829
Views
19
CrossRef citations to date
0
Altmetric
Original Articles

Robust Airline Scheduling with Controllable Cruise Times and Chance Constraints

, &
Pages 64-83 | Received 01 Oct 2012, Accepted 01 Mar 2014, Published online: 10 Oct 2014

References

  • Ahmadbeygi, S., Cohn, A. and Lapp, M. (2010) Decreasing airline delay propagation by re-allocating scheduled slack. IIE Transactions, 42, 478–489.
  • Airbus. (1998) Airbus flight operations support and line assistance, “getting to grips with the cost index.” http://www.iata.org/whatwedo/Documents/fuel/airbus_cost_index_material.pdf (accessed May 10, 2010).
  • Aktürk, M. S., Atamtürk, A. and Gürel, S. (2014) Aircraft rescheduling with cruise speed control. Operations Research 62(4), 829–845.
  • Arıkan, M. and Deshpande, V. (2012) The impact of airline flight schedules on flight delays. Manufacturing & Service Operations Management, 14(3), 423–440.
  • Arıkan, M., Deshpande, V. and Sohoni, M. (2013) Building reliable air-travel infrastructure using empirical data and stochastic models of airline networks. Operations Research, 61(1), 45–64.
  • Barnhart, C. (2009) Irregular operations: schedule recovery and robustness, in The Global Airline Industry, Belobaba, P., Odoni, A. and Barnhart, C. (eds), Wiley, Chichester, UK, pp. 253–274.
  • Barnhart, C. and Cohn, A. (2004) Airline schedule planning: accomplishments and opportunities. Manufacturing & Service Operations Management, 6(1), 3–22.
  • Barnhart, C., Fearing, D., Odoni, A. and Vaze, V. (2012) Demand and capacity management in air transportation. EURO Journal of Transportation and Logistics, 1, 135–155.
  • Ben-Tal, A. and Nemirovski, A. (2001) Lectures on Modern Convex Optimization: Analysis, Algorithms, and Engineering Applications, SIAM, Philadepdia, PA.
  • Boeing., (2007) Fuel conservation strategies: cost index explained. AERO Quarterly, 2, 26–28.
  • BTS., (2010a) Airline on-time performance data. http://www.transtats.bts.gov/DL_SelectFields.asp?Table_ID=2 36&DB_Short_Name=On-Time (accessed June 2012).
  • BTS., (2010b) T-100 market data. http://www.transtats.bts.gov/Fields.asp?Table_ID=258 (accessed June 2012).
  • Charnes, A. and Cooper, W. W. (1959) Chance-constrained programming. Management Science, 6(1), 73–79.
  • Chiraphadhanakul, V. and Barnhart, C. (2013) Robust flight schedules through slack re-allocation. EURO Journal on Transportation and Logistics, 2(4), 277–306.
  • Clausen, J., Larsen, A., Larsen, J. and Rezanova, N. J. (2010) Disruption management in the airline industry—concepts, models and methods. Computers & Operations Research, 37, 809–821.
  • Cook, A. (2007) European Air Traffic Management—Principles, Practice and Research, Ashgate Publishing Company, Burlington, VT.
  • Cook, A., Tanner, G., Williams, V. and Meise, G. (2009) Dynamic cost indexing—managing airline delay costs. Journal of Air Transport Management, 15, 26–35.
  • Dunbar, M., Froyland, G. and Wu, C. L. (2012) Robust airline schedule planning: minimizing propogated delay in an integrated routing and crewing framework. Transportation Science, 46, 204–216.
  • Günlük, O. and Linderoth, J. (2010) Perspective reformulations of mixed integer nonlinear programs with indicator variables. Mathematical Programming, 124, 183–205.
  • Lan, S., Clarke, J. P. and Barnhart, C. (2006) Planning for robust airline operations: optimizing aircraft routings and flight departure times to minimize passenger disruptions. Transportation Science, 40(1), 15–28.
  • Luedtke, J., Ahmed, S., and Nemhauser, G. L. (2010) An integer programming approach for linear programs with probabilistic constraints. Mathematical Programming, 122, 247–272.
  • Marla, L. and Barnhart, C. (2010) Robust optimization: lessons learned from aircraft routing. Working Paper, Department of Civil and Environmental Engineering, Massachusetts Institute of Technology, Boston, MA.
  • Marla, L., Vaaben, B. and Barnhart, C. (2011) Integrated disruption management and flight planning to trade off delays and fuel burn. DTU Management Technical Report.
  • Petersen, J. D., Solveling, G., Clarke, J.-P., Johnson, E. L. and Shebalov, S. (2012) An optimization approach to airline integrated recovery. Transportation Science, 46, 482–500.
  • Sohoni, M., Lee, Y. and Klabjan, D. (2011) Robust airline scheduling under block-time uncertainty. Transportation Science, 45, 451–464.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.