References
- Atalay, M., M. C. Testik, S. Duran, and C. H. Weiß. 2019. Guidelines for automating phase I of control charts by considering effects on Phase-II performance of individuals control charts. Quality Engineering. Advance online publication. doi:10.1080/08982112.2019.1641208.
- Deming, W. E. 2000. The new economics for industry, government, education. 2nd ed. London, England: MIT Press.
- Dodge, H. F., and H. G. Romig. 1929. A method of sampling inspection. Bell System Technical Journal 8 (4):613–31. doi:10.1002/j.1538-7305.1929.tb01240.x.
- Jensen, W. A., L. A. Jones-Farmer, C. W. Champ, and W. H. Woodall. 2006. Effects of parameter estimation on control chart properties: a literature review. Journal of Quality Technology 38 (4):349–64. doi:10.1080/00224065.2006.11918623.