Publication Cover
Production Planning & Control
The Management of Operations
Volume 26, 2015 - Issue 13
472
Views
11
CrossRef citations to date
0
Altmetric
Articles

Implementation of S-DBR in four manufacturing SMEs: a research case study

&
Pages 1110-1127 | Received 18 May 2014, Accepted 31 Jan 2015, Published online: 17 Apr 2015

References

  • Ahmad, N., and R. G. Qiu. 2009. “Integrated Model of Operations Effectiveness of Small to Medium-Sized Manufacturing Enterprises.” Journal of Intelligent Manufacturing 20 (1): 79–89.10.1007/s10845-008-0105-5
  • Atwater, J. B., and S. S. Chakravorty. 2002. “A Study of the Utilization of Capacity Constrained Resources in Drum-Buffer-Rope Systems*.” Production and Operations Management 11 (2): 259–273.
  • Betterton, C. E., and J. F. Cox. 2009. “Espoused Drum-Buffer-Rope Flow Control in Serial Lines: A Comparative Study of Simulation Models.” International Journal of Production Economics 117 (1): 66–79.10.1016/j.ijpe.2008.08.050
  • Chakravorty, S. S. 2001. “An Evaluation of the DBR Control Mechanism in a Job Shop Environment.” Omega 29 (4): 335–342.10.1016/S0305-0483(01)00028-7
  • Chakravorty, S. S., and J. B. Atwater. 2005. “The Impact of Free Goods on the Performance of Drum-Buffer-Rope Scheduling Systems.” International Journal of Production Economics 95 (3): 347–357.10.1016/j.ijpe.2004.01.001
  • Chang, Y.-C., and W.-T. Huang. 2011. “Using Simplified Drum-Buffer-Rope for Re-Entrant Flow Shop Scheduling in a Random Environment.” African Journal of Business Management 5 (26): 10796–10810.
  • Corbett, T., and J. M. Csillag. 2001. Analysis of the Effects of Seven Drum-Buffer-Rope Implementations. Production and Inventory Management Journal 42 (3/4): 17–23.
  • Corsten, H., R. Gössinger, and N. Wolf. 2005. “Flexibility-Driven Order Releases in Job-Shop Production.” Technovation 25 (8): 815–830.10.1016/j.technovation.2004.01.011
  • Darlington, J., M. Francis, P. Found, and A. Thomas. 2014. “Design and Implementation of a Drum-Buffer-Rope Pull-System.” Production Planning & Control, No Ahead-of-Print 25: 1–16.
  • Dean, P., Y. Tu, and D. Xue. 2009. “An Information System for One-of-a-kind Production.” International Journal of Production Research 47 (4): 1071–1087.10.1080/00207540701543593
  • Gaury, E., J. Kleijnen, and H. Pierreval. 2001. “A Methodology to Customize Pull Control Systems.” Journal of the Operational Research Society 789–799.10.1057/palgrave.jors.2601153
  • Georgiadis, P., and A. Politou. 2013. “Dynamic Drum-Buffer-Rope Approach for Production Planning and Control in Capacitated Flow-Shop Manufacturing Systems.” Computers & Industrial Engineering 65 (4): 689–703.
  • Goldratt, E. 2006. “Reliable Rapid Response Strategy and Tactics Tree.” Goldratt’s Group.
  • Goldratt, E. M., and J. Cox. 1984. The Goal: A Process of Ongoing Improvement. New York: North River Press.
  • Goldratt, E. M., and R. E. Fox. 1986. The Race. New York: North River Press.
  • Goldratt, E., R. Goldratt, and E. Abramov. 2002. “Strategy and Tactics.” Goldratt Consulting.
  • Gonzalez-R, P. L., J. M. Framinan, and R. Ruiz-Usano. 2010. “A Multi-Objective Comparison of Dispatching Rules in a Drum–Buffer–Rope Production Control System.” International Journal of Computer Integrated Manufacturing 23 (2): 155–167.10.1080/09511920903440362
  • Gupta, M., H.-J. Ko, and H. Min. 2002. “TOC-based Performance Measures and Five Focusing Steps in a Job-shop Manufacturing Environment.” International Journal of Production Research 40 (4): 907–930.10.1080/00207540110097185
  • Hwang, Y. J., C.-L. Huang, and R. K. Li. 2011. “Using Simplified Drum-Buffer-Rope to Rapidly Improve Operational Performance: A Case Study in China.” Production and Inventory Management Journal 47 (1): 80–93.
  • Jodlbauer, H., and A. Huber. 2008. “Service-level Performance of MRP, Kanban, CONWIP and DBR due to Parameter Stability and Environmental Robustness.” International Journal of Production Research 46 (8): 2179–2195.10.1080/00207540600609297
  • Kadipasaoglu, S. N., W. Xiang, S. F. Hurley, and B. M. Khumawala. 2000. “A Study on the Effect of the Extent and Location of Protective Capacity in Flow Systems.” International Journal of Production Economics 63 (3): 217–228.10.1016/S0925-5273(99)00020-1
  • Kagan, A., K. Lau, and K. R. Nusgart. 1990. “Information System Usage within Small Business Firms.” Entrepreneurship: Theory and Practice 14 (3): 25–37.
  • Koh, S.-G., and R. L. Bulfin. 2004. “Comparison of DBR with CONWIP in an Unbalanced Production Line with Three Stations.” International Journal of Production Research 42 (2): 391–404.
  • Land, M. J., and G. J. Gaalman. 2009. “Production Planning and Control in SMEs: Time for Change.” Production Planning and Control 20 (7): 548–558.10.1080/09537280903034230
  • Lee, J.-H., J.-G. Chang, C.-H. Tsai, and R.-K. Li. 2010. “Research on Enhancement of TOC Simplified Drum-Buffer-Rope System Using Novel Generic Procedures.” Expert Systems with Applications 37 (5): 3747–3754.10.1016/j.eswa.2009.11.049
  • Lee, J.-H., Y. J. Hwang, M.-T. Wang, and R. K. Li. 2009. “Why is High Due-Date Performance So Difficult to Achieve? – An Experimental Study.” Production and Inventory Management Journal 45 (1): 30–43.
  • Lu, H., G. Q. Huang, and H. Yang. 2011. “Integrating Order Review/Release and Dispatching Rules for Assembly Job Shop Scheduling Using a Simulation Approach.” International Journal of Production Research 49 (3): 647–669.10.1080/00207540903524490
  • Maccarthy, B. L., and F. C. Fernandes. 2000. “A Multi-Dimensional Classification of Production Systems for the Design and Selection of Production Planning and Control Systems.” Production Planning & Control 11 (5): 481–496.
  • McCutcheon, D. M., and J. R. Meredith. 1993. “Conducting Case Study Research in Operations Management.” Journal of Operations Management 11 (3): 239–256.10.1016/0272-6963(93)90002-7
  • Olhager, J., and M. Rudberg. 2002. “Linking Manufacturing Strategy Decisions on Process Choice with Manufacturing Planning and Control Systems.” International Journal of Production Research 40 (10): 2335–2351.10.1080/00207540210131842
  • Patti, A. L., K. Watson, and J. H. Blackstone Jr. 2008. “The Shape of Protective Capacity in Unbalanced Production Systems with Unplanned Machine Downtime.” Production Planning and Control 19 (5): 486–494.10.1080/09537280802088733
  • Qiao, F., and Q. Wu. 2013. “Layered Drum-Buffer-Rope-Based Scheduling of Reentrant Manufacturing Systems.” IEEE Transactions on Semiconductor Manufacturing 26 (2): 178–187.10.1109/TSM.2013.2248763
  • Rahman, S.-U. 1998. “Theory of Constraints: A Review of the Philosophy and Its Applications.” International Journal of Operations & Production Management 18 (4): 336–355.
  • Sabuncuoglu, I., and H. Karapınar. 1999. “Analysis of Order Review/Release Problems in Production Systems.” International Journal of Production Economics 62 (3): 259–279.10.1016/S0925-5273(98)00248-5
  • Schragenheim, E., and H. W. Dettmer. 2000a. Manufacturing at Warp Speed: Optimizing Supply Chain Financial Performance. Boca Raton, FL: CRC Press.
  • Schragenheim, E., and H. W. Dettmer. 2000b. Simplified Drum-Buffer-Rope a Whole System Approach to High Velocity Manufacturing. Goal Systems International. http://goalsys.com/books/documents/S-DBRPaper.pdf.
  • Schragenheim, E., H. W. Dettmer, and J. W. Patterson. 2009. Supply Chain Management at Warp Speed: Integrating the System from End to End. Boca Raton, FL: CRC Press.10.1201/9781420073362
  • Schragenheim, E., A. Weisenstern, and A. Schragenheim. 2006. “What’s Really New in Simplified Dbr.” In TOCICO international conference, Las Vegas, NV.
  • Sirikrai, V., and P. Yenradee. 2006. “Modified Drum–Buffer–Rope Scheduling Mechanism for a Non-identical Parallel Machine Flow Shop with Processing-Time Variation.” International Journal of Production Research 44 (17): 3509–3531.10.1080/00207540600584805
  • Souza, F. B. D., and S. R. I. Pires. 2014. “Produzindo Para Disponibilidade: Uma Aplicação Da Teoria Das Restrições Em Ambientes De Produção Para Estoque.” [Make to Availabilty: A Theory of Constraints Application for Make to Stock Environments.] Gestão & Produção 21: 65–76.
  • Steele, D. C., P. R. Philipoom, M. K. Malhotra, and T. D. Fry. 2005. “Comparisons Between Drum–Buffer–Rope and Material Requirements Planning: A Case Study.” International Journal of Production Research 43 (15): 3181–3208.10.1080/00207540500076704
  • Stevenson, M., L. C. Hendry, and B. Kingsman. 2005. “A Review of Production Planning and Control: The Applicability of Key Concepts to the Make-to-order Industry.” International Journal of Production Research 43 (5): 869–898.10.1080/0020754042000298520
  • Towers, N., and B. Burnes. 2008. “A Composite Framework of Supply Chain Management and Enterprise Planning for Small and Medium-Sized Manufacturing Enterprises.” Supply Chain Management: An International Journal 13 (5): 349–355.10.1108/13598540810894933
  • Umble, M., E. Umble, and S. Murakami. 2006. “Implementing Theory of Constraints in a Traditional Japanese Manufacturing Environment: The Case of Hitachi Tool Engineering.” International Journal of Production Research 44 (10): 1863–1880.10.1080/00207540500381393
  • Van Wezel, W., D. P. Van Donk, and G. Gaalman. 2006. “The Planning Flexibility Bottleneck in Food Processing Industries.” Journal of Operations Management 24 (3): 287–300.10.1016/j.jom.2004.11.001
  • Watson, K. J., J. H. Blackstone, and S. C. Gardiner. 2007. “The Evolution of a Management Philosophy: The Theory of Constraints.” Journal of Operations Management 25 (2): 387–402.10.1016/j.jom.2006.04.004
  • Watson, K. J., and A. Patti. 2008. “A Comparison of JIT and TOC Buffering Philosophies on System Performance with Unplanned Machine Downtime.” International Journal of Production Research 46 (7): 1869–1885.10.1080/00207540600972943
  • Wu, H.-H., C.-P. Chen, C.-H. Tsai, and C.-J. Yang. 2010. “Simulation and Scheduling Implementation Study of TFT-LCD Cell Plants Using Drum–Buffer–Rope System.” Expert Systems with Applications 37 (12): 8127–8133.10.1016/j.eswa.2010.05.075

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.