164 – 171 ( March 1973 ).
- Mastor , A. , “ An Experimental Investigation and Comparative Evaluation of Assembly Line Balancing Techniques ,” Management Science , 16 , 11 , 728 – 745 ( July 1970 ).
- Moodie , C. , and Young , A. , “ A Heuristic Method of Assembly Line Balancing for Assumptions of Constant or Variable Work Element Times ,” Journal of Industrial Engineering , 16 , 1 , 23 – 29 ( Jan.-Feb. 1965 ).
- Prenting , T. , and Thomopoulos , N. , Humanism and Technology in Assembly Line System , Hayden Book Company , Rochelle Park , N.J. ( 1974 ).
- Ramsing , K. , and Downing , R. , “ Assembly Line Balancing with Variable Element Times ,” Industrial Engineering , 41 – 43 ( Jan. 1970 ).
- Reeve , N. , and Thomas , W. , “ Balancing Stochastic Assembly Lines ,” AIIE Transactions , 5 , 3 , 223 – 229 ( Sept. 1973 ).
- Wester , L. , and Kilbridge , M. , “ A Review of Analytical Systems of Line Balancing ,” Operations Research , 10 , 5 , 626 – 638 ( Sept. 1962 ).