2,394
Views
7
CrossRef citations to date
0
Altmetric
Original Articles

Implementation of lean manufacturing and lean audit system in an auto parts manufacturing industry – an industrial case study

, , & ORCID Icon
Pages 579-594 | Received 30 Jul 2016, Accepted 19 Jun 2017, Published online: 28 Jul 2017

References

  • Achanga, P., E. Shehab, R. Roy, and G. Nelder. 2006. “Critical Success Factors for Lean Implementation within SMEs.” Journal of Manufacturing Technology Management 17 (4): 460–471. doi:10.1108/17410380610662889.
  • Amarjeet Gupth, R., N. Sanjay Aloni, and H. Ramkumar Binzade. 2016. “A Review of on Issues Related to Manual Core Making Process in Foundry Industry.” International Journal of Scientific Research and Development 3 (2): 467–478.
  • Ansuini, J. S. 1995. Improvement Engine. Productivity Press: Portland.
  • Askin, R. G., and J. B. Goldberg. 2005. Design and Analysis of Lean Production Systems. John Wiley: Singapore.
  • Barker, R. C. 1994. “The Design of Lean Manufacturing Systems Using Time-Based Analysis.” International Journal of Operations and Production Management 14 (11): 86–96. doi:10.1108/01443579410068666.
  • Bhadury, B. 2000. “Management of Productivity through TPM.” Productivity 41 (2): 240–251.
  • Braglia, M., G. Carmignani, and F. Zammori. 2006. “A New Value Stream Mapping Approach for Complex Production Systems.”  International Journal of Production Research 44 (18–19): 3929–3952.
  • Chen, J. C., J. Dugger, and B. Hammer. 2000. “A Kaizen Based Approach for Cellular Manufacturing Design: A Case Study.” The Journal of Technology Studies 27 (2): 19–27.
  • Dankbaar, B. 1997. “Lean Production: Denial, Confirmation or Extension of Socio Technical Systems Design.” Human Relations 50 (5): 567–584.
  • Eswaramoorthi, M., G. R. Kathiresan, P. S. S. Prasad, and P. V. Mohanram. 2011. “A Survey on Lean Practices in Indian Industries.” International Journal of Advanced Manufacturing Technology 52: 1091–1101. doi:10.1007/s00170-010-2788-y.
  • Goriwondo, W. M., A. Marecha, and S. Mhkanga. 2011. ““Use of the Value Stream Mapping Tool for Waste Reduction in Manufacturing, Case Study for Bread Manufacturing in Zimbabwe.” In Proceedings of International Conference on Industrial Engineering and Operations Management, 236–241. Kuala Lumpur, Malaysia: IEOM Research Solutions Pty Ltd. ISBN: 978-0-9808251-0-7.
  • Gunasekaran, A. 1997. “A Implementation of Computer- Integrated Manufacturing: A Survey of Integration and Adaptability Issues.” International Journal of Computer Integrated Manufacturing 10 (4): 266–280. doi:10.1080/095119297131363.
  • Hines, P., and D. H. Taylor. 2000. Going Lean: A Guide to Implementation. UK: Lean Enterprise Research Centre, Cardiff Business School, Cardiff University.
  • Ho, S. K. M. 1999b. “The 5-S Auditing.” Managerial Auditing Journal 14 (6): 294–301. doi:10.1108/02686909910280244.
  • Huang, G. Q. et. al. 2009. “Wireless Manufacturing: A Literature Review, Recent Developments and Case Studies.” International Journal of Computer Integrated Manufacturing, 22(7) 579–594.
  • Jadhav, J. R., S. S. Mantha, and B. Santhose Rane. 2014b. “Development of Frame Work for Sustainable Lean Implementation as ISM Approach.” Journal of Industrial Engineering International 10: 72. doi:10.1007/s40092-014-0072-8.
  • Jadhav, J. R., S. S. Mantha, and S. B. Rane. 2014a. ““Road Map for Lean Implementation in Indian Automotive Component Manufacturing Industry”, Comparative Study of UNIDO Model and ISM Model.” Journal of Industrial Engineering International 11 (2): 179–198. doi:10.1007/s40092-014-0074-6.
  • Jessop, D., and O. Jones. 1995. “Value Stream Process Modeling: A Methodology for Creating Competitive Advantage.” In Proceedings of the 4th Annual IPSERA Conference, International Purchasing and Supply Education and Research Association, Netherlands, 46–64. University of Birmingham.
  • LAI Enterprise Self-Assessment Tool (LESAT). 2012. V.2. Facilitator’s Guide. https://dspace.mit.edu/handle/1721.1/84694.
  • JIPM. 2002. Kobetsu Kaizen Manual. Mumbai: TPM Club, CII.
  • Masaaki, I. 1986. Kaizen: The Key to Japan’s Competitive Success. Irwin: McGraw-Hill.
  • Mondeno, Y. 2011. Toyota Production System: “An Integrated Approach to Just-in-Time”. USA: CRC Press.
  • Nihon, H. R., and Kyokai. 1992. Guiding Continuous Improvement through Employee Suggestions. Vol. 2. Portland: Productivity Press.
  • Ohno, T. 1990. Toyota Production System: Beyond Large- Scale Production. Portland, OR: Productivity Press.
  • Panizzolo, R. 1998. ““Applying the Lessons Learned from 27 Lean Manufacturers”, the Relevance of Relationships Management.” International Journal of Production Economics 55 (3): 223–240. doi:10.1016/S0925-5273(98)00066-8.
  • Pavnaskar, S. J., J. K. Gershenson, and A. B. Jambekar. 2003. “Classification Scheme for Lean Manufacturing Tools.” International Journal of Production Research 41 (13): 3075–3090. doi:10.1080/0020754021000049817.
  • Radharamanan, R., L. P. Godoy, and K. I. Watanabe. 1996. “Quality and Productivity Improvement in a Custom-Made Furniture Industry Using Kaizen.” Computer and Industrial Engineering 31 (1/2): 471–474. doi:10.1016/0360-8352(96)00177-5.
  • Rajesh, R., and J. G. Khan. 2014. “Defects, Causes and Their Remedies in Casting Process.” A Review, International Journal of Research in Advent Technology 2 (3): 817–827.
  • Rinehart, J. W., C. V. Huxlay, and D. Robertson. 1997. Just Another Car Factory? Lean Production and Its Discontents. New York: Cornell University Press.
  • Rother, M., and J. Shook. 1999. Learning to See, Version 1.2. Brookline, MA: Lean Enterprise Institute.
  • Sahoo, A. K., N. K. Singh, Ravichandran, and M. K. Tiwari. 2008. “Lean Philosophy: Implementation in a Forging Company.” International Journal of Advanced Manufacturing Technology 36 (5–6): 451–462. doi:10.1007/s00170-006-0870-2.
  • Shah, R., and P. T. Ward. 2003. “Lean Manufacturing: Context, Practice Bundles, and Performance.” Journal of Operation Management 21 (2): 129–149. doi:10.1016/S0272-6963(02)00108-0.
  • Soriano-Meier., H., and P. L. Forrester. 2002. “A Model for Evaluating the Degree of Leanness of Manufacturing Firms.” Integrated Manufacturing Systems 13 (2): 104–109. doi:10.1108/09576060210415437.
  • Suzuki, T. 1994. TPM in Process Industries. Portland: Productivity Press.
  • Venkataraman, K., B. Vijaya Ramnath, V. Muthukumar, and C. Elanchezian. 2014. “Application of Value Stream Mapping for Reduction Cycle Time in a Machining Process.” Procedia Material Science 6: 1187–1196. doi:10.1016/j.mspro.2014.07.192.
  • Wickens, P. D. 1990. “Production Management: “Japanese and British Approaches”.” IEE Proceedings A (Physical Science, Measurement and Instrumentation, Management and Education 137 (1): 52–54. doi:10.1049/ip-a-2.1990.0007.
  • Womack, J. P., and D. T. Jones. 2010. Lean Thinking. New York: Banish Waste and Create Wealth in Your Corporation, Simon and Schuster.
  • Womack, J. P., D. T. Jones, and D. Roos. 1990. The Machine that Changed the World. New York: Harper Perennial.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.