References
- Ballou , D. P. , and Pazer H. L. , “ The Impact of Inspector Fallibility on the Inspection Policy in Serial Production System ,” Management Science , Vol. 28 , No. 4 , April 1982 , pp. 387 – 399 .
- Blimey , R. R. , “ Optimal Screening Plans for Non-Serial Production Systems ,” Management Science , Vol. 18 , No. 9 , May 1972 , pp. 550 – 559 .
- Eppen , G. D. , and Hurst E. G. , “ Optimal Location of Inspection Stations In a Multistage Production Process ,” Management Science , Vol. 20 , No. 8 , April 1974 , pp. 1194 – 1200 .
- Lindsay , G. F. , and Bishop A. B. , “ Allocation of Screening Inspection Effort–-A Dynamic Programming Approach ,” Management Science , Vol. 10 . No. 2 , January 1964 , pp. 342 – 352 .
- Schwarz , L. B. , and Schrage L. , “ On Echelon Holding Cost ”, Management Science , Vol. 26 . No. 8 , 1978 , pp. 865 .
- Schwarz , L. B. , and Schrage L. , “ Optimal and System Myopic Policies for Multiechelon Production/Inventory Systems ,” Management Science , Vol. 21 , No. 11 , July 1975 .
- White , L. S. , “ Shortest Route Models for the Allocation Inspection Effort on a Production Line ,” Management Science , Vol. 15 , No. 5 , January 1969 , pp. 249 – 259 .
- White , L. S. , “ An Analysis of a Simple Class of Multi Stage Inspection Plans ,” Management Science , Vol. 12 , No. 9 , May 1966 , pp. 685 – 693 .
- Yum , B. J. , and McDowell E. D. , “ The Optimal Allocation of Inspection Effort In a Class of Non Serial Production Systems ,” AIIE Transactions , Vol. 13 , No. 4 , December 1981 , pp. 285 – 293 .
- Yasuhiro , M. Toyota Production System , Industrial Engineering and Management Press , Atlanta , Georgia , 1983 .