26
Views
23
CrossRef citations to date
0
Altmetric
Original Articles

An Evaluation of Scheduling Policies in a Dual Resource Constrained Assembly Shop

&
Pages 219-232 | Received 01 Mar 1984, Published online: 09 Jul 2007

References

  • Baker , K. R. , and Bertrand , J. , W.M. , “ An Investigation of Due-Date Assignment Rules with Constrained Tightness, ” Journal of Operations Management , ( 1981 ) 1 , 3 , 109 – 120 .
  • Berry , W. L. , “ Priority Scheduling and Inventory Control in Job Lot Manufacturing Systems ,” i-UTE TRANSACTIONS , 4 , 4 , 267 – 276 ( 1972 ).
  • Blackstone , I. H. , Jr. , Phillips , D. T. , and Hogg , G. L. , “ A State-of-the-Art Survey of Dispatching Rules for Manufacturing Job Shop Operations, ” International Journal of Production Research , ( 1982 ) 20 , 1 , 27 – 45 .
  • Buffa , E. S. and Miller , J. G. , Production-Inventory Systems, , 3rd ed. , Richard D. Irwin , 492–535 ( 1979 ) .
  • Bulkin , M. H. , Colley , J. L. , and Steinhoff , H. W. , Jr. , “ load Forecasting, Priority Sequencing, and Simulation in a Job Shop Control System, ” Management Science , ( 1966 ) 13 , 2 , 29 – 51 .
  • Conway , R. W. , “ An Experimental Investigation of Priority Assignment in a Job Shop ,” RAND Corporation Memorandum RM-3789-PR ( 1964 ) .
  • Conway , R. W. , Maxwell , W. L. , and Miller , L. W. , Theory of Scheduling , Addison-Wesley ( 1967 ) .
  • Dar-El , E. M. and Wysk , R. A. , “ Job Shop Scheduling-A Systematic Approach ,” Journal of Manufacturing Systems , 1 , 1 ( 1982 ).
  • Day , J. E. and Hottenstein , M. P. , “ Review of Sequencing Research, ” Naval Research Logistics Quarterly , ( 1970 ) 17 , 1 , 11 – 39 .
  • Eilon , S. and Chowdhury , I. G. , “ Due Dates in Job Shop Scheduling, ” International Journal of Production Research , ( 1976 ) 14 , 2 , 223 – 237 .
  • Eilon , S. and Hodgson , R. M. , “ Job Shop Scheduling with Due Dates, ” International Journal of Production Research , ( 1967 ) 6 , 1 , 1 – 13 .
  • Elmaghraby , S. E. , “ The Machine Sequencing Problem–Review and Extensions ,” Naval Research Logistics Quarterly , 15 , 2 , 2050232 ( 1968 ).
  • Elvers , D. A. , “ Job Shop Dispatching Rules Using Various Delivery Date Setting Criteria, ” Production end Inventory Management , ( 1973 ) 14 , 4 , 62 – 69 .
  • Fryer , J. S. , “ Effects of Shop Size and Labor Flexibility in Labor and Machine Limited Production Systems, ” Management Science , ( 1975 ) 21 , 5 , 507 – 515 .
  • Fryer , J. S. , “ Labor Flexibilities in Multiechelon Dual-Donstrained Job Shops, ” Management Science , ( 1974 ) 20 , 7 , 1073 – 1080 .
  • Fryer , J. S. , “ Operating Policies in Multiechelon Dual-Constraint Job Shops, ” Management Science , ( 1973 ) 10 , 9 , 1001 – 1012 .
  • Fryer , J. S. , “ Organizational Segmentation and Labor Transfer Policies in Labor and Machine Limited Production Systems, ” Decision Sciences , ( 1976 ) 7 , 4 , 725 – 738 .
  • Goodwin , J. S. and Goodwin , J. C. , “ Operating Policies for Scheduling Assembled Products, ” Decision Sciences , ( 1982 ) 13 , 4 , 585 – 603 .
  • Heard , E. L. , “ Due-Dates and Instantaneous Load in the One-Machine Shop ,” Management Science , 23 , 4 , 444 – 450 ( 1976 ).
  • Hogg , G. L. , Phillips , D. T. , Maggard , M. J. , and Lesso , W. G. , “ GERTS QR: A Model for Multi-Resource Constrained Queuing Systems Part I.; Concepts, Notations, and Examples, ” AHE TRANSACTIONS , ( 1975 ) 7 , 2 , 100 – 109 .
  • Hogg , G. L. , Phillips , D. T. , Maggard , M. J. , and Lesso , W. G. , “ GERTS QR: A Model for Multi-Resource Constrained Queuing Systems Part II: An Analysis of Parallel-Channel, Dual-Resource Constrained Queuing Systems with Homogeneous Resources ,” AIIE TRANSACTIONS .
  • Holstein , W. K. and Berry , W. L. , “ The Labor Assignment Decision: An Application of Work Flow Structure Information, ” Management Science , ( 1972 ) 18 , 7 , 390 – 400 .
  • Huang , P. Y. , Moore , L. J. , and Russell , R. S. , “ Workload Versus Scheduling Policies in a Dual Resource Constrained Job Shop, ” Computers and Operations Research , ( 1984 ) 11 , 1 , 37 – 48 .
  • Maggard , M. J. , “ An Evaluation of Labor and Machine Limited Parallel Queuing Systems ,” Unpublished PhD dissertation, UCLA , ( 1968 ) .
  • Maxwell , W. L. , “ Priority Dispatching and Assembly Operations in a Job Shop ,” RAND Corporation Memorandum RM-5370-PR ( 1969 ) .
  • Maxwell , W. L. and Mehra , M. , “ Multiple-Factor Rules for Sequencing with Assembly Constraints, ” Naval Research Logistics Quarterly , ( 1968 ) 15 , 2 , 241 – 254 .
  • Miller , L. W. , Ginsberg , A. S. , and Maxwell , W. L. , “ An Experimental Investigation of Priority Dispatching in a Simple Assembly Shop ,” in Logistics , Geisler M. , A. , ed. , North-Holland , 161–184 ( 1975 ) .
  • Moore , J. M. and Wilson , R. C. , “ A Review of Simulation Research in Job Shop Scheduling ,” Production and Inventory Management , 8 , 1 , 1 – 10 ( 1967 ).
  • Nelson , R. T. , “ A Simulation of Labor Efficiency and Centralized Assignment in a Production Model, ” Management Science , ( 1970 ) 17 , 2 , B97 - B106 .
  • Nelson , R. T. , “ Dual-Resource Constrained Series Service Systems, ” Operations Research , ( 1968 ) 16 , 2 , 324 – 341 .
  • Nelson , R. T. , “ Labor and Machine Limited Production Systems ,” Management Science , 13 , 9 , 648 – 671 ( 1967 ).
  • Pai , A. R. and McRoberts , K. L. , “ Simulation Research in Interchangeable Parts Manufacturing ,” Management Science , 17 , B732 - B743 ( 1971 ).
  • Panwalker , S. S. and Iskander , W. , “ A Survey of Scheduling Rules, ” Operations Research , ( 1977 ) 25 , 1 , 45 – 61 .
  • Pritsker , A. B. and Pegden , C. D. , Introduction to Simulation and SLAM , John Wiley and Sons ( 1979 ) .
  • Putnam , A. O. , Everdell , R. , Dorman , G. H. , Cronan , R. R. , and Lindgren , L. H. , “ Updating Critical Ratio and Slack Time Priority Scheduling Rules, ” Production and Inventory Management , ( 1971 ) 12 , 4 , 51 – 72 .
  • Rochette , R. and Sadowski , R. P. , “ A Statistical Comparison of the Performance of Simple Dispatching Rules for a Particular Set of Job Shops, ” International Journal of Production Research , ( 1976 ) 14 , 1 , 63 – 75 .
  • Siegel , G. B. , “ An Investigation of Job Shop Scheduling for Jobs with Assembly Constraints ,” Unpublished PhD Dissertation, Cornell University ( 1971 ) .
  • Weeks , J. K. , “ A Simulation Study of Predictable Due-Dates, ” Management Science , ( 1979 ) 25 , 4 , 363 – 373 .
  • Weeks , J. K. and Fryer , J. S. , “ A Methodology for Assigning Minimum Cost Due-Dates ,” Management Science , 23 , 8 , 872 – 881 ( 1977 ).
  • Weeks , J. K. and Fryer , J. S. , “ A Simulation Study of Operating Policies in a Hypothetical Dual-Constrained Job Shop, ” Management Science , ( 1976 ) 22 , 12 , 1362 – 1371 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.