Publication Cover
Production Planning & Control
The Management of Operations
Volume 29, 2018 - Issue 1
567
Views
4
CrossRef citations to date
0
Altmetric
Original Articles

Extending Little’s Law to single order throughput times

&
Pages 1-8 | Received 01 Feb 2015, Accepted 03 Aug 2017, Published online: 21 Sep 2017

References

  • Amiri, M., L. Olfat, and M. K. Ghorabaee. 2014. “Simultaneous Minimization of Total Tardiness and Waiting Time Variance on a Single Machine by Genetic Algorithms.” International Journal of Advanced Manufacturing Technology 72: 439–446.10.1007/s00170-014-5686-x
  • Bechte, W. 1980. “Steuerung der Durchlaufzeit durch belastungsorientierte Auftragsfreigabe bei Werkstattfertigung [Controlling Throughput Times Through Load-oriented Order Release in Job Shops].” Dissertation Universität Hannover.
  • Bechte, W. 1994. “Load-oriented Manufacturing Control: Just-in Time Production for Job Shops.” Production Planning & Control 5 (3): 292–307.10.1080/09537289408919499
  • Cai, X., and S. Zhou. 1997. “Sequencing Jobs with Random Processing times to Minimize Weighted Completion Time Variance*.” Annals of Operations Research 70 (1): 241–260.10.1023/A:1018926305578
  • Conway, R. W., W. L. Maxwell, and L. W. Miller. 1967. Theory of Scheduling. Reading, MA: Addison-Wesley Pub.
  • Eilon, S., and I. G. Chowdhury. 1977. “Minimising Waiting Time Variance in the Single Machine Problem.” Management Science 23 (6): 567–575.10.1287/mnsc.23.6.567
  • Hendry, L. C., and B. G. Kingsman. 1991. “Job Release: Part of a Hierarchical System to Manage Manufacturing Lead times in Make-to-order Companies.” Journal of the Operational Research Society 42 (10): 871–883.10.1057/jors.1991.167
  • Jendralski, J. 1978. “Kapazitätsterminierung zur Bestandsregelung in der Werkstattfertigung [Capacity Scheduling for WIP Regulation in Job Shops].” Dissertation, Universität Hannover.
  • Kingsman, B. G., I. P. Tatsiopoulos, and L. C. Hendry. 1989. “A Structural Methodology for Managing Manufacturing Lead times in Make-to-order Companies.” European Journal of Operational Research 40: 196–209.10.1016/0377-2217(89)90330-5
  • Kubiak, W. 1995. “New Results on the Completion Time Variance Minimization.” Discrete Applied Mathematics 58: 157–168.10.1016/0166-218X(93)E0125-I
  • Kuyumcu, A. 2013. “Modellierung der Termintreue in der Produktion [Modelling Schedule Reliability in Production].” Dissertation TU Hamburg.
  • Land, M. J., and G. J. Gaalman. 1996. “Workload Control Concepts in Job Shops: A Critical Assessment.” International Journal of Production Research 46–47: 535–548.10.1016/S0925-5273(96)00088-6
  • Li, X., N. Ye, X. Xu, and R. Sawhey. 2007. “Influencing Factors of Job Waiting Time Variance on a Single Machine.” European Journal of Industrial Engineering 1 (1): 56–73.10.1504/EJIE.2007.012654
  • Liker, J. K. 2004. The Toyota Way. 14 Management Principles from the World’s Greatest Manufacturer. New York: McGraw-Hill.
  • Little, J. D. C. 1961. “A Proof for the Queuing Formula: L=Lambda W.” Operations Research 9 (3): 383–387.10.1287/opre.9.3.383
  • Little, J. D. C., and S. C. Graves. 2008. “Little’s Law.” In Building Intuition: Insights from Basic Operations Management Models and Principles, edited by D. Chhajed, and T. K. Lowe, 81–100. New York: Springer.10.1007/978-0-387-73699-0
  • Lödding, H. 2013. Handbook of Manufacturing Control: Fundamentals, Description, Configuration. Berlin: Springer.10.1007/978-3-642-24458-2
  • Lödding, H., and A. Kuyumcu. 2015. “Modelling Schedule Reliability.” International Journal of Production Research 53 (9): 2871–2884.10.1080/00207543.2015.1008703
  • Lödding, H., and A. Piontek. 2017. “The Surprising Effectiveness of Earliest Operation Due-date Sequencing.” Production Planning & Control 28 (5): 459–471.10.1080/09537287.2017.1302616
  • Lödding, H., P. Nyhuis, M. Schmidt, and A. Kuyumcu. 2014. “Modelling Lateness and Schedule Reliability: How Companies Can Produce on Time.” Production Planning & Control 25 (1): 59–72.10.1080/09537287.2012.655803
  • Merten, A. G., and M. E. Muller. 1972. “Variance Minimization in Single Machine Sequencing Problems.” Management Science: Journal of the Institute for Operations Research and the Management Sciences 18 (9): 518–528.10.1287/mnsc.18.9.518
  • Nielsen, P., Z. Michna, and D. D. Ngoc Anh. 2014. “An Empirical Investigation of Lead Time Distributions.” IFIP Advances in Information and Communication Technology AICT 438 (Part I): 435–442.10.1007/978-3-662-44739-0
  • Nyhuis, P., and H.-P. Wiendahl. 2009. Fundamentals of Production Logistics: Theory, Tools and Applications. Berlin, Heidelberg: Springer-Verlag.10.1007/978-3-540-34211-3
  • Soepenberg, G. D., M. J. Land, and G. J. C. Gaalman. 2012. “Workload Control Dynamics in Practice.” International Journal of Production Research 50 (2): 443–460.10.1080/00207543.2010.539277
  • Stevenson, M., Y. Huang, L. C. Hendry, and E. Soepenberg. 2011. “The Theory and Practice of Workload Control: A Research Agenda and Implementation Strategy.” International Journal of Production Economics 131 (2): 689–700.10.1016/j.ijpe.2011.02.018
  • Tatsiopoulos, I. P., and B. G. Kingsman. 1983. “Lead Time Management.” European Journal of Operational Research 14 (4): 351–358.10.1016/0377-2217(83)90235-7
  • Thürer, M., M. Stevenson, C. Silva, M. J. Land, and L. D. Fredendall. 2012. “Workload Control and Order Release: A Lean Solution for Make-to-order Companies.” Production and Operations Management 21 (5): 939–953.10.1111/poms.2012.21.issue-5
  • Wiendahl, H.-P. 1997. Fertigungsregelung: Logistische Beherrschung von Fertigungsabläufen auf Basis des Trichtermodells [Manufacturing Control: Mastering Logistics of Manufacturing Processes Based on the Funnel Model]. 2nd ed. München: Hanser.
  • Wiendahl, H.-P., J. Glässner, and D. Petermann. 1992. “Application of Load-oriented Manufacturing Control in Industry.” Production Planning & Control 3 (2): 118–129.10.1080/09537289208919381
  • Womack, J. P., and D. T. Jones. 1996. Lean Thinking: Banish Waste and Create Wealth in Your Corporation. New York: Simon & Schuster.
  • Ye, N., X. Li, T. Farley, and X. Xu. 2005. “Job Scheduling Methods for Reducing Waiting Time Variance.” Computers & Operations Research 34 (10): 3069–3083.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.