2,258
Views
34
CrossRef citations to date
0
Altmetric
Articles

Using the SCOR model’s performance measurements to improve construction logistics

&
Pages 1065-1078 | Received 04 May 2013, Accepted 23 May 2013, Published online: 25 Jun 2013

References

  • Agapiou, A., R. Flanagan, G. Norman, and D. Notman. 1998. “The Changing Role of Builders Merchants in the Construction Supply Chain.” Construction Management & Economics 16 (3): 351–361.
  • Akintoye, A., G. McIntosh, and E. Fitzgerald. 2000. “A Survey of Supply Chain Collaboration and Management in the UK Construction Industry.” European Journal of Purchasing and Supply Management 6 (3–4): 159–168.
  • Baladhandayutham, T., and S. Venkatesh. 2012. “An Analysis on Application of Lean Supply Chain Concept for Construction Projects.” Synergy (0973–8819) 10 (1): 25–36.
  • Ballard, G. 2000. “The Last Planner System of Production Control.” Doctoral Thesis (Doctor of Philosophy). University of Birmingham.
  • Ballard, R. 2010. “Construction Logistics: A Personal View.” Logistics & Transport Focus 12 (4): 42–45.
  • Bankvall, L., L. E. Bygballe, A. Dubois, and M. Jahre. 2010. “Interdependence in Supply Chains and Projects in Construction.” Supply Chain Management: An International Journal 15 (5): 385–393.
  • Bassioni, H. A., A. D. F. Price, and T. M. Hassan. 2005. “Building a Conceptual Framework for Measuring Business Performance in Construction: An Empirical Evaluation.” Construction Management and Economics 23 (5): 495–507.
  • (BI) The Swedish Construction Federation. 2008. Byggbranschens Leveransklausuler [Online]. Accessed June 25, 2012. http://publikationer.bygg.org/UserFiles/Standardavtal/Leveransklausuler_byggbranschen_2008.pdf.
  • Bygballe, L. E., M. Jahre, and A. Swärd. 2010. “Partnering Relationships in Construction: A Literature Review.” Journal of Purchasing and Supply Management 16 (4): 239–253.
  • Chan, A. P. C., and A. P. L. Chan. 2004. “Key Performance Indicators for Measuring Construction Success.” Benchmarking: An International Journal 11 (2): 203–221.
  • Chan, A. P. C., D. Scott, and A. P. L. Chan. 2004. “Factors Affecting the Success of a Construction Project.” Journal of Construction Engineering & Management 130 (1): 153–155.
  • Cheng, J. C. P., K. H. Law, H. Bjornsson, A. Jones, and R. D. Sriram. 2010. “Modeling and Monitoring of Construction Supply Chains.” Advanced Engineering Informatics 24 (4): 435–455.
  • Chua, D. K. H., and Y. C. Kog. 1997. “Model for Construction Budget Performance – Neural Network Approach.” Journal of Construction Engineering & Management 123 (3): 214.
  • Cohen, S., and J. Roussel. 2005. Strategic Supply Chain Management. New York: McGraw-Hill.
  • Cooper, M. C., and L. M. Ellram. 1993. “Characteristics of Supply Chain Management and the Implications for Purchasing and Logistics Strategy.” International Journal of Logistics Management 4 (2): 13–24.
  • Costa, D. B., C. T. Formoso, M. Kagioglou, L. F. Alarcón, and C. H. Caldas. 2006. “Benchmarking Initiatives in the Construction Industry: Lessons Learned and Improvement Opportunities.” Journal of Management in Engineering 22 (4): 158–167.
  • Cox, A., and P. Ireland. 2002. “Managing Construction Supply Chains: The Common Sense Approach.” Engineering Construction & Architectural Management 9 (5/6): 409–418.
  • Cox, R. F., R. R. A. Issa, and D. Ahrens. 2003. “Management’s Perception of Key Performance Indicators for Construction.” Journal of Construction Engineering & Management 129 (2): 142–151.
  • Dainty, A. R. J., G. H. Briscoe, and S. J. Millett. 2001. “Subcontractor Perspectives on Supply Chain Alliances.” Construction Management & Economics 19 (8): 841–848.
  • Dainty, A. R. J., S. J. Millett, and G. H. Briscoe. 2001. “New Perspectives on Construction Supply Chain Integration.” Supply Chain Management: An International Journal 6 (4): 163–173.
  • Dawood, N. 2010. “Development of 4d-based Performance Indicators in Construction Industry.” Engineering, Construction and Architectural Management 17 (2): 210–230.
  • di Martinelly, C., F. Riane, and A. Guinet. 2009. “A Porter-scor Modelling Approach for the Hospital Supply Chain.” International Journal of Logistics Systems and Management 5 (3): 436–456.
  • Egan, J. 1998. Rethinking Construction. London: Department of the Environment, Transport and the Regions.
  • Eisenhardt, K. M. 1989. “Building Theories from Case Study Research.” Academy of Management Review 14 (4): 532–550.
  • Fearne, A., and N. Fowler. 2006. “Efficiency Versus Effectiveness in Construction Supply Chains: The Dangers of ‘Lean’ Thinking in Isolation.” Supply Chain Management: An International Journal 11 (4): 283–287.
  • Fernie, S., and A. Thorpe. 2007. “Exploring Change in Construction: Supply Chain Management.” Engineering, Construction and Architectural Management 14 (4): 319–333.
  • Green, S. D., S. Fernie, and S. Weller. 2005. “Making Sense of Supply Chain Management: A Comparative Study of Aerospace and Construction.” Construction Management and Economics 23 (6): 579–593.
  • Houlihan, J. B. 1985. “International Supply Chain Management.” International Journal of Physical Distribution and Materials Management 15 (1): 22–38.
  • Jang, H., J. S. Russell, and J. S. Yi. 2003. “A Project Manager’s Level of Satisfaction in Construction Logistics.” Canadian Journal of Civil Engineering 30 (6): 1133–1142.
  • Johansson, M., and F. Persson. 2011. “Towards a Scor-based Analysis Tool for Construction Management and Logistics.” In PLANs FoT-konferens 2011, 2011 Norrköping Sweden, edited by F. Persson and M. Rudberg, 125–139. Stockholm: PLAN.
  • Karim, K., M. Marosszeky, and S. Davis. 2006. “Managing Subcontractor Supply Chain for Quality in Construction.” Engineering, Construction and Architectural Management 13 (1): 27–42.
  • Koskela, L. 1992. “Application of the New Production Philosophy to Construction.” Thesis (PhD), Stanford University.
  • Latham, M. 1994. Constructing the Team. London: HMSO.
  • Legnani, E. 2011. “Controlling and Improving the Provision of After-sales Services. Doctoral Thesis (Doctor of Philosophy), Universtà Degli Studi di Bergamo.
  • Ling, F. Y. Y., and S. Peh. 2005. “Key Performance Indicators for Measuring Contractors’ Performance.” Architectural Science Review 48 (4): 357–365.
  • O’Brien, W. J. 1999. “Construction Supply Chain Management – A Vision for Advanced Coordination, Costing and Control.” In: Workshop: Defining a Research Agenda for AEC Process/Product Development in 2000 and Beyond, edited by I. D. Tommelein and M. A. Fischer, Berkeley-Stanford CE & M.
  • O’Brien, W. J., M. A. Fischer, and J. V. Jucker. 1995. “An Economic View on Project Coordination.” Construction Management and Economics 13: 393–400.
  • Pan, N. H., Y. Y. Lin, and N. F. Pan. 2010. “Enhancing Construction Project Supply Chains and Performance Evaluation Methods: A Case Study of a Bridge Construction Project.” Canadian Journal of Civil Engineering 37 (8): 1094–1106.
  • Persson, F., and Thunberg, M. 2012. “Adapting the Scor Model to the Construction Industry Settings.” In Proceedings of the 24th NOFOMA 2012, edited by J. Töyli et al. June 7–8, Turku, Finland.
  • Persson, F., Bengtsson, J., and Gustad, Ö. 2009. “Construction Logistics Improvements Using the Scor Model –Tornet Case.” In APMS09, edited by B. Vallespir and T. Alix, Bordeaux, France.
  • Radujković, M., M. Vukomanović, and I. B. Dunović. 2010. “Application of Key Performance Indicators in South-eastern European Construction.” Journal of Civil Engineering and Management 16 (4): 521–530.
  • Saad, M., M. Jones, and P. James. 2002. “A Review of the Progress Towards the Adoption of Supply Chain Management (SCM) Relationships in Construction.” European Journal of Purchasing & Supply Management 8 (3): 173–183.
  • SCC (Supply Chain Council). 2005. Data of Level 1 Metrics [Online]. Accessed June 16, 2005. Available: http://www.supply-chain.org.
  • Voordijk, H. 2010. “Physical Distribution Costs in Construction Supply Chains: A Systems Approach.” International Journal of Logistics Systems and Management 7 (4): 456–471.
  • Vrijhoef, R. 1998. “Co-makership in Construction: Towards Construction Supply Chain Management.” Thesis (PhD). Delft University of Technology.
  • Vrijhoef, R., and L. Koskela. 2000. “The Four Roles of Supply Chain Management in Construction.” European Journal of Purchasing and Supply Management 6: 169–178.
  • Wegelius-Lehtonen, T. 2001. “Performance Measurement in Construction Logistics.” International Journal of Production Economics 69: 107–116.
  • Yeung, J. F. Y., A. P. C. Chan, and D. W. M. Chan. 2008. “Establishing Quantitative Indicators for Measuring the Partnering Performance of Construction Projects in Hong Kong.” Construction Management & Economics 26 (3): 277–301.
  • Yin, K. R. 2009. Case Study Research: Design and Methods. 4th ed. London: Sage.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.