References
- Mitra , D. and Mitrani , I. ( 1990 ) Analysis of a kanban discipline for cell coordination in production lines. I. Management Science , 36 , 1548 – 1566 .
- Muckstadt , J.A. and Tayur , S.R. ( 1995 ) A comparison of alternative kanban control mechanisms, I, II. HE Transactions , 27 ( 2 ), 140 – 161 .
- Mitra , D. and. Mitrani , I. ( 1991 ) Analysis of a kanban discipline for cell coordination in production lines. II. Stochastic demands. Operations Research , 39 , 807 – 823 .
- Duenyas , I. and Keblis , M. ( 1995 ) Release policies for assembly systems. HE Transactions, II , 507 – 518 .
- Chang , T.M. and Yih , Y. ( 1994 ) Generic kanban systems for dynamic environments. International Journal of Production Research , 32 ( 4 ), 889 – 902 .
- Chang , T.M. and Yih , Y. ( 1994 ) Determining the number of kanbans and lotsizes in a generic kanban system a simulated annealing approach. International Journal of Production Research , 32 , ( 8 ), 1991 – 2004 .
- Askin , R.G. , Mitsawi , M.G. and Goldberg , J.B. ( 1993 ) Determining the number of kanbans in multi-item just-in-time systems. HE Transactions , 25 , ( 1 ), 89 – 98 .
- Mitsawi , M.G. and Askin , R.G. ( 1994 ) Production planning for a multi-item, single-stage kanban system. International Journal of Production Research , 32 ( 5 ), 1173 – 1195 .
- Spearman , M.L. , Hopp , W.J. and Woodruff , D.L. ( 1990 ) CONWIP a pull alternative to kanban. International Journal of Production Research , 28 , 879 – 894 .
- Hopp , W.J. and Spearman , M.L. ( 1991 ) Throughput of a constant work in process manufacturing line subject to failures. International Journal of Production Research , 29 , 635 – 655 .
- Duenyas , I. , Hopp , W.J. and Spearman , M.L. ( 1993 ) Characterizing the output process of a CONWIP line with deterministic processing and random. Management Science , 39 , 975 – 988 .
- Duenyas , I. and Hopp , W.J. ( 1993 ) Characterizing the output process of a CONWIP line with deterministic processing and random outages. Management Science , 39 , 975 – 988 .
- Duenyas , I. ( 1994 ) Estimating the throughput of a cyclic assembly system. International Journal of Production Research , 32 , 1403 – 1419 .
- Buzacott , J.A. , Price , S. and Shanthikumar , J.G. ( 1992 ) Service levels in multistage MRP and base stock controlled production systems , in New Directions for Operations Research in Manufacturing , Fandel, G., Gulledge, T. and Jones, A. (eds ), Springer , Berlin , pp. 445 – 463 .
- Buzacott , J.A. and Shanthikumar , J.G. ( 1993 ) Stochastic Models of Manufacturing Systems , Prentice-Hall , Englewood Cliffs , NJ .
- Lee , Y.J. and Zipkin , P. ( 1992 ) Tandem queues with planned inventories. Operations Research , 40 , 936 – 947 .
- Rubio , R. and Wein , L.M. ( 1996 ) Setting base stock levels using product-form queueing networks. Management Science , 42 ( 2 ), 259 – 268 .
- Uzsoy , R. , Lee , C. Y. , Martin-Vega , L.A. , ( 1994 ) A review of production planning and scheduling models in the semiconductor industry, Part II. Shop floor control. HE Transactions on Scheduling and Logistics , 26 , 44 – 55 .
- Veatch , M.H. and Wein , L.M. ( 1994 ) Optimal control of a two-station tandem production/inventory system. Operations Research , 42 , 337 – 350 .
- Duenyas , I. ( 1994 ) A simple release policy for networks of queues with controllable inputs. Operations Research , 42 , 1162 – 1171 .
- Shanthikumar , J. and Gocmen , M. ( 1983 ) Heuristic analysis of closed queueing networks. International Journal of Production , 21 , 675 – 690 .