454
Views
19
CrossRef citations to date
0
Altmetric
Original Articles

Accurate estimation of prediction models for operator-induced defects in assembly manufacturing processes

, &

References

  • Aft, L. S. 2000. Work measurement and methods improvement. Hoboken, NJ: John Wiley & Sons.
  • Antani, K. R. 2014. A study of the effects of manufacturing complexity on product quality in mixed-model automotive assembly. PhD. diss., Mechanical Engineering Department, Clemson University. http://tigerprints.clemson.edu/all_dissertations/1540.
  • Báez, Y. A., M. A. Rodriguez, J. Limon, and D. A. Tlapa. 2014. Model of human reliability for manual workers in assembly lines. Paper presented at the 2014 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 1448–1452, Bandar Sunway, Malaysia, December 9–12.
  • Bates, D. M., and D. G. Watts. 1988. Nonlinear regression analysis and its applications. Hoboken, NJ: John Wiley & Sons, Inc.
  • Caputo, A. C., P. M. Pelagagge, and P. Salini. 2017. Modelling human errors and quality issues in kitting processes for assembly lines feeding. Computers & Industrial Engineering 111:492–506. doi:10.1016/j.cie.2017.04.004.
  • Chiang, T.-L., and C.-T. Su. 2003. Optimization of TQFP molding process using neuro-fuzzy-GA approach. European Journal of Operational Research 147 (1):156–64. doi:10.1016/S0377-2217(02)00258-8.
  • Devore, J. L. 2011. Probability and statistics for engineering and the sciences. Boston, MA: Cengage Learning.
  • Draper, N. R., and H. Smith. 1998. Applied regression analysis. 3rd ed. New York: John Wiley & Sons.
  • Evans, J. W., J. Y. Evans, and B. Kil Yu. 1997. Designing and building-in reliability in advanced microelectronic assemblies and structures. IEEE Transactions on Components, Packaging, and Manufacturing Technology: Part A 20 (1):38–45.
  • Falck, A.-C., R. Örtengren, M. Rosenqvist, and R. Söderberg. 2017. Proactive assessment of basic complexity in manual assembly: Development of a tool to predict and control operator-induced quality errors. International Journal of Production Research 55 (15):4248–60. doi:10.1080/00207543.2016.1227103.
  • Ferrer, A. 2007. Multivariate statistical process control based on principal component analysis (MSPC-PCA): Some reflections and a case study in an autobody assembly process. Quality Engineering 19 (4):311–25. doi:10.1080/08982110701621304.
  • Gearbox, R. M., G. J. Pawar, and S. J. Mukhopadhyay. 2015. Application of design failure modes and effect analysis (DFMEA) to vertical. International Journal of Engineering Research 4 (12):663–7.
  • Genta, G., M. Galetto, and F. Franceschini. 2018. Product complexity and design of inspection strategies for assembly manufacturing processes. International Journal of Production Research 56 (11):4056–66. doi:10.1080/00207543.2018.1430907.
  • He, D. W., and A. Kusiak. 1997. Design of assembly systems for modular products. IEEE Transactions on Robotics and Automation 13 (5):646–55. doi:10.1109/70.631226.
  • Hinckley, C. M. 1994. A global conformance quality model. A new strategic tool for minimizing defects caused by variation, error, and complexity. Livermore, CA: Sandia National Lab. (SNL-CA).
  • Hinckley, C. M., and P. Barkan. 1995. A conceptual design methodology for enhanced conformance quality. Livermore, CA: Sandia National Labs.
  • Ishikawa, K. 1976. Guide to quality control: Industrial engineering and technology. Tokyo, Japan: Asian Productivity Organization.
  • Kang, C. W., M. B. Ramzan, B. Sarkar, and M. Imran. 2018. Effect of inspection performance in smart manufacturing system based on human quality control system. The International Journal of Advanced Manufacturing Technology 94 (9-12):4351–64. doi:10.1007/s00170-017-1069-4.
  • Kolus, A., R. Wells, and P. Neumann. 2018. Production quality and human factors engineering: A systematic review and theoretical framework. Applied Ergonomics 73:55–89. doi:10.1016/j.apergo.2018.05.010.
  • Krugh, M., K. Antani, L. Mears, and J. Schulte. 2016a. Statistical modeling of defect propensity in manual assembly as applied to automotive electrical connectors. Procedia CIRP 44:441–6. doi:10.1016/j.procir.2016.02.335.
  • Krugh, M., K. Antani, L. Mears, and J. Schulte. 2016b. Prediction of defect propensity for the manual assembly of automotive electrical connectors. Procedia Manufacturing 5:144–57. doi:10.1016/j.promfg.2016.08.014.
  • Kvålseth, T. O. 1983. Note on the R2 measure of goodness of fit for nonlinear models. Bulletin of the Psychonomic Society 21 (I):79–80.
  • Kvålseth, T. O. 1985. Cautionary note about R 2. The American Statistician 39 (4):279–85.
  • Land, C. E. 1974. Confidence interval estimation for means after data transformations to normality. Journal of the American Statistical Association 69 (347):795–802. doi:10.2307/2286020.
  • Le, Y., S. Qiang, and S. Liangfa. 2012. A novel method of analyzing quality defects due to human errors in engine assembly line. Paper presented at the 2012 International Conference on Information Management, Innovation Management and Industrial Engineering (ICIII), Vol. 3, 154–157, Sanya, China, October 20–21.
  • Liengme, B. 2008. A guide to Microsoft Excel 2007 for scientists and engineers. Cambridge, MA: Academic Press.
  • McCullagh, P., and J. Nelder. 1989. Generalized linear models, 2nd ed. London, UK: Chapman & Hall/CRC.
  • Miller, D. M. 1984. Reducing transformation bias in curve fitting. The American Statistician 38 (2):124–6. doi:10.2307/2683247.
  • Osborne, J. W. 2010. Improving your data transformations: Applying the Box-Cox transformation. Practical Assessment, Research & Evaluation 15 (12):1–9.
  • Perry, M. B. 2018a. Approximate prediction intervals in the original units when fitting models using data transformations. Quality and Reliability Engineering International 34 (1):53–65. doi:10.1002/qre.2235.
  • Perry, M. B. 2018b. Prediction intervals for the original response when using Manly’s exponential transformations. Quality Engineering 30 (2):195–211. doi:10.1080/08982112.2017.1357827.
  • Perry, M. B., and M. L. Walker. 2015. A prediction interval estimator for the original response when using Box–Cox transformations. Journal of Quality Technology 47 (3):278–97. doi:10.1080/00224065.2015.11918133.
  • Ping, Z., W. Hua, and C. Guanlong. 2008. Application of wavelet analysis to BIW assembly quality evaluation. International Journal of Manufacturing Technology and Management 14 (1/2):189–200. doi:10.1504/IJMTM.2008.017494.
  • Qin, R., E. A. Cudney, and Z. Hamzic. 2015. An Optimal plan of zero-defect single-sampling by attributes for incoming inspections in assembly lines. European Journal of Operational Research 246 (3):907–15. doi:10.1016/j.ejor.2015.05.054.
  • Sakia, R. M. 1988. Application of the Box-Cox transformation technique to linear balanced mixed analysis of variance models mixed with a multi-error structure. PhD. diss., Universität Hohenheim, FRG.
  • Sakia, R. M. 1990. Retransformation bias: A look at the Box-Cox transformation to linear balanced mixed ANOVA models. Metrika 37 (1):345–51. doi:10.1007/BF02613542.
  • Saptari, A., J. X. Leau, and N. A. Mohamad. 2015. The effect of time pressure, working position, component bin position and gender on human error in manual assembly line. Paper presented at the 2015 International Conference on Industrial Engineering and Operations Management (IEOM), 1–6, Dubai, United Arab Emirates, March 3–5.
  • Seber, G. A. F., and C. J. Wild. 1989. Nonlinear regression. New York: John Wiley & Sons.
  • Shibata, H. 2002. Global assembly quality methodology: A new methodology for evaluating assembly complexities in globally distributed manufacturing. PhD. diss., Mechanical Engineering Department, Stanford University.
  • Shibata, H., B. Cheldelin, and K. Ishii. 2003. Assembly quality methodology: A new method for evaluating assembly complexity in globally distributed manufacturing. Paper presented at the ASME 2003 International Mechanical Engineering Congress and Exposition, 335–344. PhD. diss., American Society of Mechanical Engineers.
  • Shin, D., R. A. Wysk, and L. Rothrock. 2006. An investigation of a human material handler on part flow in automated manufacturing systems. IEEE Transactions on Systems, Man and Cybernetics - Part A: Systems and Humans 36 (1):123–35. doi:10.1109/TSMCA.2005.859175.
  • Spiess, A. N., and N. Neumeyer. 2010. An evaluation of R2 as an inadequate measure for nonlinear models in pharmacological and biochemical research: A Monte Carlo approach. BMC Pharmacology 10 (1):1–11. doi:10.1186/1471-2210-10-6.
  • SPSS Inc. 2004. SPSS 13.0 Base user’s guide ®. Upper Saddle River, New Jersey, NJ: Prentice Hall.
  • Su, Q., L. Liu, and D. E. Whitney. 2010. A systematic study of the prediction model for operator-induced assembly defects based on assembly complexity factors. IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans 40 (1):107–20. doi:10.1109/TSMCA.2009.2033030.
  • Taylor, J. M. G. 1986. The retransformed mean after a fitted power transformation. Journal of the American Statistical Association 81 (393):114–8. doi:10.2307/2287976.
  • Vandebroek, M., L. Lan, and K. Knapen. 2016. An experimental diagnostic procedure to identify the source of defects in multi-stage and multi-component production processes. Journal of Quality Technology 48 (3):213–26. doi:10.1080/00224065.2016.11918162.
  • Vandevelde, B., A. Griffoni, F. Zanon, and G. Willems. 2018. Methodology for solder-joint lifetime prediction of LED-based PCB assemblies. IEEE Transactions on Device and Materials Reliability 18 (3):377–82. doi:10.1109/TDMR.2018.2849083.
  • Xiaoqing, T., W. Bo, and W. Shuchun. 2010. Quality assurance model in mechanical assembly. The International Journal of Advanced Manufacturing Technology 51 (9-12):1121–38. doi:10.1007/s00170-010-2679-2.
  • Yamagiwa, Y. 1988. An assembly ease evaluation method for product designers: DAC. Techno Japan 21 (12):26–29.
  • Zhang, F., and T. Luk. 2007. A data mining algorithm for monitoring PCB assembly quality. IEEE Transactions on Electronics Packaging Manufacturing 30 (4):299–305. doi:10.5772/711.
  • Zheng, S. 2000. Dynamic quality control in assembly systems. Iie Transactions 32 (9):797–806. doi:10.1080/07408170008967439.
  • Zhong, J., J. Liu, and J. Shi. 2010. Predictive control considering model uncertainty for variation reduction in multistage assembly processes. IEEE Transactions on Automation Science and Engineering 7 (4):724–35. doi:10.1109/TASE.2009.2038714.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.