References
- Alfieri, A. and Matta, A. (2012a) Mathematical programming formulations for approximate simulation of multistage production systems. European Journal of Operational Research, 219(3), 773–783.
- Alfieri, A. and Matta, A. (2012b) Mathematical programming representation of pull controlled single-product serial manufacturing systems. Journal of Intelligent Manufacturing, 23(1), 23–35.
- Anick, D., Mitra, D. and Sondhi, M. (1982) Stochastic theory of a data-handling system with multiple sources. Bell System Technical Journal, 61(8), 1871–1894.
- Bertsimas, D. (2014) Statistics and machine learning via a modern optimization lens. Presented at the 2014–2015 Philip McCord Morse Lecture. Available at https://www.informs.org/content/download/294435/2807281/version/1/file/2014+Morse+McCord+Lecture.pdf
- Bierbooms, J.J.P.H. (2012) Performance analysis of production lines: Discrete and continuous flow models. Ph.D. thesis, Technische Universiteit Eindhoven.
- Colledani, M. and Gershwin, S. (2013) A decomposition method for approximate evaluation of continuous flow multi-stage lines with general Markovian machines. Annals of Operations Research, 209(1), 5–40.
- Dallery, Y. (1994) On modeling failure and repair times in stochastic models of manufacturing systems using generalized exponential distributions. Queueing Systems, 15(1–4), 199–209.
- Diamantidis, A., Papadopoulos, C. and Vidalis, M. (2004) Exact analysis of a discrete material three-station one-buffer merge system with unreliable machines. International Journal of Production Research, 42(4), 651–675.
- Elwalid, A. and Mitra, D. (1991) Analysis and design of rate-based congestion control of high speed networks, I: Stochastic fluid models, access regulation. Queueing Systems, 9(1–2), 29–63.
- Fleuren, S., Bierbooms, R. and Adan, I. (2014) Performance analysis of exponential multi-server production lines with fluid flow and finite buffers. Stochastic Models, 30(4), 469–493.
- Gershwin, S. and Berman, O. (1981) Analysis of transfer lines consisting of two unreliable machines with random processing times and finite storage buffers. AIIE Transactions, 13(1), 2–11.
- Gershwin, S. and Werner, L. (2007) An approximate analytical method for evaluating the performance of closed-loop flow systems with unreliable machines and finite buffers. International Journal of Production Research, 45(14), 3085–3111.
- Helber, S. and Jusić, H. (2004) A new decomposition approach for non-cyclic continuous material flow lines with a merging flow of material. Annals of Operations Research, 125(1–4), 117–139.
- Helber, S., Schimmelpfeng, K., Stolletz, R. and Lagershausen, S. (2011) Using linear programming to analyze and optimize stochastic flow lines. Annals of Operations Research, 182(1), 193–211.
- Kim, J. and Gershwin, S. (2005) Integrated quality and quantity modeling of a production line. OR Spectrum, 27(2–3), 287–314.
- Kouikoglou, V. and Phillis, Y. (1994) Discrete event modeling and optimization of unreliable production lines with random rates. IEEE Transactions on Robotics and Automation, 10(2), 153–159.
- LeBihan, H. and Dallery, Y. (2000) A robust decomposition method for the analysis of production lines with unreliable machines and finite buffers. Annals of Operations Research, 93(1–4), 265–297.
- Levantesi, R., Matta, A. and Tolio, T. (2003) Performance evaluation of continuous production lines with machines having different processing times and multiple failure modes. Performance Evaluation, 51(2), 247–268.
- Matta, A. (2008) Simulation optimization with mathematical programming representation of discrete event systems, in Proceedings of the 2008 Winter Simulation Conference, Institute of Electrical and Electronics Engineers, Inc., Piscataway, NJ, pp. 1393–1400.
- Mitra, D. (1988) Stochastic theory of a fluid model of producers and consumers coupled by a buffer. Advances in Applied Probability, 20(3), 646–676.
- Özdoğru, Ü. and Altiok, T. (2003) Analysis of two-valve fluid-flow systems with general repair times, in Analysis and Modeling of Manufacturing Systems, Springer, Boston, MA, pp. 255–288.
- Poffe, A. and Gershwin, S. (2005) Integrating quality and quantity modelling in a production line. Technical Report ORC-377-05, Massachusetts Institute of Technology Operations Research Center Working Paper Series, Cambridge, MA.
- Schruben, L.W. (2000) Mathematical programming models of discrete event system dynamics, in Proceedings of the 2000 Winter Simulation Conference, Institute of Electrical and Electronics Engineers, Inc., Piscataway, NJ, pp. 381–385.
- Schwarz, J. and Stolletz, R. (2013) A sampling approach for the analysis of time-dependent stochastic flow lines, in Proceedings of the Ninth International Conference on Stochastic Models of Manufacturing and Service Operations, Catholic Univ. of Eichstatt-Ingolstadt, Ingolstadt, Germany, pp. 181–188.
- Tan, B. (2015) Mathematical programming representations of the dynamics of continuous-flow production systems. IIE Transactions, 47(2), 173–189.
- Tan, B. and Gershwin, S. (2009) Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer. International Journal of Production Economics, 120(2), 327–339.
- Tan, B. and Gershwin, S. (2011) Modelling and analysis of Markovian continuous flow systems with a finite buffer. Annals of Operations Research, 182(1), 5–30.
- Tolio, T., Matta, A. and Gershwin, S. (2002) Analysis of two-machine lines with multiple failure modes. IIE Transactions, 34(1), 51–62.
- Wijngaard, J. (1979) The effect of interstage buffer storage on the output of two unreliable production units in series, with different production rates. AIIE Transactions, 11(1), 42–47.
- Yeralan, S., Franck, W. and Quasem, M. (1986) A continuous materials flow production line model with station breakdown. European Journal of Operational Research, 27(3), 289–300.
- Yeralan, S. and Tan, B. (1997) A station model for continuous materials flow production systems. International Journal of Production Research, 35(9), 2525–2542.