284
Views
11
CrossRef citations to date
0
Altmetric
Original Articles

A single-machine scheduling problem with learning effect, deterioration and non-monotonic time-dependent processing times

, , &
Pages 292-304 | Received 20 Nov 2014, Accepted 17 Jan 2016, Published online: 16 Feb 2016

References

  • Ahmadizar, F., and M. H. Farahani. 2012. “A Novel Hybrid Genetic Algorithm for the Open Shop Scheduling Problem.” The International Journal of Advanced Manufacturing Technology 62 (5–8): 775–787. doi:10.1007/s00170-011-3825-1.
  • Alidaee, B., and N. K. Womer. 1999. “Scheduling with Time Dependent Processing Times: Review and Extensions.” Journal of the Operational Research Society 50 (7): 711–720. doi:10.1057/palgrave.jors.2600740.
  • Back, T., D. Fogel, and Z. Michalawecz. 1997. Handbook of Evolutionary Computation. Oxford: Oxford University Press.
  • Badiru, A. B. 1992. “Computational Survey of Univariate and Multivariate Learning Curve Models.” IEEE Transactions on Engineering Management 39 (2): 176–188. doi:10.1109/17.141275.
  • Bai, J., M.-Z. Wang, and J.-B. Wang. 2012. “Single Machine Scheduling with a General Exponential Learning Effect.” Applied Mathematical Modelling 36 (2): 829–835. doi:10.1016/j.apm.2011.07.002.
  • Baker, K. R., and G. D. Scudder. 1990. “Sequencing with Earliness and Tardiness Penalties: A Review.” Operations Research 38 (1): 22–36. doi:10.1287/opre.38.1.22.
  • Behnamian, J., S. M. T. Fatemi Ghomi, and M. Zandieh. 2009. “A Multi-Phase Covering Pareto-Optimal Front Method to Multi-Objective Scheduling in A Realistic Hybrid flowshop Using A Hybrid Metaheuristic.” Expert Systems with Applications 36 (8): 11057–11069. doi:10.1016/j.eswa.2009.02.080.
  • Biskup, D. 1999. “Single-Machine Scheduling with Learning Considerations.” European Journal of Operational Research 115 (1): 173–178. doi:10.1016/S0377-2217(98)00246-X.
  • Biskup, D. 2008. “A State-Of-The-Art Review on Scheduling with Learning Effects.” European Journal of Operational Research 188 (2): 315–329. doi:10.1016/j.ejor.2007.05.040.
  • Browne, S., and U. Yechiali. 1990. “Scheduling Deteriorating Jobs on a Single Processor.” Operations Research 38 (3): 495–498. doi:10.1287/opre.38.3.495.
  • Chen, B., and T. I. Matis. 2013. “A Flexible Dispatching Rule for Minimizing Tardiness in Job Shop Scheduling.” International Journal of Production Economics 141 (1): 360–365. doi:10.1016/j.ijpe.2012.08.019.
  • Cheng, T. C. E., Q. Ding, and B. M. Lin. 2004. “A Concise Survey of Scheduling with Time-Dependent Processing Times.” European Journal of Operational Research 152 (1): 1–13. doi:10.1016/s0377-2217(02)00909-8.
  • Cheng, T. C. E., W.-H. Kuo, and D.-L. Yang. 2013. “Scheduling with a Position-Weighted Learning Effect Based on Sum-Of-Logarithm-Processing-Times and Job Position.” Information Sciences 221: 490–500. doi:10.1016/j.ins.2012.09.001.
  • Cheng, T. C. E., and G. Wang. 2000. “Single Machine Scheduling with Learning Effect Considerations.” Annals of Operations Research 98 (1/4): 273–290. doi:10.1023/a:1019216726076.
  • Eren, T., and E. Güner. 2007. “Minimizing Total Tardiness in a Scheduling Problem with a Learning Effect.” Applied Mathematical Modelling 31 (7): 1351–1361. doi:10.1016/j.apm.2006.03.030.
  • Essafi, I., Y. Mati, and S. D. Pérès. 2008. “A Genetic Local Search Algorithm for Minimizing Total Weighted Tardiness in the Job-Shop Scheduling Problem.” Computers & Operations Research 35 (8): 2599–2616. doi:10.1016/j.cor.2006.12.019.
  • Farahani, M. H., and L. Hosseini. 2013. “Minimizing Cycle Time in Single Machine Scheduling with Start Time-Dependent Processing Times.” The International Journal of Advanced Manufacturing Technology 64 (9–12): 1479–1486. doi:10.1007/s00170-012-4116-1.
  • Gen, M., and R. Cheng. 2000. Genetic Algorithms and Engineering Optimization. New York: John Wiley & Sons.
  • Ghodratnama, A., M. Rabbani, R. Tavakkoli-Moghaddam, and A. Baboli. 2010. “Solving a Single-Machine Scheduling Problem with Maintenance, Job Deterioration and Learning Effect by Simulated Annealing.” Journal of Manufacturing Systems 29 (1): 1–9. doi:10.1016/j.jmsy.2010.06.004.
  • Guo, Q., and L. Tang. 2015. “An Improved Scatter Search Algorithm for the Single Machine Total Weighted Tardiness Scheduling Problem with Sequence-Dependent Setup Times.” Applied Soft Computing 29: 184–195. doi:10.1016/j.asoc.2014.12.030.
  • Gupta, J. N. D., and S. K. Gupta. 1988. “Single Facility Scheduling with Nonlinear Processing Times.” Computers & Industrial Engineering 14 (4): 387–393. doi:10.1016/0360-8352(88)90041-1.
  • Heizer, J., and B. Render. 2001. Operations Management. Upper Saddle River, NJ: Prentice-Hall.
  • Hosseini, N., and R. Tavakkoli-Moghaddam. 2013. “Two Meta-Heuristics for Solving a New Two Machine Flowshop Scheduling Problem with the Learning Effect and Dynamic Arrivals.” The International Journal of Advanced Manufacturing Technology 65 (5–8): 771–786. doi:10.1007/s00170-012-4216-y.
  • Koulamas, C. 1994. “The Total Tardiness Problem: Review and Extensions.” Operations Research 42 (6): 1025–1041. doi:10.1287/opre.42.6.1025.
  • Koulamas, C. 2010. “The Single-Machine Total Tardiness Scheduling Problem: Review and Extensions.” European Journal of Operational Research 202 (1): 1–7. doi:10.1016/j.ejor.2009.04.007.
  • Koulamas, C., and G. J. Kyparisis. 2007. “Single-Machine and Two-Machine flowshop Scheduling with General Learning Functions.” European Journal of Operational Research 178 (2): 402–407. doi:10.1016/j.ejor.2006.01.030.
  • Lee, W.-C. 2014. “Single-Machine Scheduling with Past-Sequence-Dependent Setup Times and General Effects of Deterioration and Learning.” Optimization Letters 8 (1): 135–144. doi:10.1007/s11590-012-0481-9.
  • Lee, W.-C., and Z.-S. Lu. 2012. “Group Scheduling with Deteriorating Jobs to Minimize the Total Weighted Number of Late Jobs.” Applied Mathematics and Computation 218 (17): 8750–8757. doi:10.1016/j.amc.2012.02.033.
  • Lee, W.-C., C.-C. Wu, and P.-H. Hsu. 2010. “A Single-Machine Learning Effect Scheduling Problem with Release Times.” Omega 38 (1–2): 3–11. doi:10.1016/j.omega.2009.01.001.
  • Li, D.-C., and P.-H. Hsu. 2012. “Solving a Two-Agent Single-Machine Scheduling Problem considering Learning Effect.” Computers & Operations Research 39 (7): 1644–1651. doi:10.1016/j.cor.2011.09.018.
  • Li, S., C. T. Ng, and J. Yuan. 2011. “Scheduling Deteriorating Jobs with CON/SLK Due Date Assignment on a Single Machine.” International Journal of Production Economics 131 (2): 747–751. doi:10.1016/j.ijpe.2011.02.029.
  • Low, C., and W.-Y. Lin. 2013. “Some Scheduling Problems with Time-Dependent Learning Effect and Deteriorating Jobs.” Applied Mathematical Modelling 37 (20–21): 8865–8875. doi:10.1016/j.apm.2013.04.008.
  • Mahdavi, I., M. M. Paydar, M. Solimanpur, and A. Heidarzade. 2009. “Genetic Algorithm Approach for Solving a Cell Formation Problem in Cellular Manufacturing.” Expert Systems with Applications 36 (3): 6598–6604. doi:10.1016/j.eswa.2008.07.054.
  • Naama, B., H. Bouzeboudja, M. Lahdeb, and Y. Ramdani. 2013. “A Hybrid Tabu Search and Algorithm Genetic for Solving the Economic Dispatch Problem.” Leonardo Journal of Sciences 12 (22): 29–36.
  • Niu, Q., T. Zhou, and L. Wang. 2010. “A Hybrid Particle Swarm Optimization for Parallel Machine Total Tardiness Scheduling.” The International Journal of Advanced Manufacturing Technology 49 (5–8): 723–739. doi:10.1007/s00170-009-2426-8.
  • Ross, P. J. 1996. Taguchi Techniques for Quality Engineering. Columbus, OH: McGraw-Hill International Editions.
  • Roy, R. K. 2010. A Primer on the Taguchi Method. Dearborn, MI: Society of Manufacturing Engineers.
  • Rudek, R. 2011. “Computational Complexity and Solution Algorithms for flowshop Scheduling Problems with the Learning Effect.” Computers & Industrial Engineering 61 (1): 20–31. doi:10.1016/j.cie.2011.02.005.
  • Subramanian, A., M. Battarra, and C. N. Potts. 2014. “An Iterated Local Search Heuristic for the Single Machine Total Weighted Tardiness Scheduling Problem with Sequence-Dependent Setup Times.” International Journal of Production Research 52 (9): 2729–2742. doi:10.1080/00207543.2014.883472.
  • Sun, L.-H., L.-Y. Sun, M.-Z. Wang, and J.-B. Wang. 2012. “Flow Shop Makespan Minimization Scheduling with Deteriorating Jobs under Dominating Machines.” International Journal of Production Economics 138 (1): 195–200. doi:10.1016/j.ijpe.2012.03.023.
  • Tanaka, S., and M. Araki. 2013. “An Exact Algorithm for the Single-Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times.” Computers & Operations Research 40 (1): 344–352. doi:10.1016/j.cor.2012.07.004.
  • Wang, J.-B. 2009. “Single-Machine Scheduling with Learning Effect and Deteriorating Jobs.” Computers & Industrial Engineering 57 (4): 1452–1456. doi:10.1016/j.cie.2009.07.015.
  • Wang, J.-B., X. Huang, X.-Y. Wang, N. Yin, and L.-Y. Wang. 2009. “Learning Effect and Deteriorating Jobs in the Single Machine Scheduling Problems.” Applied Mathematical Modelling 33 (10): 3848–3853. doi:10.1016/j.apm.2009.01.004.
  • Wang, J.-B., D. Wang, and G.-D. Zhang. 2010. “Single-Machine Scheduling with Learning Functions.” Applied Mathematics and Computation 216 (4): 1280–1286. doi:10.1016/j.amc.2010.02.020.
  • Wang, J.-B., J.-J. Wang, and P. Ji. 2011. “Scheduling Jobs with Chain Precedence Constraints and Deteriorating Jobs.” Journal of the Operational Research Society 62 (9): 1765–1770. doi:10.1057/jors.2010.120.
  • Wang, J.-B., M.-Z. Wang, and P. Ji. 2012. “Single Machine Total Completion Time Minimization Scheduling with a Time-Dependent Learning Effect and Deteriorating Jobs.” International Journal of Systems Science 43 (5): 861–868. doi:10.1080/00207721.2010.542837.
  • Wang, X., and T. C. E. Cheng. 2007. “Single-Machine Scheduling with Deteriorating Jobs and Learning Effects to Minimize the Makespan.” European Journal of Operational Research 178 (1): 57–70. doi:10.1016/j.ejor.2006.01.017.
  • Wang, X., and J.-J. Wang. 2013. “Scheduling Problems with Past-Sequence-Dependent Setup Times and General Effects of Deterioration and Learning.” Applied Mathematical Modelling 37 (7): 4905–4914. doi:10.1016/j.apm.2012.09.044.
  • Wright, T. P. 1936. “Factors Affecting the Cost of Airplanes.” Journal of the Aeronautical Sciences 3: 122–128. doi:10.2514/8.155.
  • Wu, C.-C., Y. Yin, and S.-R. Cheng. 2011. “Some Single-Machine Scheduling Problems with a Truncation Learning Effect.” Computers & Industrial Engineering 60 (4): 790–795. doi:10.1016/j.cie.2011.01.016.
  • Wu, W.-H. 2014. “Solving a Two-Agent Single-Machine Learning Scheduling Problem.” International Journal of Computer Integrated Manufacturing 27 (1): 20–35. doi:10.1080/0951192X.2013.800229.
  • Wu, W.-H., J. Xu, W.-H. Wu, Y. Yin, I.-F. Cheng, and C.-C. Wu. 2013. “A Tabu Method for A Two-Agent Single-Machine Scheduling with Deterioration Jobs.” Computers & Operations Research 40 (8): 2116–2127. doi:10.1016/j.cor.2013.02.025.
  • Xhafa, F., J. A. Gonzalez, K. P. Dahal, and A. Abraham. 2009. “A GA (TS) Hybrid Algorithm for Scheduling in Computational Grids.” In Hybrid Artificial Intelligence Systems, edited by E. Corchado, X. Wu, E. Oja, A. Herrero, and B. Baruque, 285–292. Berlin, Heidelberg: Springer.
  • Yang, H.-A., Q.-F. Sun, C. Saygin, and S.-D. Sun. 2012. “Job Shop Scheduling Based on Earliness and Tardiness Penalties with Due Dates and Deadlines: An Enhanced Genetic Algorithm.” The International Journal of Advanced Manufacturing Technology 61 (5–8): 657–666. doi:10.1007/s00170-011-3746-z.
  • Yang, K., E. C. Teo, and F. K. Fuss. 2007. “Application of Taguchi Method in Optimization of Cervical Ring Cage.” Journal of Biomechanics 40 (14): 3251–3256. doi:10.1016/j.jbiomech.2006.12.016.
  • Yin, Y., S. R. Cheng, J. Y. Chiang, J. C. Chen, X. Mao, and C. C. Wu. 2015a. “Scheduling Problems with Due Date Assignment.” Discrete Dynamics in Nature and Society 501: 683269.
  • Yin, Y., T. C. E. Cheng, L. Wan, C.-C. Wu, and J. Liu. 2015b. “Two-Agent Single-Machine Scheduling with Deteriorating Jobs.” Computers & Industrial Engineering 81: 177–185. doi:10.1016/j.cie.2015.01.002.
  • Yin, Y., T. C. E. Cheng, and C. C. Wu. 2014. “Scheduling with Time-Dependent Processing Times.” Mathematical Problems in Engineering 2014: 1–2. doi:10.1155/2014/201421.
  • Yin, Y., W.-H. Wu, T. C. E. Cheng, and C.-C. Wu. 2015c. “Single-Machine Scheduling with Time-Dependent and Position-Dependent Deteriorating Jobs.” International Journal of Computer Integrated Manufacturing 28 (7): 781–790. doi:10.1080/0951192X.2014.900872.
  • Yin, Y., D. Xu, S.-R. Cheng, and C.-C. Wu. 2012. “A Generalisation Model of Learning and Deteriorating Effects on A Single-Machine Scheduling with Past-Sequence-Dependent Setup Times.” International Journal of Computer Integrated Manufacturing 25 (9): 804–813. doi:10.1080/0951192X.2012.665189.
  • Yu, S., C. Ding, and K. Zhu. 2011. “A Hybrid GA–TS Algorithm for Open Vehicle Routing Optimization of Coal Mines Material.” Expert Systems with Applications 38 (8): 10568–10573. doi:10.1016/j.eswa.2011.02.108.
  • Zhang, Y., X. Wu, and X. Zhou. 2013. “Stochastic Scheduling Problems with General Position-Based Learning Effects and Stochastic Breakdowns.” Journal of Scheduling 16 (3): 331–336. doi:10.1007/s10951-012-0306-9.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.