REFERENCES
- Baker , C. T. , and Dzielinski , B. P. “ Simulation of a Simplified Job Shop ,” Management Science , Vol. 6 . No. 3 ( April 1960 ), pp. 311 – 323 .
- Blackstone , John H. , Jr. , Phillips , Don T. , and Hogg , Gary L. , “ A State-of-the-Art Survey of Dispatching Rules for Manufacturing Job Shop Organizations ,” International Journal of Production Research , Vol. 20 , No. 1 ( 1982 ). pp. 27 – 45 .
- Conway , Richard W. , “ Priority Dispatching and Job Lateness ,” Journal of Industrial Engineering , Vol. 16 , No. n4 n ( July-August 1965 ), pp. 228 – 237 .
- ———, and Maxwell , W. L. , “ Network Dispatching by the Shortest-Operation Discipline ,” Operations Research , Vol. 10 , No. 1 ( January-February 1962 ), pp. 51 – 73 .
- Day , J. E. , and Hottenstcin , M. P. , “ Review of Sequencing Research ,” Naval Research Quarterly , Vol. 17 , No. 1 ( March 1970 ), pp. 11 – 39 .
- Elvers , Douglas A. , “ A Simulation of Job Shop Dispatching Rules Using Various Delivery Date Criteria ,” Proceedings of the Fourth Annual Meeting of the American Institute for Decision Sciences ( 1972 ), pp. 479 – 486 .
- ———, and Treleven , Mark , “ A Comparison of the Relative Performance of Dispatching Rules Job Shop vs. Hybrid Flow Shops ,” DecisionSciences , Vol. 16 , No. 2 ( Spring 1985 ), pp. 213 – 222 .
- Fryer , John Stanley , “ Operating Policies in Multiechelon Dual-Constraint Job Shops ,” Management Science , Vol. 19 , No. 9 ( May 1973 ),pp. 1001 – 1012 .
- Graves , Stephen C. , “ A Review of Production Scheduling ,” Operations Research. Vol. 29 , No. 4 ( July-August 1981 ), pp. 646 – 675 .
- Gunther , Richard E. , ‘ Server Transfer Delays in a Dual Resource Constrained Parallel Queueing System ,” Management Science , Vol. 25 , No. 12 ( December 1979 ), pp. 1245 – 1257 .
- Hogg , Gary L. , Phillips , Donald T. , and Maggard , Michael J. , “ Parallel-Channel, Dual-Resource Constrained Queuing Systems with Heterogeneous Resources ,” AllE Transactions , Vol 9 , No. 4 ( December 1977 ), pp. 352 – 362 .
- ———, ———, ——— Lesso , William G. , “ GERTS QR A Model for Multi-Resource Constrained Oueueing Systems Part II An Analysis of Parallel-Channel, Dual-Resource Constrained Queueing Systems with Homogeneous Resource Constrained Oueueing Systems with Homogeneous Resources ,” AllE Transactions , Vol. 7 , No. 2 ( June 1975 ), pp. 100 – 109 .
- Holstein , William K. , and Berry , William L. , “ The Labor Assignment Decision An Application of Work-Flow Structure Information ,” Management Science , Vol. 18 . No. 7 ( March 1972 ), pp. 390 – 400 .
- LeGrande , E. , “ The Development of a Factory Simulation Using Actual Operating Data ,” Management Technology , Vol. 3 , No. 1 ( May 1963 ), pp. 1 – 19 .
- Nelson , Rossei T. , “ Labor and Machine Limited Production Systems ,” Management Science , Vol. 13 , No. 9 ( May 1967 ), pp. 648 – 671 .
- Panwalker , S. S. , and Iskander , Wafik , “ A Survey of Scheduling Rules ,” Operations Research , Vol. 25 , No. n1 n ( January-February 1977 ), pp. 45 – 61 .
- Shapiro , S. S. , and Witk , M. B. , “ An Analysis of Variance Test for Normality (Complete Samples) ,” Biometrika , Vol. 52 ( 1965 ), pp. 591 – 611 .
- Treleven , Mark , “ The Timing of Labor Transfers in a Dual Resource Constrained System ,” Decision Sciences , Vol. 18 , No. 1 ( Winter 1987 ), pp. 73 – 88 .
- ———, Elvers , Douglas A. , “ An Investigation of Labor Assignment Rules in a Dual Constrained Job Shop ,” Journal of Operations Management , Vol. 6 , No. n1 n ( November 1985 ), pp, 51 – 68 , with Douglas A. Elvers .
- Weeks , James K. , and Fryer , John Stanley, “ A Simulation Study of Operating Policies in a Hypothetical Dual-Constrained Job Shop ,” Management Science , Vol. 22 , No. 12 ( August 1976 ), pp. 1362 – 1371 .
- Handled by the Scheduling/ Planning/Control Department