References
- Pinedo , M. ( 1995 ) Scheduling Theory, Algorithms and Systems , Prentice Hall , Englewood Cliffs , NJ .
- Gershwin , SB. ( 1994 ) Manufacturing Systems Engineering , Prentice Hall , Englewood Cliffs , NJ .
- Sethi , S.P. and Zhang , Q. ( 1995 ) Hierarchical Decision Making in Stochastic Manufacturing Systems , Birkhauser , Boston , MA .
- Caramanis , M. , Sharifnia , A. , Hu , J. and Gershwin , S. ( 1991 ) Development of a science base for planning and scheduling manufacturing systems , in Proceedings of the 1991 NSF Design and Manufacturing Systems Conference , Austin , TX . Society of Manufacturing Engineers, Dearborn, MI . pp. 27 – 40 .
- Kimemia , J.G. and Gershwin , S.B. ( 1983 ) An algorithm for the computer control of a flexible manufacturing system . HE Transactions , 15 ( 4 ), 353 – 362 .
- Maimon , O.Z. and Gershwin , S.B. ( 1988 ) Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines . Operations Research , 36 ( 2 ), 279 – 292 .
- Perkins , J.R. and Kumar , P.R. ( 1989 ) Stable, distributed, real-time scheduling of flexible manufacturing/assembly/ disassembly . IEEE Transactions on Automatic Control , 34 ( 2 ), 139 – 148 .
- Sousa , J.B. and Pereira , F.L. ( 1992 ) An hierarchical framework for the optimal flow control in manufacturing systems , in Proceedings of the Third International Conference on Computer Integrated Manufacturing , IEEE Computer Society Press , Los Alamos , CA . pp. 278 – 286 .
- Sharifnia , A. , Caramanis , M. and Gershwin , S.B. ( 1991 ) Dynamic setup scheduling and flow control in manufacturing systems . Discrete Event Dynamic Systems , 1 , 149 – 175 .
- Khmelnitsky , E. and Kogan , K. ( 1994 ) Necessary optimality conditions for a generalized problem of production scheduling . Optimal Control Applications and Methods , 15 , 215 – 222 .
- Kogan , K. and Khmelnitsky , E. ( 1996 ) An optimal control model for continuous-time production and setup scheduling . International Journal of Production Research , 34 ( 3 ), 715 – 725 .
- Epstein , R. , Kaluczky , S. , Waters , R. and Fraser , H. ( 1995 ) Periodic proving of tooling at Sikorsky Aircraft . Capstone Report , Boston University , 15 St Mary's Street , Boston , MA 02215 .
- Khmelnitsky , E. , Kogan , K. and Maimon , O. ( 1999 ) A time-decomposition method for sequence-dependent setup scheduling under pressing demand conditions . IEEE Transactions on Automatic Control , ( in the press ).
- Hartl , R.F. , Sethi , S.P. and Vickson , R.G. ( 1995 ) A survey of the maximum principles for optimal control problems with state constraints . SI AM Review , 37 ( 2 ), 181 – 218 .
- Khmelnitsky , E. , Kogan , K. and Maimon , O. ( 1995 ) A maximum principle based method for scheduling in a flexible manufacturing system . Discrete Event Dynamic Systems , 5 , 343 – 355 .