Publication Cover
Production Planning & Control
The Management of Operations
Volume 25, 2014 - Issue 12
806
Views
3
CrossRef citations to date
0
Altmetric
Articles

A solution approach to a synchronisation problem in a JIT production system

, &
Pages 990-998 | Received 05 Oct 2012, Accepted 27 Mar 2013, Published online: 27 Nov 2013

References

  • Altun, K., and A. Golec. 2011. “A Comparative Simulation Study of Production Control Systems.” Erciyes University Journal of the Institute of Science and Technology 27 (2): 200–207.
  • Boysen, N., M. Fliedner, and A. Scholl. 2009. “Sequencing Mixed-model Assembly Lines: Survey, Classification and Model Critique.” European Journal of Operational Research 192 (2): 349–373.
  • Chakravorty, S. S., and J. B. Atwater. 2006. “Bottleneck Management: Theory and Practice.” Production Planning & Control 17 (5): 441–447.
  • Demeester, L., and C. Tang. 1996. “Reducing Cycle Time at an IBM Wafer Fabrication Facility.” Interfaces 26 (2): 34–49.
  • Dowlatshahi, S., and F. Taham. 2009. “The Development of a Conceptual Framework for Just-In-Time Implementation in SMEs.” Production Planning & Control 20 (7): 611–621.
  • Ehteshami, B., R. G. Petrakian, and P. M. Shabe. 1992. “Trade-offs in Cycle Time Management: Hot Lots.” IEEE Transactions on Semiconductor Manufacturing 5 (2): 101–106.
  • Goldratt, E. 1986. The Goal: A Process of Ongoing Improvement. Great Barrington, MA, USA: North River Press.
  • Golhar, D. Y., and C. L. Stamm. 1991. “The JIT Philosophy: A Literature Review.” International Journal of Production Research 29 (4): 657–676.
  • Gunesakaran, A., S. K. Goyal, T. Martikainen, and P. Yli-Olli. 1993. “Modelling and Analysis of Just-in-Time Manufacturing Systems.” International Journal of Production Economics 32 (1): 23–37.
  • Iwase, M., and K. Ohno. 2011. “The Performance Evaluation of a Multi-stage JIT Production System with Stochastic Demand and Production Capacities.” European Journal of Operational Research 214 (2): 216–222.
  • Kotani, S., T. Ito, and K. Ohno. 2004. “Sequencing Problem for a Mixed-model Assembly Line in the Toyota Production System.” International Journal of Production Research 42 (23): 4955–4974.
  • Kumar, C. S., and R. Panneerselvam. 2007. “Literature Review of JIT-KANBAN System.” International Journal of Advanced Manufacturing Technology 32 (3–4): 393–408.
  • Kuo, C.-J., C.-F. Chien, and J.-D. Chen. 2011. “Manufacturing Intelligence to Exploit the Value of Production and Tool Data to Reduce Cycle Time.” IEEE Transactions on Automation Science and Engineering 8 (1): 103–111.
  • Lee, Y. H., and T. Kim. 2002. “Manufacturing Cycle Time Reduction Using Balance Control in the Semiconductor Fabrication Line.” Production Planning & Control 13 (6): 529–540.
  • Li, L., Q. Chang, J. Ni, and S. Biller. 2009. “Real Time Production Improvement Through Bottleneck Control.” International Journal of Production Research 47 (21): 6145–6158.
  • Lin, Y. C., C. H. Tsai, R. K. Li, C. P. Chen, and H. C. Chen. 2008. “The Study of the Cycle Time Improvement by Work-In-Process Statistical Process Control Method for IC Foundry Manufacturing.” Asian Journal on Quality 9 (3): 71–91.
  • Mackelprang, A. W., and A. Nair. 2010. “Relationship Between Just-in-time Manufacturing Practices and Performance: A Meta-analytic Investigation.” Journal of Operations Management 28 (4): 283–302.
  • Maiga, A. S., and F. A. Jacobs. 2009. “JIT Performance Effects: A Research Note.” Advances in Accounting, Incorporating Advances in International Accounting 25 (2): 183–189.
  • Mathieu, R. G., B. A. Wray, and I. S. Markham. 2002. “An Approach to Learning from Both Good and Poor Factory Performance in a Kanban-based Just-in-time Production System.” Production Planning & Control 13 (8): 715–724.
  • Miltenburg, J., and D. Sparling. 1996. “Managing and Reducing Total Cycle Time: Models and Analysis.” International Journal of Production Economics 46–47: 89–108.
  • Moras, R. G., M. R. Jalali, and R. A. Dudek. 1991. “A Categorized Survey of the JIT Literature.” Production Planning & Control 2 (4): 322–334.
  • Ohno, T. 1988. Toyota Production System Beyond Large Scale Production. Cambridge: Productivity Press.
  • Rodrigues, L. L. R., Patel, R., Gopalakrishna, B., Shetty, P. K., Rao, B. R. S. 2010. ICMIT 2010 – 5th IEEE International Conference on Management of Innovation and Technology, Singapore, June 2–5.
  • Rooney, J. J., and L. N. V. Heuvel. 2004. “Root Cause Analysis for Beginners.” Quality Progress 37 (7): 45–53.
  • Sandanayake, Y. G., C. F. Oduoza, and D. G. Proverbs. 2008. “A Systematic Modelling and Simulation Approach for JIT Performance Optimization.” Robotics and Computer-Integrated Manufacturing 24 (6): 735–743.
  • Scholz-Reiter, B., K. Windt, and H. Liu. 2011. “Modelling Dynamic Bottlenecks in Production Networks.” International Journal of Computer Integrated Manufacturing 24 (5): 391–404.
  • Seth, D., and V. Gupta. 2005. “Application of Value Stream Mapping for Lean Operations and Cycle Time Reduction: An Indian Case Study.” Production Planning & Control 16 (1): 44–59.
  • Sugimori, Y., K. Kusonoki, F. Cho, and S. Uchikawa. 1977. “Toyota Production System and Kanban System Materialization of Just In Time and Respect for Human System.” International Journal of Production Research 15 (6): 553–564.
  • Tamura, T., T. Okumura, T. S. Dhakar, and K. Ohno. 2011. “Optimal Production Sequencing Problem to Minimise Line Stoppage Time in a Mixed-model Assembly Line.” International Journal of Production Research 49 (14): 4299–4315.
  • Ucar, H. 2012. “Throughput Analysis and Bottleneck Management of Production Lines.” PhD thesis, Wayne State University, Detroit, MI, USA.
  • Wein, L. M. 1992. “On the relationship between yield and cycle time in semiconductor wafter fabrication.” IEEE Transactions on Semiconductor Manufacturing 5 (2): 156–158.
  • Xiaobo, Z., and K. Ohno. 1994. “A Sequencing Problem for a Mixed-model Assembly Line in a JIT Production System.” Computers & Industrial Engineering 27 (1–4): 71–74.
  • Xiaobo, Z., and K. Ohno. 1997. “Algorithms for Sequencing Mixed-models on an Assembly Line in a JIT Production System.” Computers & Industrial Engineering 32 (1): 47–56.
  • Xiaobo, Z., and K. Ohno. 2000. “Properties of a Sequencing Problem for a Mixed Model Assembly Line with Conveyor Stoppages.” European Journal of Operational Research 124 (3): 560–570.
  • Yen, L. Y., and K. H. Chang. 2012. “Cycle Time Reduction for Photolithography Area with Multi-Workstation.” Proceedings of the International Conference on Computer Supported Cooperative Work in Design 16: 742–746.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.