ReferencesReferences
- Aijun, L., Y. Yu, L. Fei, X. Qingsong, L. Hui, and Z. Yudong. 2013. “Chaotic Simulated Annealing Particle Swarm Optimization Algorithm Research and Its Application.” Journal of Zhejiang University Engineering Science 47 (10): 1722–1730. doi:10.3785/j..1008-973X.2013.10.004.
- Bouzary, H., and F. F. Chen. 2018. “Service Optimal Selection and Composition in Cloud Manufacturing: A Comprehensive Survey.” International Journal of Advanced Manufacturing Technology 97 (1–4): 795–808. doi:10.1007/s00170-018-1910-4.
- Cao, Y., S. Wang, L. Kang, C. Li, and L. Guo. 2015. “Study on Machining Service Modes and Resource Selection Strategies in Cloud Manufacturing.” International Journal of Advanced Manufacturing Technology 81 (1–4): 597–613. doi:10.1007/s00170-015-7222-z.
- Cao, Y., S. Wang, L. Kang, and Y. Gao. 2016. “A Tqcs-Based Service Selection and Scheduling Strategy in Cloud Manufacturing.” International Journal of Advanced Manufacturing Technology 82 (1–4): 235–251. doi:10.1007/s00170-015-7350-5.
- Cheng, Z., D. Zhan, X. Zhao, and H. Wan. 2014. “Multitask Oriented Virtual Resource Integration and Optimal Scheduling in Cloud Manufacturing.” Journal of Applied Mathematics. 1–9. doi:10.1155/2014/369350.
- Guo, L., S. Wang, L. Kang, and Y. Cao. 2015. “Agent-based Manufacturing Service Discovery Method for Cloud Manufacturing.” International Journal of Advanced Manufacturing Technology 81 (9–12): 2167–2181. doi:10.1007/s00170-015-7221-0
- Guo, L. 2016. “A System Design Method for Cloud Manufacturing Application System.” International Journal of Advanced Manufacturing Technology 84 (1–4): 275–289. doi:10.1007/s00170-015-8092-0.
- Guo, L., and J. Qiu. 2018a. “Combination of Cloud Manufacturing and 3d Printing: Research Progress and Prospect.” International Journal of Advanced Manufacturing Technology 96 (5–8): 1929–1942. doi:10.1007/s00170-018-1717-3.
- Guo, L., and J. Qiu. 2018b. “Optimization Technology in Cloud Manufacturing.” International Journal of Advanced Manufacturing Technology 97 (1–4): 1181–1193. doi:10.1007/s00170-018-1991-0.
- Hamta, N., S. M. T. Fatemi Ghomi, F. Jolai, and M. Akbarpour Shirazi. 2013. “A Hybrid Pso Algorithm for a Multi-Objective Assembly Line Balancing Problem with Flexible Operation Times, Sequence-Dependent Setup Times and Learning Effect(Article).” International Journal of Production Economics 141 (1): 99–111. doi:10.1016/j.ijpe.2012.03.013.
- Helo, P., D. Phuong, and Y. Hao. 2019. “Cloud Manufacturing – Scheduling as a Service for Sheet Metal Manufacturing(Article).” Computers & Operations Research 110: 208–219. doi:10.1016/j.cor.2018.06.002.
- Hu, Y., X. Chang, Y. Wang, Z. Wang, C. Shi, and L. Wu. 2017. “Cloud Manufacturing Resources Fuzzy Classification Based on Genetic Simulated Annealing Algorithm.” Materials and Manufacturing Processes 32 (10): 1109–1115. doi:10.1080/10426914.2016.1269921.
- Huang, X., B. Du, L. Sun, F. Chen, and W. Dai. 2016. “Service Requirement Conflict Resolution Based on Ant Colony Optimization in Group-Enterprises-Oriented Cloud Manufacturing.” International Journal of Advanced Manufacturing Technology 84 (1–4): 183–196. doi:10.1007/s00170-015-7961-x.
- Jin, H., X. Yao, Z. Yang, and S. Lyu. 2018. “Manufacturing Cloud Service Composition of Teaching-Learning Based Optimization.” Computer Integrated Manufacturing Systems, CIMS 24 (1): 43–52. doi:10.13196/j.cims.2018.01.004.
- Li, B.-H., L. Zhang, L. Ren, X.-D. Chai, F. Tao, Y.-Z. Wang, C. Yin, P. Huang, X.-P. Zhao, and Z.-D. Zhou. 2012. “Typical Characteristics, Technologies and Applications of Cloud Manufacturing.” Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS 18 (7): 1345–1356.
- Li, C., S. Wang, L. Kang, L. Guo, and Y. Cao. 2014. “Trust Evaluation Model of Cloud Manufacturing Service Platform.” International Journal of Advanced Manufacturing Technology 75 (1–4): 489–501. doi:10.1007/s00170-014-6112-0.
- Li, F., L. Zhang, Y. Liu, Y. Laili, and F. Tao. 2017. “A Clustering Network-Based Approach to Service Composition in Cloud Manufacturing.” International Journal of Computer Integrated Manufacturing 30: 12. doi:10.1080/0951192X.2017.1314015.
- Li, H., and K. Womer. 2012. “Optimizing the Supply Chain Configuration for Make-to-Order Manufacturing.” European Journal of Operational Research 221 (1): 118–128. doi:10.1016/j.ejor.2012.03.025.
- Li, Y., X. Yao, and M. Liu. 2019. “Cloud Manufacturing Service Composition Optimization with Improved Genetic Algorithm.” Mathematical Problems in Engineering 1–19. doi:10.1155/2019/7194258.
- Liu, B., and Z. Zhang. 2017. “Qos-aware Service Composition for Cloud Manufacturing Based on the Optimal Construction of Synergistic Elementary Service Groups.” International Journal of Advanced Manufacturing Technology 88 (9–12): 2757–2771. doi:10.1007/s00170-016-8992-7.
- Liu, Y., X. Xu, L. Zhang, L. Wang, and R. Zhong. 2017. “Workload-Based Multi-Task Scheduling in Cloud Manufacturing.” Robotics and Computer-integrated Manufacturing 45: 3–20. doi:10.1016/j.rcim.2016.09.008.
- Lu, J., T.-K. Li, and B.-L. Wang. 2012. “Hybrid Particle Swarm Optimization for Optimal Allocation of Production Capacity under Supply Chain Environment.” Computer Integrated Manufacturing Systems, CIMS 18 (11): 2537–2545.
- Shang, J., Y. Tian, Y. Liu, R. Liu, M. Sundhararajan, X.-Z. Gao, and H. Vahdat Nejad. 2018. “Production Scheduling Optimization Method Based on Hybrid Particle Swarm Optimization Algorithm.” Journal of Intelligent & Fuzzy Systems 34 (2): 955–964. doi:10.3233/jifs-169389.
- Slowik, A., and H. Kwasnicka. 2018. “Nature Inspired Methods and Their Industry Applications-Swarm Intelligence Algorithms.” IEEE Transactions on Industrial Informatics 14 (3): 1004–1015. doi:10.1109/TII.2017.2786782.
- Tao, F., C. Li, T. W. Liao, and Y. Laili. 2016. “Bgm-bla: A New Algorithm for Dynamic Migration of Virtual Machines in Cloud Computing.” IEEE Transactions on Services Computing 9 (6): 910–925. doi:10.1109/tsc.2015.2416928.
- Ting-Liang, W., W. Li, and X. Guo-Ping. 2012. “Combinatorial Optimization Method for Shipping Machinery Based on Hybrid Pso.” Xitong Gongcheng Lilun Yu Shijian (Systems Engineering Theory & Practice) 32 (10): 2262–2269.
- Wang, J.-F., G. Wang, -X.-X. Wen, and G.-A. Gao. 2009. “Construction of Collaborative Manufacturing Service Chain Based on Service Oriented Architecture.” Journal of the University of Electronic Science and Technology of China 38 (2): 282–287.
- Wang, S., L. Guo, L. Kang, C. Li, X. Li, and Y. Stephane. 2014. “Research on Selection Strategy of Machining Equipment in Cloud Manufacturing.” International Journal of Advanced Manufacturing Technology 71 (9–12): 1549–1563. doi:10.1007/s00170-013-5578-5.
- Wang, T., S. Guo, and C.-G. Lee. 2014. “Manufacturing Task Semantic Modeling and Description in Cloud Manufacturing System.” International Journal of Advanced Manufacturing Technology 71 (9–12): 2017–2031. doi:10.1007/s00170-014-5607-z.
- Wei, J., and Y. Wang. 2006. “A Novel Multi-Objective Pso Algorithm for Constrained Optimization Problems.” Simulated Evolution and Learning, Proceedings 4247: 174–180.
- Xiong, Y., J. Wang, M. Wu, and J. She. 2015. “Virtual Resource Scheduling Method of Cloud Manufacturing Oriented to Multi-Objective Optimization.” Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS 21 (11): 3079–3087. doi:10.13196/j.cims.2015.11.029.
- Xu, X. 2012. “From Cloud Computing to Cloud Manufacturing.” Robotics and Computer Integrated Manufacturing 28 (1): 75–86. doi:10.1016/j.rcim.2011.07.002.
- Yin, H.-K., C. Yin, X.-R. Gong, and M.-Y. Wang. 2013. “Cloud Manufacturing Services Platform General Framework and Key Technology for Automobile and Motorcycle Parts New Product Development.” Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS 19 (9): 2332–2339.
- Yuan, M., K. Deng, W. Chaovalitwongse, S. Cheng, and L. Guo. 2017. “Multi-objective Optimal Scheduling of Reconfigurable Assembly Line for Cloud Manufacturing.” Optimization Methods & Software 32 (3): 581–593. doi:10.1080/10556788.2016.1230210.
- Yuping Wang, D. L., and Y.-M. Cheung. 2005. “Preference Bi-Objective Evolutionary Algorithm for Constrained Optimization.” Lecture Notes in Computer Science 3801 (1): 184–191. doi:10.1007/11596448_27.
- Zhang, H., R. Guo, and C. Geng. 2014. “Hierarchical Optimization Model of Cloud Manufacturing Services Combination.” Intelligent Materials and Mechatronics 464: 345–351. doi:10.4028/www.scientific.net/AMM.464.345.
- Zhang, L., Y.-L. Luo, W.-H. Fan, F. Tao, and L. Ren. 2011. “Analyses of Cloud Manufacturing and Related Advanced Manufacturing Models.” Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS 17 (3): 458–468.
- Zhang, M., C. Li, Y. Shang, and C. Li. 2018. “Research on Resource Service Matching in Cloud Manufacturing(Article).” Manufacturing Letters 15: 50–54. doi:10.1016/j.mfglet.2018.02.001.
- Zhou, L., L. Zhang, C. Zhao, Y. Laili, and L. Xu. 2018. “Diverse Task Scheduling for Individualized Requirements in Cloud Manufacturing.” Enterprise Information Systems 12 (3): 3. doi:10.1080/17517575.2017.1364428.