250
Views
14
CrossRef citations to date
0
Altmetric
Original Articles

Intelligent search techniques for network-based manufacturing systems: multi-objective formulation and solutions

, &
Pages 850-869 | Received 01 Sep 2014, Accepted 11 Jul 2015, Published online: 31 Mar 2016

References

  • Chang, P. C., S. H. Chen, C. Y. Fan, and C. L. Chan. 2008. “Genetic Algorithm Integrated with Artificial Chromosomes for Multi-objective Flowshop Scheduling Problems.” Applied Mathematics and Computation 205: 550–556.
  • Chaube, A., L. Benyoucef, and M. K. Tiwari. 2012. “An Adapted NSGA-2 Algorithm Based Dynamic Process Plan Generation for Reconfigurable Manufacturing System.” Journal of Intelligent Manufacturing 23 (4): 1141–1155. doi:10.1007/s10845-010-0453-9.
  • Chiang, T. C., H. C. Cheng, and L. C. Fu. 2011. “NNMA: An Effective Memetic Algorithm for Solving Multiobjective Permutation Flow Fhop Scheduling Problems.” Expert Systems with Applications 38 (5): 5986–5999.
  • Chou, Yu-Cheng, Huajun Cao, and Harry H. Cheng. 2013. “A Bio-inspired Mobile Agent-based Integrated System for Flexible Autonomic Job Shop Scheduling.” Journal of Manufacturing Systems 32: 752–763.
  • Chryssolouris, G., and S. Chan. 1985. “An Integrated Approach to Process Planning and Scheduling.” Annals of the CIRP 34: 413–417.
  • Chryssolouris, G., S. Chan, and W. Cobb. 1984. “Decision Making on the Factory Floor: An Integrated Approach to Process Planning and Scheduling.” Robotics and Computer-Integrated Manufacturing 1: 413–417.
  • Chu, Y., F. You, J. M. Wassick, and A. Agarwal. 2015. “Integrated Planning and Scheduling Under Production Uncertainties: Bi-level Model Formulation and Hybrid Solution Method.” Computers & Chemical Engineering 72: 255–272. http://dx.doi.org/10.1016/j.eswa.2011.11.074.
  • Davis, L. 1991. Handbook of Genetic Algorithms. New York: Van Nostrand Reinhold.
  • Deb, K., and T. Goel. 2001. “Controlled Elitist Non-dominated Sorting Genetic Algorithms for Better Convergence.” In Proceedings of the First International Conference on Evolutionary Multi-criterion Optimization (EMO-2001), March, 385–399. Berlin: Springer.
  • Deb., K., A. Pratap, S. Agarwal, and T. Meyarivan. 2002. “A Fast and Elitist Multi-objective Genetic Algorithm: NSGA-II.” IEEE Transactions on Evolutionary Computing 6: 182–197. Gen, M., and R. Cheng. 1997. Genetic Algorithms and Engineering Design, 432pp. New York: John Wiley and Sons.
  • Dong, J. J., and H. R. Parsaei. 1994. “Design and Implementation of a Feature-Based Automated Process Planning (FBAPP) System.” Computers & Industrial Engineering 27 (1): 1–4.
  • Gaalman, G. J. and N. C. Suresh. 1999. “Towards an Integration of Process Planning and Production Planning and Control for Flexible Manufacturing Systems.” International Journal of Flexible Manufacturing Systems 11 (1): 5–17.
  • Gen, M., R. Cheng, and L. Lin. 2008. Network Models and Optimization: Multi-objective Genetic Algorithm Approach. London: Springer.
  • Goldberg, D. E. 1989. Genetic Algorithms in Search Optimization and Machine Learning. New York: Addison-Wesley.
  • Iwata, K., and Y. Fukuda. 1989. “A New Proposal of Dynamic Process Planning in Machine Shop.” Proceedings of the CIRP International Workshop on Computer-Aided Process Planning, Hannover, September 21–22.
  • Joo, J., S. Park, and H. Cho. 2001. “Adaptive and Dynamic Process Planning Using Neural Networks.” International Journal of Production Research 39 (13): 2923–2946.
  • Kempenaers, J., J. Pinte, J. Detand, and J. P. Kruth. 1996. “A Collaborative Process Planning and Scheduling System.” Advances in Engineering Software 25 (1): 3–8.
  • Khoshnevis, B., and Q. M. Chen. 1990. “Integration of Process Planning and Scheduling Functions”. Journal of Intelligent Manufacturing 1: 165–176.
  • Khoshnevis, B., and Q. Chen. 1989. “Integration of Process Planning and Scheduling Function.” In Proceedings of IIE Integrated Systems Conference and Society for Integrated Manufacturing Conference, 415–420. Atlanta, GA: Industrial Engineering & Management Press.
  • Kim, K. H., and P. J. Egbelu. 1999. “Scheduling in a Production Environment with Multiple Process Plans per Job.” International Journal of Production Research 37 (12): 2725–2753.
  • Kim, Y. K., K. Park, and J. Ko. 2003. “A Symbiotic Evolutionary Algorithm for the Integration of Process Planning and Job Shop Scheduling”. Computers and Operations Research 30: 1151–1171.
  • Larsen, N. E. 1993. “Methods for Integration of Process Planning and Production Planning”. International Journal of Computer Integrated Manufacturing 6: 152–162.
  • Li, W. D., and C. A. McMahon. 2007. “A Simulated Annealing-based Optimization Approach for Integrated Process Planning and Scheduling”. International Journal of Computer Integrated Manufacturing 20: 80–95.
  • Li, X., L. Gao, and X. Shao. 2012. “An Active Learning Genetic Algorithm for Integrated Process Planning and Scheduling.” Expert Systems with Applications 39: 6683–6691.
  • Li, X. Y., and Z. Chaoyong. 2010. “An Agent-based Approach for Integrated Process Planning and Scheduling”. Expert Systems with Applications 37: 1256–1264.
  • Mak, K. L., and R. Y. K. Fung. 2006. “Integrated Process Planning and Scheduling/Rescheduling – An Agent Based Approach”. International Journal of Production Research 44: 3627–3655.
  • Manupati, V. K., J. J. Thakkar, K. Y. Wong, and M. K. Tiwari. 2013. “Near Optimal Process Plan Selection for Multiple Jobs in Networked Based Manufacturing using Multi-objective Evolutionary Algorithms”. Computers and Industrial Engineering 66: 63–76.
  • Neto, A. R. M., and E. V. G. Filho. 2010. “A Simulation-based Evolutionary Multi-objective Approach to Manufacturing Cell Formation”. Computers and Industrial Engineering 59: 64–74.
  • Saygin, C., and S. E. Kilic. 1999. “Integrated Flexible Process Plans with Scheduling in Flexible Manufacturing Systems”. International Journal of Advanced Manufacturing Technology 15: 268–280.
  • Shao, X. Y., X. Y. Li, L. Gao, and C. Y. Zhang. 2009. “Integration of Process Planning and Scheduling – A Modified Genetic Algorithm Based Approach”. Computers and Operations Research 36: 2082–2096.
  • Shrestha, R., T. Takemoto, K. Ichinose, and N. Sugimura. 2008. “A Study on Integration of Process Planning and Scheduling System for Holonic Manufacturing with Modification of Process Plans.” International Journal of Manufacturing Technology and Management 14 (3–4): 359–378.
  • Sormaz, D., and B. Khoshnevis. 2003. “Generation of Alternative Process Plans in Integrated Manufacturing Systems”. Journal of Intelligent Manufacturing 14: 509–526.
  • Srinivas, N., and K. Deb. 1995. “Multi-objective Optimization using Nondominated Sorting in Genetic Algorithms”. Evolutionary Computation 2: 221–248.
  • Sugimura, N., R. Hino, and T. Moriwaki. 2001. “Integrated Process Planning and Scheduling in Holonic Manufacturing Systems.” Proceedings of the IEEE International Symposium on Assembly and Task Planning, 2001, 250–255. IEEE. doi:10.1109/ISATP.2003.1217184.
  • Sugimura, N., R. Shrestha, and J. Inoue. 2003. “Integrated Process Planning and Scheduling in Holonic Manufacturing Systems – Optimization Based on Shop Time and Machining Cost.” Proceedings of the IEEE International Symposium on Assembly and Task Planning, 2003, July, 36–41. IEEE. doi:10.1109/ISATP.2003.1217184.
  • Sundaram, R. M., and S. S. Fu. 1988. “Process Planning and Scheduling – A Method of Integration for Productivity Improvement.” Computers & Industrial Engineering 15 (1): 296–301.
  • Usher, J. M. 2003. Evaluating the Impact of Alternative Plans on Manufacturing Performance. Computers & Industrial Engineering 45 (4): 585–596.
  • Usher, J. M., and K. J. Fernandes. 1996. “Dynamic Process Planning – The Static Phase.” Journal of Materials Processing and Technology 61: 53–58.
  • Wang, L., W. Shen, and Q. Hao. 2006. “An Overview of Distributed Process Planning and its Integration with Scheduling.” International Journal of Computer Applications in Technology 26 (1–2): 3–14.
  • Wong, T. N., and C. W. Leung. 2006. “Dynamic Shop Floor Scheduling in Multi-agent Manufacturing System”. Expert Systems with Applications 31: 486–494.
  • Yan, J. Q. 2000. “Digitized Network-based Manufacturing”. Industrial Engineering and Management 1: 8–11.
  • Zhang, H. C., and M. E. Merchant. 1993. IPPM – A Prototype to Integrate Process Planning and Job Shop Scheduling Functions. CIRP Annals-Manufacturing Technology 42 (1): 513–518.
  • Zhang, F., Y. Zhang, and A. Nee. 1997. “Using Genetic Algorithms in Process Planning for Job Shop Machining”. IEEE Transactions on Evolutionary Computation 1: 278–289.
  • Zhang, Y., A. Saravanan, and J. Fuh. 2003. “Integration of Process Planning and Scheduling by Exploring the Flexibility of Process Planning”. International Journal of Production Research 41: 611–628.
  • Zhou, G. H., Z. Xiao, P. Y. Jiang, and G. Q. Huang. 2010. “A Game-theoretic Approach to Generating Optimal Process Plans of Multiple Jobs in Networked Manufacturing”. International Journal of Computer Integrated Manufacturing 23: 1118–1132.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.