Publication Cover
Production Planning & Control
The Management of Operations
Volume 28, 2017 - Issue 5
395
Views
10
CrossRef citations to date
0
Altmetric
Original Articles

On the integration of due date setting and order release control

, , &
Pages 420-430 | Received 04 Mar 2016, Accepted 11 Feb 2017, Published online: 14 Mar 2017

References

  • Ahmed, I., and W. W. Fisher. 1992. “Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling.” Decision Sciences 23: 633–647.10.1111/deci.1992.23.issue-3
  • Bechte, W. 1994. “Load-oriented Manufacturing Control Just-in-time Production for Job Shops.” Production Planning & Control 5 (3): 292–307.10.1080/09537289408919499
  • Bergamaschi, D., R. Cigolini, M. Perona, and A. Portioli. 1997. “Order Review and Release Strategies in a Job Shop Environment: A Review and a Classification.” International Journal of Production Research 35 (2): 399–420.10.1080/002075497195821
  • Bertrand, J. W. M. 1983a. “The Use of Workload Information to Control Job Lateness in Controlled and Uncontrolled Release Production Systems.” Journal of Operations Management 3 (2): 79–92.10.1016/0272-6963(83)90009-8
  • Bertrand, J. W. M. 1983b. “The Effect of Workload Dependent Due-dates on Job Shop Performance.” Management Science 29 (7): 799–816.10.1287/mnsc.29.7.799
  • Bertrand, J. W. M., and J. C. Wortmann. 1981. Production Control and Information Systems for Component-manufacturing Shops. Amsterdam: Elsevier Scientific Publishing Company.
  • Cheng, T. C. E., and M. C. Gupta. 1989. “Survey of Scheduling Research Involving Due Date Determination Decisions.” European Journal of Operational Research 38: 156–166.10.1016/0377-2217(89)90100-8
  • Cigolini, R., and A. Portioli-Staudacher. 2002. “An Experimental Investigation on Workload Limiting Methods with ORR Policies in a Job Shop Environment.” Production Planning & Control 13 (7): 602–613.10.1080/0953728021000026221
  • Enns, S. T. 1995a. “An Integrated System for Controlling Shop Loading and Work Flow.” International Journal of Production Research 33 (10): 2801–2820.10.1080/00207549508904846
  • Enns, S. T. 1995b. “A Dynamic Forecasting Model for Job Shop Flow Time Prediction and Tardiness Control.” International Journal Production Research 33 (5): 1295–1312.
  • Fredendall, L. D., D. Ojha, and J. W. Patterson. 2010. “Concerning the Theory of Workload Control.” European Journal of Operational Research 201 (1): 99–111.10.1016/j.ejor.2009.02.003
  • Hendry, L. C., and B. G. Kingsman. 1991. “A Decision Support System for Job Release in Make‐to‐order Companies.” International Journal of Operations & Production Management 11: 6–16.10.1108/01443579110144655
  • Hendry, L. C., B. G. Kingsman, and P. Cheung. 1998. “The Effect of Workload Control (WLC) on Performance in Make-to-Order Companies.” Journal of Operations Management 16 (1): 63–75.
  • Hendry, L. C., Y. Huang, and M. Stevenson. 2013. “Workload Control: Successful Implementation Taking a Contingency-based View of Production Planning & Control.” International Journal of Operations & Production Management 33 (1): 69–103.10.1108/01443571311288057
  • Hopp, W. J., and M. L. R. Sturgis. 2000. “Quoting Manufacturing Due Dates Subject to a Service Level Constraint.” IIE Transactions 32: 771–784.
  • Kanet, J. J. 1988. “Load-limited Order Release in Job Shop Scheduling Systems.” Journal of Operations Management 7 (3-4): 44–58.10.1016/0272-6963(81)90003-6
  • Kingsman, B. G. 2000. “Modelling Input-output Workload Control for Dynamic Capacity Planning in Production Planning Systems.” International Journal of Production Economics 68 (1): 73–93.10.1016/S0925-5273(00)00037-2
  • Kingsman, B. G., and L. C. Hendry. 2002. “The Relative Contributions of Input and Output Controls on the Performance of a Workload Control System in Make-to-Order Companies.” Production Planning & Control 13 (7): 579–590.10.1080/0953728021000026285
  • Kingsman, B. G., I. P. Tatsiopoulos, and L. C. Hendry. 1989. “A Structural Methodology for Managing Manufacturing Lead Times in Make-to-Order Companies.” European Journal of Operational Research 40: 196–209.10.1016/0377-2217(89)90330-5
  • Land, M. J. 2009. “Cobacabana (Control of Balance by Card-based Navigation): A Card-based System for Job Shop Control.” International Journal of Production Economics 117: 97–103.10.1016/j.ijpe.2008.08.057
  • Land, M. J., and G. J. C. Gaalman. 1996. “Workload Control Concepts in Job Shops: A Critical Assessment.” International Journal of Production Economics 46–47: 535–548.10.1016/S0925-5273(96)00088-6
  • Land, M. J., and G. J. C. Gaalman. 1998. “The Performance of Workload Control Concepts in Job Shops: Improving the Release Method.” International Journal of Production Economics 56–57: 347–364.10.1016/S0925-5273(98)00052-8
  • Little, J. 1961. “A proof of the theorem L = λW.” Operations Research 9: 383–387.10.1287/opre.9.3.383
  • Lödding, H. 2013. Handbook of Manufacturing Control: Fundamentals, Description, Configuration. Heidelberg: Springer.10.1007/978-3-642-24458-2
  • Melnyk, S. A., and G. L. Ragatz. 1989. “Order Review/Release: Research Issues and Perspectives.” International Journal of Production Research 27 (7): 1081–1096.10.1080/00207548908942609
  • Moses, S., H. Grant, L. Gruenwald, and S. Pulat. 2004. “Real-time Due-date Promising by Build-to-Order Environments.” International Journal of Production Research 42–20: 4353–4375.10.1080/00207540410001716462
  • Nyhuis, P., and H. P. Wiendahl. 2009. Fundamentals of Production Logistics: Theory, Tools and Applications. Heidelberg: Springer.10.1007/978-3-540-34211-3
  • Oosterman, B., M. J. Land, and G. Gaalman. 2000. “The Influence of Shop Characteristics on Workload Control.” International Journal of Production Economics 68 (1): 107–119.10.1016/S0925-5273(99)00141-3
  • Ragatz, G. L., and V. A. Mabert. 1984. “A Simulation Analysis of Due Date Assignment Rules.” Journal of Operations Management 5 (1): 27–39.10.1016/0272-6963(84)90005-6
  • Stadtler, H., and C. Kilger. 2005. Supply Chain Management and Advanced Planning: Concepts, Models Software and Case Studies. Berlin: Springer.10.1007/b106298
  • Stevenson, M., L. C. Hendry, and B. G. Kingsman. 2005. “A Review of Production Planning and Control: The Applicability of Key Concepts to the Make-to-Order Industry.” International Journal of Production Research 43 (5): 869–898.10.1080/0020754042000298520
  • Thürer, M., M. Stevenson, C. Silva, M. J. Land, and L. D. Fredendall. 2012. “Workload Control (WLC) and Order Release: A Lean Solution for Make-to-Order Companies.” Production & Operations Management 21 (5): 939–953.10.1111/poms.2012.21.issue-5
  • Thürer, M., M. Stevenson, C. Silva, and M. J. Land. 2013. “Towards an Integrated Workload Control (WLC) Concept: The Performance of Due Date Setting Rules in Job Shops with Contingent Orders.” International Journal of Production Research 51 (15): 4502–4516.10.1080/00207543.2013.774485
  • Thürer, M., M. Stevenson, C. Silva, M. J. Land, L. D. Fredendall, and S. A. Melnyk. 2014a. “Lean Control for Make-to-Order Companies: Integrating Customer Enquiry Management and Order Release.” Production & Operations Management 23 (3): 463–476.10.1111/poms.12058
  • Thürer, M., M. J. Land, and M. Stevenson. 2014b. “Card-based Workload Control for Job Shops: Improving COBACABANA.” International Journal of Production Economics 147: 180–188.10.1016/j.ijpe.2013.09.015
  • Thürer, M., M. J. Land, M. Stevenson, and L. D. Fredendall. 2016. “Card-based Delivery Date Promising in High-variety Manufacturing with Order Release Control.” International Journal of Production Economics 172: 19–30.10.1016/j.ijpe.2015.11.003
  • Vig, M. M., and K. J. Dooley. 1993. “Mixing Static and Dynamic Flow Time Estimates for Due-date Assignment.” Journal of Operations Management 11: 67–79.10.1016/0272-6963(93)90034-M
  • Weeks, J. K. 1979. “A Simulation Study of Predictable Due Dates.” Management Science 25 (4): 363–373.10.1287/mnsc.25.4.363
  • Wiendahl, H. P., J. Glässner, and D. Petermann. 1992. “Application of Load-oriented Manufacturing Control in Industry.” Production Planning & Control 3 (2): 118–129.10.1080/09537289208919381
  • Wisner, J. D. 1995. “A Review of the Order Release Policy Research.” International Journal of Operations & Production Management 15 (6): 25–40.10.1108/01443579510090318
  • Zäpfel, G., and H. Missbauer. 1993. “New Concepts for Production Planning and Control.” European Journal of Operational Research 67: 297–320.10.1016/0377-2217(93)90287-W

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.