247
Views
5
CrossRef citations to date
0
Altmetric
Original Articles

The navigation process of mould-manufacturing scheduling optimisation by applying genetic algorithm

&
Pages 1331-1349 | Received 18 Mar 2013, Accepted 22 Sep 2014, Published online: 18 Nov 2014

References

  • Applegate, D., and W. Cook. 1991. “A Computational Study of the Job-Shop Scheduling Problem.” ORSA Journal on Computing 3 (2): 149–156. doi:10.1287/ijoc.3.2.149.
  • Arkat, J., M. H. Farahani, and F. Ahmadizar. 2012. “Multi-Objective Genetic Algorithm for Cell Formation Problem Considering Cellular Layout and Operations Scheduling.” International Journal of Computer Integrated Manufacturing 25 (7): 625–635. doi:10.1080/0951192X.2012.665182.
  • Choy, K. L., Y. K. Leung, H. K. H. Chow, T. C. Poon, C. K. Kwong, G. T. S. Ho, and S. K. Kwok. 2011. “A Hybrid Scheduling Decision Support Model for Minimizing Job Tardiness in a Make-to-order Based Mould Manufacturing Environment.” Expert Systems with Applications 38 (3): 1931–1941. doi:10.1016/j.eswa.2010.07.125.
  • Choy, K. L., Y. K. Leung, and C. K. Kwong. 2010. “A Real-Time Hybrid Information-Sharing and Decision Support System for the Mould Industry.” The Journal of High Technology Management Research 21 (1): 64–77. doi:10.1016/j.hitech.2010.02.008.
  • Do Ngoc, A. D., S. H. Lee, and I. Moon. 2013. “Hybrid Genetic Algorithm for Test Bed Scheduling Problems.” International Journal of Production Research 52 (4): 1074–1089. doi:10.1080/00207543.2013.838327.
  • Eckerson, W. W. 1995. “Three Tier Client/Server Architecture: Achieving Scalability, Performance, and Efficiency in Client/Server Applications.” Open Information Systems 3 (20): 1–12.
  • Gaafar, L. K., S. A. Masoud, and A. O. Nassef. 2008. “A Particle Swarm-Based Genetic Algorithm for Scheduling in an Agile Environment.” Computers & Industrial Engineering 55 (3): 707–720. doi:10.1016/j.cie.2008.01.020.
  • Gen, M., Y. Tsujimura, and E. Kobota. 1994. “Solving Job-Shop Scheduling Problems by Genetic Algorithms.” Systems, Man, and Cybernetics, Humans, Information and Technology 2 (2–5): 1577–1582.
  • Godley, P. M., D. E. Cairns, J. Cowie, and J. McCall. 2008. “Fitness Directed Intervention Crossover Approaches Applied to Bio-Scheduling Problems.” Proceedings of the IEEE International Conference on Computational Intelligence in Bioinformatics and Computational Biology, Sun Valley, ID, September 15–17, 120–127.
  • Huang, R. H., C. L. Yang, and W. C. Cheng. 2013. “Flexible Job Shop Scheduling with Due Window – A Two-Pheromone Ant Colony Approach.” International Journal of Production Economics 141 (2): 685–697. doi:10.1016/j.ijpe.2012.10.011.
  • Hun, X. B., and E. Di Paolo. 2007. “An Efficient Genetic Algorithm with Uniform Crossover for the Multi-Objective Airport Gate Assignment Problem.” Proceeding of the IEEE International Conference on Evolutionary Computation, Singapore, September 25–28, 55–62.
  • Jiang, P. N. 2003. “Application of Ant Colony System in Job-Shop Scheduling Problem.” Master thesis, National Taiwan University of Science and Technology, Taiwan.
  • Jong, W. R., T. C. Lin, P. J. Lai, T. C. Li, C. H. Wu, and M. Y. Li. 2009. “Integration of Mold Design and Mold Manufacturing.” SPE Technical Papers 55: 1775–1780.
  • Jong, W. R., C. H. Wu, H. H. Liu, and M. Y. Lee. 2009. “A Collaborative Navigation System for Concurrent Mold Design.” The International Journal of Advanced Manufacturing Technology 40 (3–4): 215–225. doi:10.1007/s00170-007-1328-x.
  • Kamrul Hasan, S. M., R. Sarker, and D. Essam. 2011. “Genetic Algorithm for Job-Shop Scheduling with Machine Unavailability and Breakdowns.” International Journal of Production Research 49 (16): 4999–5015. doi:10.1080/00207543.2010.495088.
  • Lawrence, S. 1984. Resource Constrained Project Scheduling: An Experimental Investigation of Heuristic Scheduling Techniques. Pittsburgh, PA: GSIA, Carnegie Mellon University.
  • Liu, K. C. 1998. “Dispatching Rules for Stochastic Finite Capacity Scheduling.” Computers and Industrial Engineering 35 (1–2): 113–116. doi:10.1016/S0360-8352(98)00033-3.
  • Musharavati, F., and A. S. M. Hamouda. 2011. “Modified Genetic Algorithms for Manufacturing Process Planning in Multiple Parts Manufacturing Lines.” Expert Systems with Applications 38 (9): 10770–10779. doi:10.1016/j.eswa.2011.01.129.
  • Muth, J. F., and G. L. Thompson. 1963. Industrial Scheduling. Englewood Cliffs, NJ: Prentice Hall.
  • Na, H., and J. Park. 2013. “Multi-Level Job Scheduling in a Flexible Job Shop Environment.” International Journal of Production Research 52 (13): 3877–3887. doi:10.1080/00207543.2013.848487.
  • Sun, L., X. Cheng, and Y. Liang. 2010. “Solving Job Shop Scheduling Problem Using Genetic Algorithm with Penalty Function.” International Journal of Intelligent Information Processing 1 (2): 65–77. doi:10.4156/ijiip.vol1.issue2.7.
  • Wang, J. 2005. “Constraint-Based Schedule Repair for Product Development Projects with Time-Limited Constraints.” International Journal of Production Economics 95 (3): 399–414. doi:10.1016/j.ijpe.2004.02.005.
  • Wang, L., and D. Z. Zheng. 2001. “An Effective Hybrid Optimization Strategy for Job-Shop Scheduling Problems.” Computers & Operations Research 28 (6): 585–596. doi:10.1016/S0305-0548(99)00137-9.
  • Wong, C. S., F. T. S. Chan, and S. H. Chung. 2012. “A Genetic Algorithm Approach for Production Scheduling with Mould Maintenance Consideration.” International Journal of Production Research 50 (20): 5683–5697. doi:10.1080/00207543.2011.613868.
  • Yoon, H., S. Koh, and R. Logendran. 2012. “Skid Scheduling Algorithm for a Shipbuilding Company.” International Journal of Production Research 50 (10): 2774–2784. doi:10.1080/00207543.2011.590539.
  • Zhang, G., L. Gao, and Y. Shi. 2011. “An Effective Genetic Algorithm for the Flexible Job-Shop Scheduling Problem.” Expert Systems with Applications 38 (4): 3563–3573. doi:10.1016/j.eswa.2010.08.145.
  • Zhang, L., L. Gao, and X. Li. 2013. “A Hybrid Genetic Algorithm and Tabu Search for a Multi-Objective Dynamic Job Shop Scheduling Problem.” International Journal of Production Research 51 (12): 3516–3531. doi:10.1080/00207543.2012.751509.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.