References
- HenonB, MalhotraS. Remote welding and the Monticello recirculation pipe replacement project. Nucl Eng Int. 1985;11.
- BelkinSA, et al. The properties of welded joints in the DU-850 mm pipeline of the main circulation circuit of a nuclear power station, produced by automatic argon-arc welding. Energeticheskoe stroitel'stvo. 1992;5:50–55.
- TsaryukAK, et al. Selection of the technology of welding Du-850 elements of the main circulation circuit in replacing PGV-1000M steam generators in a nuclear power station. Avt Svarka. 2005;10.
- TsaryukAK, et al. Development and certification of the technology of narrow-gap argon-arc welding components of the DU-850 main circulation circuit of a nuclear power station. Avt Svarka. 2005;5:24–31.
- NovozhilovNM. Fundamentals of the metallurgy of arc welding in gases. Moscow: Mashinostroenie; 1979.