165
Views
83
CrossRef citations to date
0
Altmetric
Original Articles

NONPREEMPTIVE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING

&
Pages 74-81 | Received 01 Nov 1989, Published online: 31 May 2007

REFERENCES

  • Alvarez-Valdes , R. , andTamarit , J. M. , “ Heuristic Algorithms for Resource-Constrained Project Scheduling ,” in Slowiri-ski.R., Weglarz, J. (Eds) , Advances in Project Scheduling , Amsterdam , 134 – 143 ( 1989 ).
  • Anthonisse , J. M. , Van Hee , K. M. , and Lenstra , J. K. , “ Resource-Constrained Project Scheduling an International Exercise in DSS Development ,” Decision Support Systems , Vol. 4 , 249 – 257 ( 1988 ).
  • Arora , R. K. , and Sachdewa , R. K. , “ Distributed Simulation of Resource Constrained Project Scheduling ,” Compul. & Ops. Res. , Vol. 16 , 295 – 304 ( 1989 ).
  • Bartusch , M. , Mohring , R. H. , and Radermacher , F. J. , “ Scheduling Project Networks with Resource Constraints and Time Windows ,” Annals of Operations Research , Vol. 16 , 201 – 240 ( 1988 ).
  • Bartusch , M. , Mohring , R. H. , and Radermacher , F. I. , “ Design Aspects of an Advanced Model-Oriented DSS for Sched-uling Problems in Civil Engineering ,” Decision Support Systems , Vol. 5 , 321 – 344 ( 1989 ).
  • Blaiewicz , J. , Cellary , W. , Slowitiski , R. , and Weglarz , J. , “ Scheduling Under Resource Constraints - Deterministic Models ,” Annals of Operations Research , Vol. 7 ( 1986 ).
  • Christofides , N. , Alvarez-Valdes , R. , andTamarit , J. M. , “ Project Scheduling with Resource Constraints A Branch and Bound Approach ,” European Journal of Operational Research , Vol. 29 , 262 – 273 ( 1987 ).
  • Cooper , D. F. , “ Heuristics for Scheduling Resource-Constrained Projects An Experimental Investigation ,” Management Science , Vol. 22 , 1186 – 1134 ( 1976 ).
  • Dar-EI , E. M. , and Tur , Y. , “ Resource Allocation of a Multi-Resource Project for Variable Resource Availabilities ,” AJIE Transactions , Vol. 10 , 299 – 306 ( 1978 ).
  • Davis , E. W. , and Patterson , J. H. , “ A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling ,” Management Science , Vol. 21 , 944 – 955 ( 1975 ).
  • Domschke , W. , and Drexl , A. , “ Kapazitaetsplanung in Netz-werken — Ein Ueberblick ueber neuere Modelle und Verfah-ren ,” OR Spektrum , Vol. 13 , 63 – 76 ( 1991 ).
  • Drexl , A. , “ Scheduling of Project Networks by Job Assignment ,” Management Science , Vol. 37 , 1590 – 1602 ( 1991 ).
  • Elmaghraby , S. E. , Activity Networks Project Planning and Control by Network Models , New York ( 1977 ) .
  • Kim , S. , and Leachman , R. C. , “ Multi-Project Scheduling with Explicit Lateness Costs ,” HE Transactions , Vol. 25 , 34 – 44 ( 1993 ).
  • Kurtulus , I. S. , and Davis , E. W. , “ Multi-Project Scheduling Categorization of Heuristic Rules Performance ,” Management Science , Vol. 28 . 161 – 172 ( 1982 ).
  • Kurtulus , I. S. , and Narula , S. C. , “ Multi-Project Scheduling Analysis of Project Performance ,” HE Transactions , Vol. 17 , 58 – 66 ( 1985 ).
  • Leachman , R. C. , Dincerler , A. , and Kim , S. , “ Resource-Constrained Scheduling of Projects with Variable-Intensity Activities ," HE Transactions , Vol. 22 , 31 – 40 ( 1990 ).
  • Mohanty , R. P. , and Siddiq , M. K. , “ Multiple Projects — Multiple Resources — Constrained Scheduling Some Studies ,” International Journal of Production Research , Vol. 27 , 261 – 280 ( 1989 ).
  • Patterson , J. , Slowinski , R. , Talbot , B. , and Weglarz , J. , “ An Algorithm for a General Class of Precedence and Resource Constrained Scheduling Problems ,” in Slowinski, R., and Weglarz, J., (Eds.) , Advances in Project Scheduling , Amsterdam , 3 – 28 ( 1989 ).
  • Patterson , J. , Slowinski , R. , Talbot , B. , and Weglarz , J. , “ Computational Experience with a Backtracking Algorithm for Solving a General Class of Resource Constrained Scheduling Problems ,” European Journal of Operational Research , Vol. 49 , 68 – 79 ( 1990 ).
  • Pritsker , A. A. B. , Watters , W. D. , and Wolfe , P. M. , “ Multi-project Scheduling With Limited Resources A Zero-One Programming Approach ,” Management Science , Vol. 16 , 93 – 108 ( 1969 ).
  • Radermacher , F. J. , “ Scheduling of Project Networks ,” Annals of Operations Research , Vol. 4 , 227 – 252 ( 1985 / 1986 ).
  • Slowiński , R. , “ Two Approaches to Problems of Resource Allocation Among Project Activities - A Comparative Study ,” Journal of the Operational Research Society , Vol. 31 , 711 – 723 ( 1980 ).
  • Slowinski , R. , “ Multiobjective Network Scheduling With Efficient Use of Renewable and Nonrenewable Resources ,” European Journal of Operational Research , Vol. 7 , 265 – 273 ( 1981 ).
  • Stinson , J. P. , Davis , E. W. , and Khumawala , B. M. , “ Multiple Resource-Constrained Scheduling Using Branch and Bound ,” AJIE Transactions , Vol. 10 , 252 – 259 ( 1978 ).
  • Talbot , F. B. , “ Resource - Constrained Project Scheduling With Time-Resource Tradeoffs The Nonpreemptive Case ,” Management Science , Vol. 28 , 1197 – 1210 ( 1982 ).
  • Talbot , F. B. , and Patterson , J. H. , “ An Efficient Integer Programming Algorithm With Network Cuts for Solving Resource-Constrained Scheduling Problems ,” Management Science , Vol. 24 , 1163 – 1174 ( 1978 ).
  • Weglarz , J. , “ Project Scheduling With Continuously Divisible, Doubly-Constrained Resources ,” Management Science , Vol. 27 , 1040 – 1053 ( 1981 ).
  • Weiss , E. N. , “ An Optimization Based Heuristic for Scheduling Parallel Project Networks with Constrained Renewable Resources ,” HE Transactions , Vol. 20 , 137 – 143 ( 1988 ).
  • Handled by the Department of Planning, Scheduling, and Control.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.