Publication Cover
Sequential Analysis
Design Methods and Applications
Volume 39, 2020 - Issue 3
95
Views
1
CrossRef citations to date
0
Altmetric
Original Articles

A comparative study of ANI- and ARL-unbiased geometric and CCCG control charts

ORCID Icon &
Pages 399-416 | Received 31 Jul 2019, Accepted 12 May 2020, Published online: 06 Jan 2021

REFERENCES

  • Acosta-Mejia, C. 1999. “Improved p Charts to Monitor Process Quality.” IIE Transactions 31 (6):509–16. doi:10.1080/07408179908969854
  • Acosta-Mejia, C., and J. Pignatiello. Jr, 2000. “Monitoring Process Dispersion without Subgrouping.” Journal of Quality Technology 32 (2):89–102. doi:10.1080/00224065.2000.11979981
  • Calvin, T. 1983. “Quality Control Techniques for “Zero Defects.” IEEE Transactions on Components, Hybrids, and Manufacturing Technology 6 (3):323–8. doi:10.1109/TCHMT.1983.1136174
  • Chan, L., and S. Wu. 2009. “Optimal Design for Inspection and Maintenance Policy Based on the CCC Chart.” Computers & Industrial Engineering 57 (3):667–76. doi:10.1016/j.cie.2008.12.009
  • Chen, J. 2009. “A New Approach to Setting Control Limits of Cumulative Count of Conforming Charts for High-Yield Processes.” Quality and Reliability Engineering International 25 (8):973–86. doi:10.1002/qre.1015
  • Chen, J. 2013. “Design of Cumulative Count of Conforming Charts for High Yield Processes Based on Average Number of Items Inspected.” International Journal of Quality & Reliability Management 30 (9):942–57. doi:10.1108/IJQRM-01-2011-0014
  • Fallahnezhad, M., and V. Golbafian. 2017. “Economic Design of Cumulative Count of Conforming Control Charts Based on Average Number of Inspected Items.” Scientia Iranica. Transaction E, Industrial Engineering 24:330.
  • Goh, T. 1987. “A Control Chart for Very High Yield Processes.” Quality Assurance 13:18–22.
  • Golbafian, V., M. Fallahnezhad, and Y. Mehrjerdi. 2017. “A New Economic Scheme for CCC Charts with Run Rules Based on Average Number of Inspected Items.” Communications in Statistics - Theory and Methods 46 (24):12023–44. doi:10.1080/03610926.2017.1291967
  • Guo, B., and B. Wang. 2015. “The Design of the ARL-Unbiased S2 Chart When the in-Control Variance is Estimated.” Quality and Reliability Engineering International 31 (3):501–11. doi:10.1002/qre.1608
  • Huwang, L., C. Huang, and Y. Wang. 2010. “New EWMA Control Charts for Monitoring Process Dispersion.” Computational Statistics & Data Analysis 54 (10):2328–42. doi:10.1016/j.csda.2010.03.011
  • Kaminsky, F., J. Benneyan, R. Davis, and R. Burke. 1992. “Statistical Control Charts Based on a Geometric Distribution.” Journal of Quality Technology 24 (2):63–9. doi:10.1080/00224065.1992.12015229
  • Knoth, S. 2010. “Control Charting Normal Variance–Reflections, Curiosities, and Recommendations.” In Frontiers in Statistical Quality Control, vol. 9, edited by H.-J. Lenz and P.-T. Wilrich, 3–18. Heidelberg: Physica.
  • Knoth, S., and M. Morais. 2015. “On ARL-Unbiased Control Charts.” in Frontiers in Statistical Quality Control, vol. 11, 95–117. Cham: Springer.
  • Kumar, N., and A. Baranwal. 2019. “Design and Implementation of Qth Quantile-Unbiased tr-Chart for Monitoring Times between Events.” Quality and Reliability Engineering International 35 (4):1061–80. doi:10.1002/qre.2445
  • Kumar, N., S. Chakraborti, and A. C. Rakitzis. 2017. “Improved Shewhart-Type Charts for Monitoring Times between Events.” Journal of Quality Technology 49 (3):278–96. doi:10.1080/00224065.2017.11917995
  • Lehmann, E. L., J. P. Romano. 2005. Testing Statistical Hypotheses. New York: Springer-Verlag.
  • Liu, J., M. Xie, T. Goh, Q. Liu, and Z. Yang. 2006. “Cumulative Count of Conforming Chart with Variable Sampling Intervals.” International Journal of Production Economics 101 (2):286–97. doi:10.1016/j.ijpe.2005.01.006
  • Morais, M. 2016. “An ARL-Unbiased np-Chart.” Economic Quality Control 31 (1):11–21. doi:10.1515/eqc-2015-0013
  • Morais, M. 2017. “ARL-Unbiased Geometric and CCCG Control Charts.” Sequential Analysis 36:513–27.
  • Nelson, L. 1999. “Technical Aids: Notes on the Shewhart Control Chart.” Journal of Quality Technology 31 (1):124–6. doi:10.1080/00224065.1999.11979903
  • Ohta, H., E. Kusukawa, and A. Rahim. 2001. “A CCC-r Chart for High-Yield Processes.” Quality and Reliability Engineering International 17 (6):439–46. doi:10.1002/qre.428
  • Paulino, S., M. Morais, and S. Knoth. 2016. “An ARL-Unbiased c-Chart.” Quality and Reliability Engineering International 32 (8):2847–58. doi:10.1002/qre.1969
  • Pignatiello, J., Jr, C. Acosta-Mejia, and B. Rao. 1995. “The Performance of Control Charts for Monitoring Process Dispersion.” In Proceedings of 4th Industrial Engineering Research Conference, May 24-25, 1995, Nashville, TN.
  • Quesenberry, C. 1995. “On Properties of Binomial Q-Charts for Attributes.” Journal of Quality Technology 27 (3):204–13. doi:10.1080/00224065.1995.11979593
  • Schervish, M. J. 2012. Theory of Statistics, New York: Springer.
  • Shao, J. 2006. Mathematical Statistics: Exercises and Solutions, New York: Springer.
  • Steiner, S., and R. MacKay. 2004. “Effective Monitoring of Processes with Parts per Million Defective. A Hard Problem!.” In Frontiers in Statistical Quality Control, vol. 7, edited by H.-J. Lenz and P.-T. Wilrich, 140–9. Heidelberg: Physica-Verlag.
  • Szarka, J. L., III, and W. Woodall. 2011. “A Review and Perspective on Surveillance of Bernoulli Processes.” Quality and Reliability Engineering International 27 (6):735–52. doi:10.1002/qre.1256
  • Szarka, J. L., III, and W. Woodall. 2012. “On the Equivalence of the Bernoulli and Geometric CUSUM Charts.” Journal of Quality Technology 44 (1):54–62. doi:10.1080/00224065.2012.11917881
  • Tang, L., and W. Cheong. 2004. “Cumulative Conformance Count Chart with Sequentially Updated Parameters.” IIE Transactions 36 (9):841–53. doi:10.1080/07408170490473024
  • Toubia-Stucky, G., H. Liao, and J. Twomey. 2012. “A Sequential Bayesian Cumulative Conformance Count Approach to Deterioration Detection in High Yield Processes.” Quality and Reliability Engineering International 28 (2):203–14. doi:10.1002/qre.1236
  • Wu, Z., and T. Spedding. 2000. “A Synthetic Control Chart for Detecting Small Shifts in the Process Mean.” Journal of Quality Technology 32 (1):32–8. doi:10.1080/00224065.2000.11979969
  • Xie, M., and T. Goh. 1997. “The Use of Probability Limits for Process Control Based on Geometric Distribution.” International Journal of Quality & Reliability Management 14 (1):64–73. doi:10.1108/02656719710156789
  • Xie, M., T. Goh, and V. Kuralmani. 2000. “On Optimal Setting of Control Limits for Geometric Chart.” International Journal of Reliability, Quality and Safety Engineering 07 (01):17–25. doi:10.1142/S0218539300000031
  • Xie, M., T. Goh, and V. Kuralmani. 2012. Statistical Models and Control Charts for High-Quality Processes, New York: Springer.
  • Xie, M., T. Goh, and X. Lu. 1998. “A Comparative Study of CCC and CUSUM Charts.” Quality and Reliability Engineering International 14 (5):339–45. doi:10.1002/(SICI)1099-1638(199809/10)14:5<339::AID-QRE185>3.0.CO;2-S
  • Yang, S., and B. Arnold. 2016. “Monitoring Process Variance Using an ARL-Unbiased EWMA-p Control Chart.” Quality and Reliability Engineering International 32 (3):1227–35. doi:10.1002/qre.1829
  • Yang, Z., M. Xie, V. Kuralmani, and K. Tsui. 2002. “On the Performance of Geometric Charts with Estimated Control Limits.” Journal of Quality Technology 34 (4):448–58. doi:10.1080/00224065.2002.11980176
  • Yeh, A., R. Mcgrath, M. Sembower, and Q. Shen. 2008. “EWMA Control Charts for Monitoring High-Yield Processes Based on Non-Transformed Observations.” International Journal of Production Research 46 (20):5679–99. doi:10.1080/00207540601182252
  • Zhang, C., M. Xie, and T. Jin. 2012. “An Improved Self-Starting Cumulative Count of Conforming Chart for Monitoring High-Quality Processes under Group Inspection.” International Journal of Production Research 50 (23):7026–43. doi:10.1080/00207543.2011.649305
  • Zhang, L., K. Govindaraju, M. Bebbington, and C. Lai. 2004. “On the Statistical Design of Geometric Control Charts.” Quality Technology & Quantitative Management 1 (2):233–43. doi:10.1080/16843703.2004.11673075
  • Zhang, M., X. Hou, H. Chen, and S. He. 2019. “CCC-r Charts’ Performance with Estimated Parameter for High-Quality Process.” Quality and Reliability Engineering International 35 (4):946–58. doi:10.1002/qre.2438

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.