References
- Ballakur , A. and Steudel , H. J. , “ Integration of Job Shop Control Systems: A State-Of-The-Art Review ,” Journal of Manufacturing Systems , Vol. 3 , No. 1 , 1984 , pp. 71 – 79 .
- Bechte , W. , “ Relationship of Order Release, WIP, and MIX ” Working Paper, Southern Illinois University , 1982 .
- Belt , B. , “ Input/Output Illustrated ,” Production and Inventory Management , 2nd Quarter, 1978 .
- Bertrand , J. W. M. , “ The Effect of Workload Dependent Due-Dates on Job Shop Performance ,” Management Science , Vol. 29 , No. 7 , 1983 , pp. 799 – 816 .
- Bertrand , J. W. M. and Wortmann , J. C. , Production Control and Information Systems for Component-Manufacturing Shops , Elsevier Scientific Publishing Co. , Amsterdam , 1981 .
- Fabrycky , W. J. , “ Probabilistic Procedures for Sequencing and for Controlling Machine Center Capacities in Job Shops ,” Proceedings, Second Annual Systems Engineering Conference of the AIIE , November, 1974 .
- Irastorza , J. C. and Deane , R. H. , “ A Loading and Balancing Method for Job Shop Control ,” AIIE Transactions , Vol. 6 , No. 4 , 1974 , pp. 302 – 307 .
- Karni , R. , “ Capacity Requirements Planning–-A Systemization ,” International Journal of Production Research , Vol. 20 , No. 6 , 1982 , pp. 715 – 739 .
- Olhager , J. and Rapp , B. , “ Balancing Capacity and Lot Sizes ,” European Journal of Operational Journal , Vol. 19 , 1985 , pp. 337 – 344 .
- Onur , L. , “ A Dynamic Input/Output Control System for Job Shop Manufacturing Operations ,” Unpublished Ph.D. Dissertation, Virginia Polytechnic Institute and State University , 1985 , Available through University Microfilms.
- Shimoyashiro , S. , Isoda , K. and Awane , H. , “ Input Scheduling and Load Balance Control for A Job Shop ,” International Journal of Production Research , Vol. 22 , No. 4 , 1984 , pp. 597 – 605 .
- Tatsiopoulos , I. P. and Kingsman , B. G. , “ Lead Time Management ,” European Journal of Operational Research , Vol. 14 , 1983 , pp. 351 – 358 .