15
Views
19
CrossRef citations to date
0
Altmetric
Original Articles

A Directly-Coupled Two-Stage Unpaced Line

Pages 304-312 | Received 01 Oct 1984, Published online: 06 Jul 2007

References

  • Dattatreya , E. S. , “ Tandem Queuing Systems with Blocking ,” unpublished Ph.D. dissertation, University of California , Berkeley ( 1978 ).
  • Dudley , N. A. , Work Measurement: Some Research Studies , London : MacMillan ( 1968 ).
  • Hahn , G. J. , and Shapiro S. S. , Statistical Methods in Engineering , John Wiley ( 1968 ).
  • Hillier , F. , and Boling R. , “ The Effect of Some Design Factors on the Efficiency of Production Lines with Variable Operation Times ,” Journal of Industrial Engineering 17 , 651 – 658 ( 1966 ).
  • IMSL Library I Reference Manual , Houston : International Mathematical and Statistical Libraries ( 1982 ).
  • Kendal] , M. G. , and Stuart A. , The Advanced Theory of Statistics, Vol. 1 , Charles Griffin , London ( 1969 ).
  • Kottas , J. and Lau , H. S. , “ A Realistic Approach for Modeling Stochastic Lead Time Distributions ,” AIIE Transactions 11 , 54 – 60 ( 1979 ).
  • Kottas , J. and Lau , H. S. , “ The Use of Versatile Distribution Families in Some Stochastic Inventory Calculations ,” Journal of the Operational Research Society 31 , 393 – 403 ( 1980 ).
  • Lau , H. S. and Zaki , A. , “ The Sensitivity of Inventory Decisions to the Shape of Lead Time Demand Distribution ,” IIE Transactions 14 , 265 – 271 ( 1982 ).
  • Murrell , K. F. H. , “ Operator Variability and Its Industrial Consequences ,” International Journal of Production Research 1 , 39 – 55 ( 1962 ).
  • Muth , E. J. , “ The Reversibility Property of Production Lines ,” Research Report No, 78–1, Department of Industrial and Systems Engineering, University of Florida , Gainsville ( 1978 ).
  • Ord , J. K. , Families of Frequency Distributions , New York : Hafner ( 1972 ).
  • Rao , N. P. , “ On the Mean Production Rate of a Two-Stage Production System of the Tandem Type ,” International Journal of Production Research 13 , 207 – 217 ( 1975 ).
  • Rao , N. P. , “ Two-Stage Production Systems with Intermediate Storage ,” AIIE Transactions 7 , 414 – 421 ( 1975 ).
  • Schmeiser , B. , and Deutsch , S. , “ A Versatile Four Parameter Family of Probability Distributions Suitable for Simulation ,” AIIE Transactions 9 , 176 – 182 ( 1977 ).
  • Winkler , R. , Roodman , G. and Britney , R. , “ The Determination of Partial Moments ,” Management Science 19 , 290 – 296 ( 1972 ).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.