Publication Cover
Production Planning & Control
The Management of Operations
Volume 25, 2014 - Issue 1
715
Views
9
CrossRef citations to date
0
Altmetric
Articles

Advanced inventory planning and forecasting solutions: a case study of the UKTLCS Chinook maintenance programme

, , &
Pages 73-90 | Received 25 Mar 2010, Accepted 02 Jan 2012, Published online: 09 Feb 2012

References

  • Argyris, C., and D. Schon. 1991. “Participatory action research and action science compared: a commentary.” In Participatory Action Research, edited by W. Whyte. Pub: Sage.
  • Billah, B., et al. 2006. “Exponential smoothing model selection for forecasting.” International Journal of Forecasting 22(2): 239–247.
  • Boylan, J., A. Syntetos, and G. Karakostas. 2008. “Classification for forecasting and stock control:a case study.” Journal of the Operational Research Society 59: 473–481.
  • Carmo, J., A. António, and J. Rodrigues. 2004. “Adaptive forecasting of irregular demand processes.” Engineering Applications of Artificial Intelligence 17(2): 137–143.
  • Clark, A. 2005. “Rolling horizon heuristics for production planning and set-up scheduling with backlogs and error-prone demand forecasts.” Production Planning and Control 16(1): 81–97.
  • Croston, J. 1972. “Forecasting and Stock Control for Intermittent Demands.” Operations Research Society 23: 289–304.
  • Denicoff, M., J. Fennell, and H. Solomon. 1960. “Summary of a method for determining the military worth of spare parts.” Naval Research Logistics Quarterly 7(3): 221–234.
  • Downing, M., et al.. 2011. “Supply chain forecasting for the UK Chinook fleet.” OR Insight 24: 110–130.
  • Graman, G., and N. Sanders. 2009. “Modelling the tradeoff between postponement capacity and forecast accuracy.” Production Planning and Control 20(3): 206–215.
  • Ho, C., and T. Ireland. 1993. “A diagnostic analysis of the impact of forecast errors on production planning via MRP system nervousness.” Production Planning and Control 4(4): 311–322.
  • Huberty, C. and Morris, J., 1989. Multivariate Analysis Versus Multiple Univariate Analyses. Psychological Bulletin, 105 (2) (March), 302–308.
  • Johnsen, T., M. Howard, and J. Miemczyk. 2009. “UK defence change and the impact on supply relationships.” Supply Chain Management: An International Journal 14(4): 270–279.
  • Karr, H. 1958. “A method of estimating spare-part essentiality.” Naval Research Logistics Quarterly 5(1): 29–42.
  • Kennedy, W. J., J. W. Pattersonb, and L. D. Fredendall. 2002. “An overview of recent literature on spare parts inventories.” International Journal of Production Economics 76(20): 201–215.
  • Makridakis, S., Wheelwright, S.C. and Hyndman, R.J., 1998. Forecasting: Methods and Applications. John Wiley & Sons, Inc.
  • Markland, R. 1970. “A comparative study of demand forecasting techniques for military helicopter spare parts.” Naval Research Logistics Quarterly 17(1): 103–119.
  • Michaels, L. 1999. “The making of a lean aerospace supply chain.” Supply Chain Management: An International Journal 4(3): 135–144.
  • Syntetos, A. A., and J. E. Boylan. 2001. “On the bias of intermittent demand estimates.” International Journal of Production Economics 71: 457–466.
  • Syntetos, A. A., and J. E. Boylan. 2005. “The Accuracy of Intermittent Demand Estimates.” International Journal of Forecasting 21: 303–314.
  • Syntetos, A., and J. Boylan. 2006. “Comments on the Attribution of and Intermittent Demand Estimator.” International Journal of Forecasting 22: 202.
  • Syntetos, A. A., M. Z. Babai, Y. Dallery, and R. Teunter. 2009. “Periodic Control of Intermittent Demand Items: Theory and Empirical Analysis.” Journal of the Operational Research Society 60: 611–618.
  • Syntetos, A. A., J. E. Boylan, and S. M. Disney. 2009a. “Forecasting for Inventory Planning: a 50-review.” Journal of the Operational Research Society 60: 149–160.
  • Syntetos, A., K. Nikolopoulos, J. Boylan, R. Fildes, and P. Goodwin. 2009b. “The effects of integrating management judgement into intermittent demand forecasts.” International Journal of Production Economics 118(1): 72–81.
  • Theil, H., 1966. Applied Economic Forecasting. Amsterdam-Holland Publishing Company.
  • Tysseland, B. 2009. “Spare parts optimization process and results: OPUS10 cases in the Norwegian Defence.” International Journal of Physical Distribution & Logistics Management 39(1): 8–27.
  • Venkataraman, R., and J. Nathan. 1999. “Effect of forecast errors on rolling horizon master production schedule cost performance for various replanning intervals.” Production Planning and Control 10(7): 682–689.
  • Viertl, R. 2006. “Univariate statistical analysis with fuzzy data.” Computational Statistics & Data Analysis 51(1): 33–147.
  • Wahab, D. 2008. Neural Network Models Using SAS Enterprise Miner, 22nd Annual SAS Malaysia Forum. Kuala Lumpur Convention Centre: University Malaya.
  • Wallstrom, P. 2009. Evaluation of Forecasting Techniques and Forecast Errors - With Focus on Intermittent Demand. Licentiate Thesis: Lulea University of Technology.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.