References
- Abele, E., and F. Brungs. 2009. “Optimization of in-Plant Materials Provision via Milk-run.” Industrie Management 25: 61–64.
- Alnahal, M., A. Ridwan, and B. Noche. 2014. “In-plant Milk Run Decision Problems.” Proceedings of the 2nd IEEE International Conference on Logistics and Operations Management, Rabat, Morocco, 85–92.
- Álvarez, R., R. Calvo, M. Peña, and R. Domingo. 2009. “Redesigning an Assembly Line through Lean Manufacturing Tools.” The International Journal of Advanced Manufacturing Technology 43: 949–958.10.1007/s00170-008-1772-2
- Brar G. S., and G. Saini. 2011. “Milk-run Logistics: Literature Review and Directions.” Proceedings of the World Congress on Engineering, Vol. I. London, UK, July 6–8, 2011.
- Costa, B., L. Dias, J. Oliveira, and G. Pereira. 2008. “Simulation as a Tool for Planning and Material Delivery System to Manufacturing Lines.” Proceedings of Engineering Management Conference IEEE International, Estoril, Portugal, June 28–30.
- Coughlan, P., and D. Coghlan. 2002. “Action Research for Operations Management.” International Journal of Operations and Production Management 22 (2): 220–240.10.1108/01443570210417515
- Coughlan, P., and D. Coghlan. 2009. “Action Research.” In Researching Operations Management, edited by C. Karlsson. Oxon: Routledge. ISBN: 978-0-415-99056-1.
- Dallery, Y., and G. Liberopoulos. 2000. “Extended Kanban Control System: Combining Kanban and Base Stock.” IIE Transactions 32 (4): 369–386.
- Domingo, R., R. Alvarez, M. Peña, and R. Calvo. 2007. “Materials Flow Improvement in a Lean Assembly Line: A Case Study.” Assembly Automation 27: 141–147.
- Gaury, E. G. A., J. P. C. Kleijnen, and H. Pierreval. 2001. “A Methodology to Customize Pull Control Systems.” Journal of the Operational Research Society 52 (7): 789–799.10.1057/palgrave.jors.2601153
- Gitlow, H., and D. Levine. 2005. Six Sigma for Green Belts and Champions: Foundations, DMAIC, Tools, Cases and Certification. Saddle River, NJ: Prentice Hall.
- Godinho Filho, M., A. Boschi, A. F. Rentes, M. Thurer, and T. M. Bertani. 2015. “Improving Hospital Performance by Use of Lean Techniques: An Action Research Project in Brazil.” Quality Engineering 27: 196–211.10.1080/08982112.2014.942039
- Gupta, S., and Y. Al-Turki. 1997. “An Algorithm to Dynamically Adjust the Number of Kanbans in Stochastic Processing times and Variable Demand Environment.” Production Planning and Control 8 (2): 133–141.10.1080/095372897235398
- Hendry, L. C., Y. Huang, and M. Stevenson. 2013. “Workload Control: Successful Implementation Taking a Contingency-based View of Production Planning and Control.” International Journal of Operations & Production Management 33 (1): 69–103.
- Karlsson, C., and P. Ahlstrom. 1996. “The Difficult Path to Lean Product Development.” Journal of Product Innovation Management 13 (4): 283–295.10.1016/S0737-6782(96)00033-1
- Kilic, H., M. Durmusoglu, and M. Baskak. 2012. “Classification and Modeling for in-Plant Milk-run Distribution Systems.” The International Journal of Advanced Manufacturing Technology 62: 1135–1146.10.1007/s00170-011-3875-4
- Lage Junior, M., and M. Godinho Filho. 2010. “Variations of the Kanban System: Literature Review and Classification.” International Journal of Production Economics 125: 13–21.10.1016/j.ijpe.2010.01.009
- MacKerron, G., M. Kumar, V. Kumar, and A. Esain. 2014. “Supplier Replenishment Policy Using E-kanban: A Framework for Successful Implementation.” Production Planning and Control 25 (2): 161–175.10.1080/09537287.2013.782950
- de Mast, J., and J. Lokkerbol. 2012. “An Analysis of the Six Sigma DMAIC Method from the Perspective of Problem Solving.” International Journal of Production Economics 139 (2): 604–614.10.1016/j.ijpe.2012.05.035
- Monden, Y. 1983. Toyota Production System: Practical Approach to Production Management. New York, NY: Norcross: Industrial Engineering and Management Press.
- Nonthaleerak, P., and L. C. Hendry. 2007. “Six Sigma Action Research in Thailand: A Comparative Study.” International Journal of Services Technology and Management 8: 491–511.10.1504/IJSTM.2007.013944
- Ohno, T. 1988. Toyota Production System: Beyond Large-scale Production. 1st ed. New York: Productivity Press.
- Protzman, C., G. Mayzell, and J. Kerpchar. 2010. Leveraging Lean in Healthcare: Transforming Your Enterprise into a High Quality Patient Care Delivery System. 1st ed. New York: Productivity Press.
- Satoglu, S., and I. Sahin. 2013. “Design of a Just-in-Time Periodic Material Supply System for the Assembly Lines and an Application in Electronics Industry.” The International Journal of Advanced Manufacturing Technology 65: 319–332.10.1007/s00170-012-4171-7
- Shingo, S. 1989. A Study of the Toyota Production System from an Industrial Engineering Viewpoint. Cambridge, MA: Productivity Press.
- Sugimori, Y., K. Kusunoki, F. Cho, and S. Uchikawa. 1977. “Toyota Production System and Kanban System Materialization of Just-in-Time and Respect-for-Human System.” International Journal of Production Research 15 (6): 553–564.10.1080/00207547708943149
- Takahashi, K., and N. Nakamura. 1999. “Reacting JIT Ordering Systems to the Unstable Changes in Demand.” International Journal of Production Research 37 (10): 2293–2313.10.1080/002075499190770
- Vaidyanathan, B., J. O. Matson, D. Miller, and J. E. Matson. 1999. “A Capacitated Vehicle Routing Problem for Just in Time Delivery.” IIE Transaction 31: 1083–1092.
- Westbrook, R. 1995. “Action Research: A New Paradigm for Research in Production and Operations Management.” International Journal of Operations and Production Management 15 (12): 6–20.10.1108/01443579510104466
- White, R. E., and V. Prybutok. 2001. “The Relationship between JIT Practices and Type of Production System.” Omega 29: 113–124.10.1016/S0305-0483(00)00033-5
- White, R. E., J. N. Pearson, and J. R. Wilson. 1999. “JIT Manufacturing: A Survey of Implementations in Small and Large U.S. Manufacturers.” Management Science 45 (1): 1–15.10.1287/mnsc.45.1.1