416
Views
11
CrossRef citations to date
0
Altmetric
Original Articles

Evaluation of Phase I analysis scenarios on Phase II performance of control charts for autocorrelated observations

, , &

References

  • Adams, B. M., and I. T. Tseng. 1998. Robustness of forecast-based monitoring schemes. Journal of Quality Technology 30 (4):328–339.
  • Alwan, L. C. 1992. Effects of autocorrelation on control chart performance. Communications in Statistics - Theory and Methods 21 (4):1025–1049.
  • Alwan, L. C., and H. V. Roberts. 1988. Time series modeling for statistical process control. Journal of Business & Economic Statistics 6 (1):87–95.
  • Apley, D. W., and J. Shi. 1999. The GLRT for statistical process control of autocorrelated processes. IIE Transactions 31 (12):1123–1134.
  • Box, G. E. P., G. M. Jenkins, and G. C. Reinsel. 1994. Time series analysis. 3rd ed., Englewood Cliffs, NJ: Prentice-Hall.
  • Boyles, R. A. 2000. Phase I analysis for autocorrelated processes. Journal of Quality Technology 32 (4):395–409.
  • Capizzi, G. 2015. Recent advances in process monitoring: Nonparametric and variable-selection methods for phase I and phase II. Quality Engineering 27(1):44–67.
  • Chakraborti, S., S. W. Human, and M. A. Graham. 2008. Phase I statistical process control charts: An overview. Quality Engineering 21 (1):52–62.
  • Crowder, S. V. 1987. A simple method for studying run-length distributions of exponentially weighted moving average charts. Technometrics 29 (4):401–407.
  • Dürre, A., R. Fried, and T. Liboschik. 2015. Robust estimation of (partial) autocorrelation. WIREs Computational Statistics 7 (3):205--222.
  • Fox, A. J. 1972. Outliers in time series. Journal of the Royal Statistical Society. Series B (Methodological) 34 (3):350–363.
  • Harris, T. J., and W. H. Ross. 1991. Statistical process control procedures for correlated observations. The Canadian Journal of Chemical Engineering 69 (1):48–57.
  • Jensen, W. A., L. A. Jones-Farmer, C. V. Champ, and W. H. Woodall. 2006. Effects of parameter estimation on control chart properties: A literature review. Journal of Quality Technology 38 (4):349–364.
  • Jiang, W. 2004. Multivariate control charts for monitoring autocorrelated processes. Journal of Quality Technology 36 (4):367–379.
  • Jones, L. A. 2002. The statistical design of EWMA control charts with estimated parameters. Journal of Quality Technology 34 (3):277–288.
  • Jones, R. H. 1980. Maximum likelihood fitting of ARMA models to time series with missing observations. Technometrics 22 (3):389–395.
  • Jones-Farmer, L. A., W. H. Woodall, S. H. Steiner, and C. W. Champ. 2014. An Overview of Phase I Analysis for Process Improvement and Monitoring. Journal of Quality Technology 46 (3): 265--280.
  • Knoth, S. 2014. Spc: Statistical process control – collection of some useful functions. http://cran.r-project.org/web/packages/spc/index.html: R Foundation for Statistical Computing.
  • Knoth, S., and W. Schmid. 2004. Control charts for time series: A review. In Frontiers in Statistical Quality Control, 7th ed. L. Hans-Joachim and W. Peter-Theodor, 210–236. Heidelberg, Germany: Physica-Verlag.
  • Kramer, H., and W. Schmid. 1997. Control charts for time series. Nonlinear Analysis 30 (7):4007–4016.
  • Kramer, H., and W. Schmid. 2000. The influence of parameter estimation on the ARL of Shewhart type charts for time series. Statistical Papers 41 (2):173–196.
  • Ledolter, J. 1989. The effect of additive outliers on the forecasts from ARMA models. International Journal of Forecasting 5 (2):231–240.
  • Lu, C. W., and M. R. Reynolds. 1999. Control charts for monitoring the mean and variance of autocorrelated processes. Journal of Quality Technology 31 (3):259–274.
  • Ma, Y., and M. G. Genton. 2000. Highly robust estimation of the autocovariance function. Journal of Time Series Analysis 21 (6):663–684.
  • Maragah, H. D., and W. H. Woodall. 1992. The effect of autocorrelation on the retrospective X-chart. Journal of Statistical Computation and Simulation 40 (1–2):29–42.
  • Montgomery, D. C. 2013. Statistical quality control: A modern introduction. 7th ed. New York: John Wiley & Sons Singapore Pte. Ltd.
  • Montgomery, D. C., C. Mastrangelo, F. W. Faltin, W. H. Woodall, J. F. MacGregor, and T. P. Ryan. 1991. Some statistical process control methods for autocorrelated data. Journal of Quality Technology 23 (2):179–204.
  • Mukundam, K., D. R. N. Varma, G. R. Deshpande, V. Dahanukar, and A. K. Roy. 2013. I-MR control chart: A tool for judging the health of the current manufacturing process of an API and for setting the trial control limits in phase I of the process improvement. Organic Process Research & Development 17:1002–1009.
  • R Core Team. 2014. R: A language and environment for statistical. Vienna, Austria, http://www.R-project.org: R Foundation for Statistical Computing.
  • Runger, G. C. 2002. Assignable causes and autocorrelation: Control charts for observations or residuals? Journal of Quality 34 (2):165–170.
  • Runger, G. C., and T. R. Willemain. 1995. Model-based and model-free control of autocorrelated processes. Journal of Quality Technology 27 (4):283–292.
  • Runger, G. C., T. R. Willemain, and S. Prabhu. 1995. Average run lengths for cusum control charts applied to residuals. Communications in Statistics—Theory and Methods 24 (1):273–282.
  • Schmid, W. 1995. On the run length of a Shewhart chart for correlated data. Statistical Papers 36 (1):111–130.
  • Testik, M. C. 2005. Model inadequacy and residuals control charts for autocorrelated processes. Quality and Reliability Engineering International 21 (2):115–130.
  • Weiß, C. H., and M. C. Testik. 2015. On the Phase I analysis for monitoring time-dependent count processes. IIE Transactions 47 (3):294–306.
  • Wiel, S. A. V. 1996. Monitoring processes that wander using integrated moving average models. Technometrics 38 (2):139–151.
  • Woodall, W. H., and D. C. Montgomery. 1999. Research issues and ideas in statistical process control. Journal of Quality Technology 31 (4):376–387.
  • Woodall, W. H., and D. C. Montgomery. 2014. Some current directions in the theory and application of statistical process monitoring. Journal of Quality Tehcnology 46 (1):78–94.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.