References
- Afentakis , P. , Gavish , H. and Karmarkar , U. , “ Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems ,” Management Science , Vol. 30 , No. 2 ( 1984 ).
- Blackburn , Joseph D. and Robert Milieu , A. , “ Heuristic Lot-Sizing Performance in a Rolling-Schedule Environment ,” Decision Science , Vol. 11 , No. 4 ( 1980 ).
- Blackburn , Joseph D. and Robert Millen , A. , “ Improved Heuristics for Multi-Stage Requirements Planning Systems ,” Management Science , Vol. 28 , No. 1 ( 1982 ).
- Carlson , R. G. , Juckerand J. V. Kropp , D. , H. , “ MRP Systems: A Dynamic Economic Lot-Sizing Approach ,” Management Science , Vol. 25 , No. 8 ( 1979 ).
- Clark , Andrew J. and Scarf Herbert , “ Optimal Policies for a Multi-Echelon Inventory Problem ,” Management Science , Vol. 6 , No. 4 ( 1960 ).
- Crowston , Wallace B. , Wagner Michael and Williams , Jack F. , “ Economic Lot Size Determination in Multi-Stage Assembly Systems ,” Management Science , Vol. 19 , No. 5 ( 1973 ).
- DeBodt , M. A. and VanWassenhovc , L. , N. , “ Lot Sizes and Safety-Stocks in MRP: A Case Study ,” Production and Inventory Management , Vol. 24 , No. 1 ( 1983 ).
- Graves , Stephen C. , “ Multi-Stage Lot Sizing: An Iterative Procedure ,” TIMS Studies in the Management Sciences , Vol. 16 ( 1981 ).
- Kropp , D. H. and Carlson , R. , C. , “ A Lot-Sizing Algorithm for Reducing Nervousness in MRP Systems ,” Management Science , Vol. 30 , No. 2 ( 1984 ).
- Lowerre , W. M. , “ Lot Size Rules, Act II ,” Production and inventory Management , Vol. 24 , No. 3 ( 1980 ).
- Love , Stephen F. , “ A Facilities In Series Inventory Model With Nested Schedules ,” Management Science , Vol. 18 , No. 5 ( 1972 ).
- Maxwell , William L. and Singh Harpal , “ The Effect of Restricting Cycle Times in the Economic Lot Scheduling Problem ,” IEE Transactions , Vol. 15 , No. 3 ( 1983 ).
- Maxwell , William L. and John Muckstadt , A. , “ Establishing Consistent and Realistic Reorder Intervals in Production-Distribution Systems ,” Technical Report No. 561, Cornell University School of Operations Research and Industrial Engineering , ( 1983 ) .
- McClain , J. O. and Trigciro , W. , W. , “ Production Setup Patterns in Assembly Systems ,” Working Paper 8301, Graduate School of Management, Cornell University ( 1983 ) .
- Nuttle , Henry L.W. , “ Combining Stages in a Multi-Stage Lot Sizing Problem ,” NCSU-IE Technical Report No. 81–17, presented at ORSA/TIMS, Houston , TX , October 12, 1981 .
- Schonberger , R. J. , “ Some Observations on the Advantages and Implementation Issues of Just-in-Time Production Systems ,” Journal of Operations Management , Vol. 3 , No. I ( 1982 ).
- Schwarz , Leroy B. and Schrage Linus , “ Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems ,” Management Science , Vol. 21 , No. 11 ( 1975 ).
- Veinott , A. F. , Jr. , “ Minimum Concave Cost Solution of Leontief Substitution Models of Multi-Facility Inventory Systems ,” Operations Research , Vol. 17 , No. 3 , March-April 1969 .
- Williams , Jack F. , “ On the Optimally of Integer Lot Size Ratios in Economic Lot Size Determination in Multi-Stage Assembly Systems ,” Management Science , Vol. 28 , No. 11 ( 1982 ).
- Zangwill , W. I. , “ A Deterministic Multi-Period Multi-Facility Production and Inventory Model ,” Operations Research , Vol. 14 , No. 3 , ( 1966 ).