REFERENCES
- Buzacott , J. A. , “Automatic Transfer Lines with Buffer Stocks.” International Journal of Production Research , Vol. 5 , No. 3 , pp. 183 – 200 , 1967 .
- Buzacott , J. A. and Hanifin , L. E. , “Models of Automatic Transfer Lines with Inventory Banks-A Review and Comparison,” AIIETrans-actions . Vol, 10 , NO. 2 , pp. 197 – 207 , 1978 .
- lsayed , E. A. , andTurley R. E. , “Reliability Analysis of Production Systems with Buffer Storage,” International Journal of Production Research , Vol. 18 , No. 5 , pp. 637 – 645 , 1980 .
- Freeman , M. C. , “The Effects of Breakdowns and Interstage Storage on Production Line Capacity,” The Journal of Industrial Engineering , Vol, 15 , No. 4 , pp. 194 – 200 , 1964 .
- Gershwin , S. B. and Schick , I. C. , “Modelling and Analysis of Thrte-Stage Transfer Lines with Unreliable Machines and Finite Buffers.” Operations Research , Vol, 31 , No. 2 , pp. 354 – 380 , 1983 .
- Ho , Y. C. , Eyler , M. A. , andChien T. T. , “A Gradient Technique for General Buffer Storage Design in Production Line,” International Journal of Production Research ,Vol. 17 , No. 6 ,pp. 557 – 580 , 1979 .
- Jgnall , E. , Silver , A. , “The Output of a Two-Stage System with Unreliable Machines and Limited Storage,” AIIETransaaions , Vol. 9 , NO. 2 , pp, 183 – 188 , 1977 .
- Levin , A. A. , Pasko , N. I. , “Calculating the Output of Transfer Lines,” Machines and Tooling , Vol. 40 , No. 8 , pp. 12 – 16 , 1969 .
- Masso , J. and Smith , M. L. , “Interstage Storage for Three Stage Lines Subject to Stochastic Failures ” AIIE Transactions , Vol, 6 , No. 4 , pp, 354 – 358 , 1974 .
- Okamura , K. , Yamashina , H. , “Analysis of the Efect of Buffer Storage Capacity in Transfer Line Systems,” AIIE Transactions ,Vol 9 , NO. 2 , pp, 127 – 135 , 1977 .
- Okamura , K. and Yamashina , H. , “Justification for Installing Buffer Stocks in Unbalanced Two Stage Automatic Transfer Lines,” AIIE Transactions , Vol. 11 , No. 4 , pp. 308 – 312 , 1979 .
- Shaiithikumar , J. O. , and Tien , C. C. , “An Algorithmic Solution to Two-stage Transfer Lines with Possible Scrapping of Units,” Management Science , Vol. 29 , No. 9 , pp, 1069 – 1086 , 1983 .
- Sheskin , J. J. , “Allocation of Interstage Storage along an Automatic Production Line,” AIIE Transactions , Vol. 8 , No. 1 , pp. 146 – 152 , 1976 .
- Wijngaard , J. , “The Effect of Interstage Buffer Storage on the Output of Two Unreliable Production Units in Series with Different Production Rates,” AIIE Transactions , Vol. 11 , No. 1 , pp. 42 – 47 , 1979 .
- Yamashina , H. and Okamura , K. “Analysis of In-process Buffers for Multi-stage Transfer Line Systems,” International Journal of Production Research , Vol. 21 , No. 2 , pp. 183 – 195 , 1983 .
- Yeralan , S. , and Muth , E. J. , “A General Model of a Production Line with Intermediate Buffer and Station Breakdown,” HE Transactions . Vol, 19 , NO. 2 , pp, 130 – 139 , 1987 .