277
Views
16
CrossRef citations to date
0
Altmetric
Original Articles

Network part program approach based on the STEP-NC data structure for the machining of multiple fixture pallets

, , &
Pages 281-300 | Received 05 Jun 2012, Accepted 08 Jun 2013, Published online: 09 Jul 2013

References

  • Allen, R. D., J. A. Harding, and S. T. Newman. 2005. “The Application of STEP-NC Using Agent-based Process Planning.” International Journal of Computer Integrated Manufacturing 43 (4): 655–670.
  • Bhardwaj, B., and M. K. Tiwar. 2011. “Process Planning through Ant Colony Optimization.” In Evolutionary Computing in Advanced. Salem, MA: John Wiley & Sons, Scrivener Publishing.
  • Borgia, S., A. Matta, and T. Tolio. 2010. “STEP-NC Compliant Approach for Setup Planning Problem on Multiple Fixture Pallet.” In APMS International Conference, Como, October 11–13.
  • Borgia, S., and T. Tolio. 2008. “Design of Flexible Transfer Lines in Dynamic Environments: A Configuration Approach.” In Proceedings of 5th International Conference on Digital Enterprise Technology, Nantes, October 22–24, 509–526.
  • Chang, C. A., and V. Angkasith. 2001. “Using Hopfield Neural Networks for Operational Sequencing for Prismatic Parts on NC Machines.” Engineering Applications of Artificial Intelligence 14: 357–368.
  • Cobianchi, P., P. Moriggi, and T. Tullio. 2009. Method for automatically partitioning a part program into fundamental operations. EP2417498, February 21.
  • Colosimo, B. M., M. Pellizzaro, Q. Semeraro, and T. Tolio. 1999. “APPG1: A New Approach for Alternative Process Plans Generation.” In The 32nd CIRP International Seminar on Manufacturing Systems – New supporting tools for Designing Products and Production Systems, Leuven, May 24–26.
  • Colosimo, B. M., Q. Semeraro, and T. Tolio. 2000. “Rule Based System for Non-linear Process Plan Generation.” Studies in Informatics and Control 2 (9): 133–143.
  • Das, K., M. F. Baki, and X. Li. 2009. “Optimization of Operation and Changeover Time for Production Planning and Scheduling in a Flexible Manufacturing System.” Computers & Industrial Engineering 56 (1): 283–293.
  • Donaldson, I. A., and J. R. Corney. 2007. “Rule-based Feature Recognition for 2·5D Machined Components.” International Journal of Computer Integrated Manufacturing 6 (1–2): 51–54.
  • Feeney, A. B., T. Kramer, and F. Proctor. 2003. “STEP-NC Implementation – ARM or AIM?” White Paper. ISO T24 STEP-Manufacturing Meeting, San Diego, CA, February 12.
  • Fogliazza, G. 2004. “How Information Technology Enables the Potential Flexibility and Reconfigurabilty of Highly Automated Manufacturing Plants.” In IFAC Information Control Problem in Manufacturing, San Salvador, April 5–7.
  • Gologlu, C. 2004. “A Constraint-based Operation Sequencing for a Knowledge-based Process Planning.” Jounal of Intelligent Manufacture 15: 463–470.
  • Guo, Y. W., A. R. Mileham, G. W. Owen, and W. D. Li. 2006. “Operation Sequencing Optimization using a Particle Swarm Optimization Approach.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 220 (12): 1945–1958.
  • Haddadzade, M., M. R. Razfar, and M. Farahnakian. 2009. “Integrating Process Planning and Scheduling for Prismatic Parts Regard to Due Date.” World Academy of Science, Engineering and Technology 27: 64–67.
  • Hua, G., and X. Fan. 2010. “An Intelligent Approach of Obtaining Feasible Machining Processes and Their Selection Priorities for Features Based on Neural Network.” In International Conference on Computational Intelligence and Software Engineering (CiSE), 1–4. Washington, DC: IEEE.
  • Hua, G., X. Zhou, and X. Ruan. 2007. “GA-based Synthesis Approach for Machining Scheme Selection and Operation Sequencing Optimization for Prismatic Parts.” Journal of Advanced Manufacturing Technologies 33: 594–603.
  • IBM ILOG CPLEX. 2013. Accessed June 22. http://www-01.ibm.com/software/commerce/optimization/cplex-optimizer/.
  • ISO 10303-1. 1994. Industrial Automation Systems and Integration – Product Data Representation and Exchange, ISO/TC 184/SC 4.
  • ISO 10303-238. 2004. Industrial Automation Systems and Integration – Product Data Representation and Exchange – Part 238: Application Protocol: Application Interpreted Model for Computerized Numerical Controllers, ISO/TC 184/SC 4.
  • ISO 14649. 2003. Data Model for Computerized Numerical Controllers – Parts 1, 10, 11, 12, 111, 121, ISO/TC 184/SC 1.
  • ISO 22514-1. 2009. Statistical Methods in Process Management – Capability and Performance – Part 1: General Principles and Concepts, ISO/TC 69/SC 4.
  • ISO 22514-3. 2008. Statistical Methods in Process Management – Capability and Performance – Part 3: Machine Performance Studies for Measured Data on Discrete Parts, ISO/TC 69/SC 4.
  • ISO 3534-3. 1999. Statistics – Vocabulary and Symbols – Part 3: Design of Experiments, ISO/TC 69/SC 1.
  • ISO 6983. 1982. Numerical Control of Machines – Program Format and Definition of Address Words, ISO/TC 184/SC 1.
  • ISO/TR 22514-4. 2007. Statistical Methods in Process Management – Capability and Performance – Part 4: Process Capability Estimates and Performance Measures, ISO/TC 69/SC 4.
  • Krishna, A. G., and K. M. Rao. 2006. “Optimisation of Operations Sequence in CAPP using an Ant Colony Algorithm.” The International Journal of Advanced Manufacturing Technology 29: 159–164.
  • Kruth, J. D. 1992. “A CAPP System for Nonlinear Process Plans.” Annals of the CIRP 41 (1): 489–492.
  • Kruth, J. P., G. Van Zeir, J. Kempenaers, and J. Pinte. 1996. “Methods to Improve the Response Time of a CAPP System that Generates Non-linear Process Plans.” Advances in Engineering Software 25 (1): 9–17.
  • Koren, Y., and M. Shpitalni. 2010. “Design of Reconfigurable Manufacturing Systems.” Journal of Manufacturing Systems 29 (4): 130–141.
  • Kumar, C., and S. Deb. 2012. “Generation of Optimal Sequence of Machining Operations in Setup Planning by Genetic Algorithms.” Journal of Advanced Manufacturing Systems 11: 67.
  • Kumar, V., M. Pandey, M. Tiwari, and D. Ben-Arieh. 2010. “Simultaneous Optimization of Parts and Operations Sequences in SSMS: A Chaos Embedded Taguchi Particle Swarm Optimization Approach.” Journal of Intelligent Manufacturing 21 (4): 225–353.
  • Laguionie, R., M. Rauch, J.-Y. Hascoët, and S.-H. Suhm. 2011. “An Extended Manufacturing Integrated System for Feature-based Manufacturing with STEP-NC.” International Journal of Computer Integrated Manufacturing 24 (9): 785–799.
  • Lee, D.-H., D. Kiritsis, and P. Xirouchakis. 2001. “Search Heuristics for Operation Sequencing in Process Planning.” International Journal of Production Research 39 (16): 3771–3788.
  • Lee, W., Y.-B. Bang, M. S. Ryou, W. H. Kwon, and H. S. Jee. 2006. “Development of a PC-based Milling Machine Operated by STEP-NC in XML Format.” Journal of Computer Integrated Manufacturing 19 (6): 593–602.
  • Li, W. D., and C. A. McMahon. 2007. “A Simulated Annealing-based Optimization Approach for Integrated, Process Planning and Scheduling.” International Journal of Computer Integrated Manufacturing 20 (1): 80–95.
  • Lin, C.-J., and H.-P. Wang. 1993. “Optimal Operation Planning and Sequencing: Minimization of Tool Changeovers.” International Journal of Production Research 31 (2): 331–324.
  • Liu, R., C. Zhang, and S. T. Newman. 2006. “A Framework and Data Processing for Interfacing CNC with AP238.” International Journal of Computer Integrated Manufacturing 19 (6): 516–522.
  • Ma, G. H., Y. F. Zhang, and A. Y. C. Nee. 2000. “A Simulated Annealing-based Optimization Algorithm for Process Planning.” International Journal of Production Research 38 (12): 2671–2687.
  • Matta, A., and T. Tolio. 2001. “A Simulation Study of Tool Management Policy in FMS with Network Part Program.” In Proceedings of the CIRP International Conference on Agile, Reconfigurable Manufacturing, Ann Arbor, MI, May 21–22.
  • Matta, A., F. Tontini, and T. Tolio. 2004. “Tool Management in flexible Manufacturing Systems with Network Part Program.” International Journal of Production Research 42 (17): 3707–3730.
  • Miao, H. K., N. Sridharan, and J. J. Shan. 2002. “CAD-CAM Integration using Machining Features.” International Journal of Computer Integrated Manufacturing 15 (4): 296–318.
  • Molina, A., C. A. Rodriguez, H. Ahuett, J. A. Cortés, M. Ramírez, G. Jiménez, and S. Martinez. 2005. “Next-generation Manufacturing Systems: Key Research Issues in Developing and Integrating Reconfigurable and Intelligent Machines.” International Journal of Computer Integrated Manufacturing 18 (7): 525–536.
  • Montgomery, D. C. 2004. Design and Analysis of Experiments. New York: Wiley.
  • Moon, C., Y. Seo, and Y. H. Lee. 2002. “Integrated Machine Tool Selection and Operation Sequencing with Capacity and Precedence Constraints using Genetic Algorithm.” Computers and Industrial Engineering 43 (3): 605–621.
  • Nassehi, A., R. Liu, and S. T. Newman. 2007. “A New Software Platform to Support Feature-based Process Planning for Interoperable STEP-NC Manufacture.” International Journal of Computer Integrated Manufacturing 20 (7): 669–783.
  • Nassehi, A., S. T. Newman, and R. D. Allen. 2006. “The Application of Multi-agent System for STEP-NC Computer Aided Process Planning of Prismatic Components.” International Journal of Machine Tools & Manufacture 46 (5): 559–574.
  • Newman, S. T., R. D. Allen, and R. S. U. Russo Jr. 2003. “CAD/CAM Solutions for STEP-compliant CNC Manufacture.” International Journal of Computer Integrated Manufacturing 16 (7–8): 590–597.
  • Ohashi, K. 1999. “Dynamic Process Planning System for a Machining Center in an FMS Environment.” Internatinal Journal of Production Economics 60– 61: 475–464.
  • Pandev, V., M. K. Tiwari, and S. Kumar. 2006. “An Interactive Approach to Solve the Operation Sequencing Problem using Simulated Annealing.” International Journal of Advanced Manufacturing Technologies 29: 1212–1231.
  • Pellegrinelli, S., and T. Tolio. 2013. “Pallet Operation Sequencing based on Network Part Program Logic.” Robotics and Computer-Integrated Manufacturing On-line http://www.sciencedirect.com/science/article/pii/S0736584513000252.
  • Qiao, L., X. Y. Wang, and S. C. Wang. 2000. “A GA-based Approach to Machining Operation Sequencing for Prismatic Parts.” International Journal of Production Research 38 (14): 3283–3303.
  • Shabaka, A. I., and H. A. ElMaraghy. 2008. “A Model for Generating Optimal Process Plans in RMS.” International Journal of Computer Integrated Manufacturing 21 (2): 180–194.
  • Suh, S.-H., D.-H. Chung, B.-E. Lee, S. Shin, I. Choi, and K.-M. Kim. 2006. “Step-compliant cnc System for Turning: Data Model, Architecture, and Implementation.” Computer-Aided Design 38 (6): 677–688.
  • Tolio, T. 2009. Design of Flexible Production Systems: Methodologies and Tools. Berlin: Springer.
  • Wang, L. H., H. Y. Feng, and N. X. Cai. 2003. “Architecture Design for Distributed Process Planning.” Journal of Manufacturing Systems 22 (2): 99–115.
  • Xu, X., H. Wang, J. Mao, S. T. Newman, T. R. Kramer, F. M. Proctor, and J. L. Michaloskid. 2005. “STEP-compliant NC Research: The Search for Intelligent CAD/CAPP/CAM/CNC Integration.” International Journal of Production Research 43 (17): 3703–3743.
  • Xu, X., P. Klemm, F. Proctor, and S. H. Suh. 2006. “STEP-compliant Process Planning and Manufacturing.” International Journal of Computer Integrated Manufacturing 19 (6): 491–494.
  • Xun, X., W. Xu, L. Wang, and Y. Rong. 2006. “STEP-NC and Function Blocks for Interoperable Manufacturing.” IEEE Transactions on Automation Science and Engineering 3 (3): 297–308.
  • Yao, S., X. Han, Y. Yang, Y. Rong, S. H. Huang, D. W. Yen, and G. Zhang. 2007. “Computer Aided Manufacturing Planning for Mass Customization: Part 2, Automated Setup Planning.” International Journal of Advanced Manufacturing Technologies 32: 205–217.
  • Yusof, Y., N. Z. Z. Tan, and N. Kasim. 2009. “Exploring the ISO14649 (STEP-NC) for Intelligent Manufacturing System.” European Journal of Scientific Research 36 (3): 445–457.
  • Yusof, Y. 2009. “STEP-NC-compliant System for the Manufacturing Environment.” World Academy of Science, Engineering and Technology 25: 922–927.
  • Zhao, Y. F., S. Habeeb, and X. Xu. 2009. “Research into Integrated Design and Manufacturing Based on STEP.” International Journal of Computer Integrated Manufacturing 44 (5–6): 606–624.
  • Zhang, W. B., and G. Y. Zhu. 2011. “Comparison and Application of Four Versions of Particle Swarm Optimization Algorithms in the Sequence Optimization.” Expert Systems with Applications 38 (7): 8858–8864.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.