164
Views
26
CrossRef citations to date
0
Altmetric
Original Articles

Time minimization in flexible robotic cells considering intermediate input buffers: a comparative study of three well-known problems

, &
Pages 809-819 | Received 12 Nov 2018, Accepted 06 Jun 2019, Published online: 04 Jul 2019

References

  • Crama, Y., and J. Van De Klundert. 1997. “Cyclic Scheduling of Identical Parts in a Robotic Cell.” Operations Research 45 (6): 952–965. doi:10.1287/opre.45.6.952.
  • Dang, Q. V., I. Nielsen, K. Steger-Jensen, and O. Madsen. 2014. “Scheduling a Single Mobile Robot for Part-feeding Tasks of Production Lines.” Journal of Intelligent Manufacturing 25 (6): 1271–1287. doi:10.1007/s10845-013-0729-y.
  • Daoud, S., H. Chehade, F. Yalaoui, and L. Amodeo. 2014. “Efficient Metaheuristics for Pick and Place Robotic Systems Optimization.” Journal of Intelligent Manufacturing 25 (1): 27–41. doi:10.1007/s10845-012-0668-z.
  • Dawande, M., H. N. Geismar, S. P. Sethi, and C. Sriskandarajah. 2005. “Sequencing and Scheduling in Robotic Cells: Recent Developments.” Journal of Scheduling 8 (5): 387–426. doi:10.1007/s10951-005-2861-9.
  • Drobouchevitch, I. G., H. N. Geismar, and C. Sriskandarajah. 2010. “Throughput Optimization in Robotic Cells with Input and Output Machine Buffers: A Comparative Study of Two Key Models.” European Journal of Operational Research 206 (3): 623–633. doi:10.1016/j.ejor.2010.03.002.
  • Drobouchevitch, I. G., S. P. Sethi, and C. Sriskandarajah. 2006. “Scheduling Dual Gripper Robotic Cell: One-unit Cycles.” European Journal of Operational Research 171 (2): 598–631. doi:10.1016/j.ejor.2004.09.019.
  • Foumani, M., I. Gunawan, and K. Smith-Miles. 2017. “Increasing Throughput for a Class of Two-Machine Robotic Cells Served by a Multifunction Robot.” IEEE Transactions on Automation Science and Engineering 14 (2): 1150–1159. doi:10.1109/TASE.2015.2504478.
  • Foumani, M., I. Gunawan, K. Smith-Miles, and M. Y. Ibrahim. 2015. “Notes on Feasibility and Optimality Conditions of Small-scale Multifunction Robotic Cell Scheduling Problems with Pickup Restrictions.” IEEE Transactions on Industrial Informatics 11 (3): 821–829. doi:10.1109/TII.2014.2371334.
  • Foumani, M., and K. Jenab. 2012. “Cycle Time Analysis in Reentrant Robotic Cells with Swap Ability.” International Journal of Production Research 50 (22): 6372–6387. doi:10.1080/00207543.2011.642823.
  • Foumani, M., and K. Jenab. 2013. “Analysis of Flexible Robotic Cells with Improved Pure Cycle.” International Journal of Computer Integrated Manufacturing 26 (3): 201–215. doi:10.1080/0951192X.2012.684722.
  • Ghadiri Nejad, M., H. Güden, B. Vizvári, and R. Vatankhah Barenji. 2018. “A Mathematical Model and Simulated Annealing Algorithm for Solving the Cyclic Scheduling Problem of A Flexible Robotic Cell.” Advances in Mechanical Engineering 10 (1): 1–12. doi:10.1177/1687814017753912.
  • Ghadirinejad, M., and S. Mosallaeipour. 2013. “A New Approach to Optimize A Flexible Manufacturing Cell”. 1st international conference on new directions in business, management, finance and economics, Famagusta, Cyprus.
  • Gultekin, H., Ö. O. Dalgıç, and M. S. Akturk. 2017. “Pure Cycles in Two-machine Dual-gripper Robotic Cells.” Robotics and Computer-Integrated Manufacturing 48: 121–131. doi:10.1016/j.rcim.2017.03.004.
  • Gultekin, H., O. E. Karasan, and M. S. Akturk. 2009. “Pure Cycles in Flexible Robotic Cells.” Computers and Operations Research 36 (2): 329–343. doi:10.1016/j.cor.2007.10.007.
  • Jolai, F., M. Foumani, R. Tavakoli-Moghadam, and P. Fattahi. 2012. “Cyclic Scheduling of a Robotic Flexible Cell with Load Lock and Swap.” Journal of Intelligent Manufacturing 23 (5): 1885–1891. doi:10.1007/s10845-011-0505-9.
  • Kamoun, H., N. G. Hall, and C. Sriskandarajah. 1999. “Scheduling in Robotic Cells: Heuristics and Cell Design.” Operations Research 47 (6): 821–835. doi:10.1287/opre.47.6.821.
  • Kim, H., H. J. Kim, J. H. Lee, and T. E. Lee. 2013. “Scheduling Dual-armed Cluster Tools with Cleaning Processes.” International Journal of Production Research 51 (12): 3671–3687. doi:10.1080/00207543.2012.758392.
  • Leung, J. M., G. Zhang, X. Yang, R. Mak, and K. Lam. 2004. “Optimal Cyclic Multi-hoist Scheduling: A Mixed Integer Programming Approach.” Operations Research 52 (6): 965–976. doi:10.1287/opre.1040.0144.
  • Mosallaeipour, S., M. G. Nejad, S. M. Shavarani, and R. Nazerian. 2018. “Mobile Robot Scheduling for Cycle Time Optimization in Flow-shop Cells, a Case Study.” Production Engineering 12 (1): 83–94. doi:10.1007/s11740-017-0784-x.
  • Musharavati, F., and A. M. S. Hamouda. 2015. “Multiple Parts Process Planning in Serial-parallel Flexible Flow Lines: Part I—Process Plan Modeling Framework.” The International Journal of Advanced Manufacturing Technology 78 (1–4): 115–137. doi:10.1007/s00170-014-6616-7.
  • Nejad, M. G., G. Kovács, B. Vizvári, and R. V. Barenji. 2018a. “An Optimization Model for Cyclic Scheduling Problem in Flexible Robotic Cells.” The International Journal of Advanced Manufacturing Technology 95 (9–12): 3863–3873. doi:10.1007/s00170-017-1470-z.
  • Nejad, M. G., S. M. Shavarani, B. Vizvári, and R. V. Barenji. 2018b. “Trade-off between Process Scheduling and Production Cost in Cyclic Flexible Robotic Cells.” The International Journal of Advanced Manufacturing Technology 96 (1–4): 1081–1091. doi:10.1007/s00170-018-1577-x.
  • Papakostas, N., G. Michalos, S. Makris, D. Zouzias, and G. Chryssolouris. 2011. “Industrial Applications with Cooperating Robots for the Flexible Assembly.” International Journal of Computer Integrated Manufacturing 24 (7): 650–660. doi:10.1080/0951192X.2011.570790.
  • Pinedo, M. L. 2016. Scheduling: Theory, Algorithms, and Systems. New York, USA: Springer.
  • Rajapakshe, T., M. Dawande, and C. Sriskandarajah. 2011. “Quantifying the Impact of Layout on Productivity: An Analysis from Robotic-cell Manufacturing.” Operations Research 59 (2): 440–454. doi:10.1287/opre.1100.0874.
  • Vizvari, B., H. Güden, and M. Ghadiri Nejad. 2018. “Local Search Based Meta-heuristic Algorithms for Optimizing the Cyclic Flexible Manufacturing Cell Problem.” Annals of Optimization Theory and Practice 1 (3): 15–32.
  • Yildiz, S., O. E. Karasan, and M. S. Akturk. 2012. “An Analysis of Cyclic Scheduling Problems in Robot Centered Cells.” Computers and Operations Research 39 (6): 1290–1299. doi:10.1016/j.cor.2010.09.005.
  • Zeballos, L. J. 2010. “A Constraint Programming Approach to Tool Allocation and Production Scheduling in Flexible Manufacturing Systems.” Robotics and Computer-Integrated Manufacturing 26 (6): 725–743. doi:10.1016/j.rcim.2010.04.005.
  • Zhou, B. H., and M. Li. 2017. “Scheduling Method of Robotic Cells with Robot-collaborated Process and Residency Constraints.” International Journal of Computer Integrated Manufacturing 30 (11): 1164–1178. doi:10.1080/0951192X.2017.1305504.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.