References
- Andriolo, A., D. Battini, R. W. Grubbström, A. Persona, and F. Sgarbossa. 2014. “A Century of Evolution from Harris’s Basic Lot Size Model: Survey and Research Agenda.” International Journal of Production Economics 155: 16–38.10.1016/j.ijpe.2014.01.013
- Axsäter, S. 1987. “An Extension of the Extended Basic Period Approach for the Economic Lot Scheduling Problems.” Journal of Optimization Theory and Applications 52 (2): 179–189.10.1007/BF00941279
- Bomberger, E. E. 1966. “A Dynamic Programming Approach to a Deterministic Lot Sizing Scheduling Problem.” Management Science 12 (11): 778–784.10.1287/mnsc.12.11.778
- Brander, P., E. Levén, and A. Segerstedt. 2005. “Lot Sizes in a Capacity Constrained Facility – A Simulation Study of Stationary Stochastic Demand.” International Journal of Production Economics 93–94: 375–386.10.1016/j.ijpe.2004.06.034
- Byrne, M. D. 1990. “Multi-item Production Lot Sizing Using a Search Simulation Approach.” Engineering Costs and Production Economics 19: 307–311.10.1016/0167-188X(90)90057-O
- Chan, H. K., S. H. Chung, and M. K. Lim. 2012. “Recent Research Trend of Economic-Lot Scheduling Problems.” Journal of Manufacturing Technology Management 24 (3): 465–482.
- Clark, A., B. Almada-Lobo, and C. Almeder. 2011. “Lot Sizing and Scheduling: Industrial Extensions and Research Opportunities.” International Journal of Production Research 49 (9): 2457–2461.10.1080/00207543.2010.532908
- Elmaghraby, S. E. 1978. “The Economic Lot Scheduling Problem (ELSP): Review and Extensions.” Management Science 24 (6): 587–598.10.1287/mnsc.24.6.587
- Erlenkotter, D. 1990. “Ford Whitman Harris and the Economics Order Quantity Model.” Operations Research 38 (6): 937–946.10.1287/opre.38.6.937
- Forza, C. 2002. “Survey Research in Operations Management: A Process-based Perspective.” International Journal of Operations & Production Management 22 (2): 152–194.10.1108/01443570210414310
- Gallego, G. 1990. “Scheduling the Production of Several Items with Random Demands in a Single Facility.” Management Science 36 (12): 1579–1592.10.1287/mnsc.36.12.1579
- Gascon, A., R. C. Leachman, and P. Lefrancois. 1994. “Multi-item, Single-machine Scheduling Problem with Stochastic Demands: A Comparison of Heuristics.” International Journal of Production Research 32: 583–596.10.1080/00207549408956954
- Hanssmann, F. 1962. Operations Research in Production and Inventory Control. New York: Willey.
- Holmbom, M., and A. Segerstedt. 2014. “Economic Order Quantities in Production: From Harris to Economic Lot Scheduling Problems.” International Journal of Production Economics 155: 82–90.10.1016/j.ijpe.2014.03.024
- Holmbom, M., A. Segerstedt, and E. van der Sluis. 2013. “A Solution Procedure for Economic Lot Scheduling Problems Even in High Utilization Facilities.” International Journal of Production Research 51 (12): 3765–3777.10.1080/00207543.2013.765075
- Hopp, W. J., and M. L. Spearman. 2000. Factory Physics. Boston, MA: Irwin/McGraw-Hill.
- Hopp, W. J., and M. L. Spearman. 2013. A Ciência Da Fábrica. 3a ed. Bookman: Porto Alegre.
- Jones, R. C., and R. R. Inman. 1989. “When is the Economic Lot Scheduling Problem Easy?” IIE Transactions 21 (1): 11–20.10.1080/07408178908966202
- Leachman, R. C., Z. K. Xiong, A. Gascon, and K. Park. 1991. “Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-item, Single-machine.” Management Science 37 (9): 1201–1205.10.1287/mnsc.37.9.1201
- Levén, E., and A. Segerstedt. 2007. “A Scheduling Policy for Adjusting Economic Lot Quantities to a Feasible Solution.” European Journal of Operational Research 179 (2): 414–423.10.1016/j.ejor.2006.03.038
- Löhndorf, N., M. Riel, and S. Minner. 2014. “Simulation Optimization for the Stochastic Economic Lot Scheduling Problem with Sequence-dependent Setup times.” International Journal of Production Economics 157: 170–176.10.1016/j.ijpe.2014.05.006
- Löndorf, N., and S. Minner. 2013. “Simulation Optimization for the Stochastic Economic Lot Scheduling Problem.” IIE Transactions 45 (7): 796–810.10.1080/0740817X.2012.662310
- Nilsson, K., and A. Segerstedt. 2008. “Corrections of Costs to Feasible Solutions of Economic Lot Scheduling Problems.” Computers & Industrial Engineering 54 (1): 155–168.10.1016/j.cie.2007.07.012
- Olhager, J., and F. Persson. 2006. “Simulating Production and Inventory Control Systems: A Learning Approach to Operational Excellence.” Production Planning & Control 17 (2): 113–127.10.1080/09537280500223921
- Rogers, J. 1958. “A Computational Approach to the Economic Lot Scheduling Problem.” Management Science 4 (3): 264–291.10.1287/mnsc.4.3.264
- Romero-Silva, R., M. Hurtado, and J. Santos. 2016. “Is the Scheduling Task Context-dependent? A Survey Investigating the Presence of Constraints in Different Manufacturing Contexts.” Production Planning & Control 27 (9): 753–760.10.1080/09537287.2016.1166274
- Romero-Silva, R., J. Santos, and M. Hurtado. 2015. “A Framework for Studying Practical Production Scheduling.” Production Planning & Control 26 (6): 438–450.10.1080/09537287.2014.919413
- Santander-Mercado, A., and M. Jubiz-Diaz. 2016. “The Economic Lot Scheduling Problem: A Survey.” International Journal of Production Research 54 (16): 4973–4992.10.1080/00207543.2016.1154214
- Segerstedt, A. 1999. “Lot Sizes in a Capacity Constrained Facility with Available Initial Inventories.” International Journal of Production Economics 59 (1-3): 469–475.10.1016/S0925-5273(98)00111-X
- Sox, C. R., P. L. Jackson, A. Bowman, and J. A. Muckstadt. 1999. “A Review of the Stochastic Lot Scheduling Problem.” International Journal of Production Economics 62 (3): 181–200.10.1016/S0925-5273(98)00247-3
- Thomson Reuters. 2012. Thomson Reuters Business Classification. http://financial.thomsonreuters.com/content/dam/openweb/documents/pdf/financial/trbc-fact-sheet.pdf.
- Vaughan, T. S. 2007. “Cyclical Schedules vs. Dynamic Sequencing: Replenishment Dynamics and Inventory Efficiency.” International Journal of Production Economics 107 (2): 518–527.10.1016/j.ijpe.2006.10.010
- Vergin, R. C., and T. N. Lee. 1978. “Scheduling Rules for the Multiple Product Single Machine System With Stochastic Demand.” Journal of Operational Research and Information Processing 16 (1): 64–73.
- Wiers, V. C. S. 1996. “A Review of the Applicability of OR and AI Scheduling Techniques in Practice.” Omega 25 (2): 145–153.
- Wiers, V. C. S. 2009. “The Relationship between Shop Floor Autonomy and APS Implementation Success: Evidence from Two Cases.” Production Planning & Control 20 (7): 576–585.10.1080/09537280903034289
- Winands, E. M. M., I. J. B. F. Adan, and G. J. van Houtum. 2011. “The Stochastic Economic Lot Scheduling Problem: A Survey.” European Journal of Operational Research 210 (1): 1–9.10.1016/j.ejor.2010.06.011