Publication Cover
Production Planning & Control
The Management of Operations
Volume 28, 2017 - Issue 5
323
Views
10
CrossRef citations to date
0
Altmetric
Original Articles

The surprising effectiveness of earliest operation due-date sequencing

&
Pages 459-471 | Received 11 Jul 2016, Accepted 23 Jan 2017, Published online: 21 Mar 2017

References

  • Baker, K. R. 1974. Introduction to Sequencing and Scheduling. New York, NY: Wiley.
  • Bertsch, S.. 2014. “Modellierung der Terminabweichung.” [Modelling Lateness.] Dissertation, Leibniz Universität Hannover.
  • Conway, R. W., W. L. Maxwell, and L. W. Miller. 1967. Theory of Scheduling. Reading, MA: Addison-Wesley Pub. Co.
  • Dombrowski, U. 1988. Qualitätssicherung im Terminwesen der Werkstattfertigung [Quality Assurance of Due Dates in Job Shops]. Düsseldorf: VDI-Verl.
  • Kingsman, B. G., L. C. Hendry, A. Mercer, and A. de Souza. 1996. “Responding to Customer Enquiries in Make-to-order Companies: Problems and Solutions.” International Journal of Production Economics 46–47: 219–231.
  • Kuyumcu, A. 2013. Modellierung der Termintreue in der Produktion [Modelling Schedule Reliability in Production]. Dissertation TU Hamburg-Harburg.
  • Lödding, H. 2012. “A Manufacturing Control Model.” International Journal of Production Research 50 (22): 6311–6328.
  • Lödding, H. 2013. Handbook of Manufacturing Control. Fundamentals, Description, Configuration. Berlin: Springer-Verlag.
  • Lödding, H., and A. Kuyumcu. 2015. “Modelling Schedule Reliability.” International Journal of Production Research 53 (9): 2871–2884. doi:10.1080/00207543.2015.1008703.
  • Lödding, H., P. Nyhuis, M. Schmidt, and A. Kuyumcu. 2014. “Modelling Lateness and Schedule Reliability.” Production Planning & Control 25 (1): 59–72.
  • Park, C., J. Song, J.-G. Kim, and I. Kim. 1999. “Delivery Date Decision Support System for the Large Scale Make-to-order Manufacturing Companies: A Korean Electric Motor Company Case.” Production Planning and Control 10 (6): 585–597. doi:10.1080/095372899232885.
  • Plossl, G. W., and O. W. Wight. 1973. “Capacity Planning and Control.” Production and Inventory Management 3: 31–67.
  • Schmidt, M., S. Bertsch, and P. Nyhuis. 2014. “Schedule Compliance Operating Curves and their Application in Designing the Supply Chain of a Metal Producer.” Production Planning and Control 25 (2): 123–133. doi:10.1080/09537287.2013.782947.
  • Soepenberg, G. D., M. Land, and G. Gaalman. 2008. “The Order Progress Diagram: A Supportive Tool for Diagnosing Delivery Reliability Performance in Make-to-order Companies.” International Journal of Production Economics 112 (1): 495–503.
  • Soepenberg, G. D., M. Land, and G. Gaalman. 2012. “A Framework for Diagnosing the Delivery Reliability Performance of Make-to-order Companies.” International Journal of Production Research 50 (19): 5491–5507.
  • Wiendahl, H.-P., K. Helms, and P. Nyhuis. 1998. “Durchlaufzeit/2 – Die Potenziale liegen auf der Hand!” [Throughput Time/2 – The Potentials are Obvious. Results from a Bottleneck-oriented Logistics Analysis in the PCB Industry.] Werkstattstechnik online 88 (4): 159–164.
  • Yu, K.-W. 2001. Terminkennlinie. Eine Beschreibungsmethodik für die Terminabweichung im Produktionsbereich [Schedule Reliability Operating Curve. A Methodology for Describing Lateness in Production]. Düsseldorf: VDI-Verl.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.