References
- Baker, K. R. 1974. Introduction to sequencing and scheduling. New York, NY: John Wiley & Sons.
- Conway, R. W., W. L. Maxwell, and L. W. Miller. 1967. Theory of scheduling. Reading, MA: Addison-Wesley.
- Dombrowski, U. 1988. Qualitätssicherung im Terminwesen der Werkstattfertigung. Thesis (PhD). Universität Hannover. Published in Fortschritt-Berichte, Reihe 2, No. 159. Düsseldorf: VDI.
- Hendry, L. C., and B. G. Kingsman. 1993. “Customer enquiry management: part of a hierarchical system to control lead times in make-to-order companies.” The Journal of the Operational Research Society 44(1): 61–70.
- Lödding, H. 2008. Verfahren der fertigungssteuerung. 2nd ed. Heidelberg, Berlin: Springer.
- Lödding H Kuyumcu AAnalyzing and improving the schedule reliability of industrial companies In: Proceedings of the 44th CIRP international conference on manufacturing systems 1–3 June Madison 2011a WI, USA
- Lödding H Kuyumcu AThe effect of backlog and sequence deviation on schedule reliability In: Proceedings of the 21st international conference on production research 31 July–4 August Stuttgart 2011b
- Nyhuis, P., and H.-P. Wiendahl. 2009. Fundamentals of production logistics. Heidelberg, Berlin: Springer.
- Plossl, G. W., and O. W. Wight. 1973. “Capacity planning and control.” Production and Inventory Management Journal 14(3): 31–67.
- Wiendahl, H.-P., P. Nyhuis, and K. Helms. 1998. “Durchlaufzeit/2 – Die Potentiale liegen auf der Hand! Ergebnisse einer “Engpaßorientierten Logistikanalyse” in der Leiterplattenindustrie.” Werkstattstechnik 88(4): 159–164.
- Yu, K.-W. 2001. Terminkennlinie. Eine beschreibungsmethodik für die terminabweichung im produktionsbereich. Thesis (PhD). Universität Hannover. Published in Fortschritt-Berichte, Reihe 2, Nr. 576. Düsseldorf: VDI.