Publication Cover
Production Planning & Control
The Management of Operations
Volume 29, 2018 - Issue 11
398
Views
1
CrossRef citations to date
0
Altmetric
Articles

A routine-based framework implementing workload control to address recurring disturbances

ORCID Icon, ORCID Icon, ORCID Icon & ORCID Icon
Pages 943-957 | Received 31 May 2017, Accepted 21 Jun 2018, Published online: 07 Aug 2018

References

  • Abdelkafi, N. 2008. Variety Induced Complexity in Mass Customization: Concepts and Management. Berlin: Erich Schmidt Verlag GmbH and Co KG.
  • Bangsow, S. 2016. Tecnomatix Plant Simulation. Cham: Springer International Publishing. doi:10.1007/978-3-319-19503-2.
  • Barratt, M., T. Y. Choi, and M. Li. 2011. “Qualitative Case Studies in Operations Management: Trends, Research Outcomes, and Future Research Implications.” Journal of Operations Management 29 (4):329–342. doi:10.1016/j.jom.2010.06.002.
  • Bechte, W. 1988. “Theory and Practice of Load-Oriented Manufacturing Control.” International Journal of Production Research 26 (3):375–395. doi:10.1080/00207548808947871.
  • Bechte, W. 1994. “Load-Oriented Manufacturing Control Just-in-Time Production for Job Shops.” Production Planning and Control 5 (3):292–307. doi:10.1080/09537289408919499.
  • Ben-Daya, M., E. Hassini, and Z. Bahroun. 2017. “Internet of Things and Supply Chain Management: A Literature Review.” International Journal of Production Research, Advance Online Publication. doi:10.1080/00207543.2017.1402140.
  • Bergamaschi, D., R. Cigolini, M. Perona, and A. Portioli. 1997. “Order Review and Release Strategies in a Job Shop Environment: A Review and a Classification.” International Journal of Production Research 35 (2):399–420. doi:10.1080/002075497195821.
  • Blanc, P., I. Demongodin, and P. Castagna. 2008. “A Holonic Approach for Manufacturing Execution System Design: An Industrial Application.” Engineering Applications of Artificial Intelligence 21 (3):315–330. doi:10.1016/j.engappai.2008.01.007.
  • Bonoma, T. V. 1985. “Case Research in Marketing: Opportunities, Problems, and a Process.” Journal of Marketing Research 22 (2):199–208. doi:10.2307/3151365.
  • Bozarth, C. C., D. P. Warsing, B. B. Flynn, and E. J. Flynn. 2009. “The Impact of Supply Chain Complexity on Manufacturing Plant Performance.” Journal of Operations Management 27 (1):78–93. doi:10.1016/j.jom.2008.07.003.
  • Breithaupt, J.-W., M. J. Land, and P. Nyhuis. 2002. “The Workload Control Concept: Theory and Practical Extensions of Load Oriented Order Release.” Production Planning and Control 13 (7):625–638. doi:10.1080/0953728021000026230.
  • Chan, F. T. S., R. Bhagwat, and H. K. Chan. 2014. “The Effect of Responsiveness of the Control-Decision System to the Performance of FMS.” Computers and Industrial Engineering 72:32–42. doi:10.1016/j.cie.2014.03.003.
  • Ellis, S., H. D. Morris, and J. Santagate. 2015. “IoT-Enabled Analytic Applications Revolutionize Supply Chain Planning and Execution.” International Data Corporation (IDC) White Paper. https://www.savi.com/wp-content/uploads/IDC-IoT-enabled-analytics-applications_final.pdf
  • Fernandes, N. O., and S. Carmo-Silva. 2011. “Workload Control under Continuous Order Release.” International Journal of Production Economics 131 (1):257–62. doi:10.1016/j.ijpe.2010.09.026.
  • Fredendall, L. D., D. Ojha, and J. Wayne Patterson. 2010. “Concerning the Theory of Workload Control.” European Journal of Operational Research 201 (1):99–111. doi:10.1016/j.ejor.2009.02.003.
  • Gwon, S-h., S.-C. Oh, N. Huang, and S-K Hong. 2011. “Advanced RFID Application for a Mixed-Product Assembly Line.” The International Journal of Advanced Manufacturing Technology 56 (1–4):377–386. doi:10.1007/s00170-011-3155-3.
  • Hendry, L. C., and B. G. Kingsman. 1991. “A Decision Support System for Job Release in Make‐to‐Order Companies.” International Journal of Operations and Production Management 11 (6):6–16. doi:10.1108/01443579110144655.
  • Hendry, L. C., B. G. Kingsman, and P. Cheung. 1998. “The Effect of Workload Control (WLC) on Performance in Make-to-Order Companies.” Journal of Operations Management 16 (1):63–75. doi:http://dx.doi.org/10.1016/S0272-6963(97)00011-9.
  • Hendry, L. C., Y. Huang, and M. Stevenson. 2013. “Workload Control: Successful Implementation Taking.” International Journal of Operations and Production Management 33 (1):69–103. doi:10.1108/01443571311288057.
  • Henrich, P., M. J. Land, and G. J. C. Gaalman. 2004. “Exploring Applicability of the Workload Control Concept.” International Journal of Production Economics 90 (2):187–198. doi:10.1016/S0925-5273(03)00126-9.
  • Hopp, W. J., and M. L. Spearman. 2004. “To Pull or Not to Pull: What Is the Question?” Manufacturing and Service Operations Management 6 (2):133–148. doi:10.1287/msom.1030.0028.
  • Hopp, W. J., and M. L. Spearman. 2011. Factory Physics. 3rd ed. Illinois: Waveland Press.
  • Hu, S. J. 2013. “Evolving Paradigms of Manufacturing: From Mass Production to Mass Customization and Personalization.” Procedia CIRP 7:3–8. doi:10.1016/j.procir.2013.05.002.
  • Hu, S. J., X. Zhu, H. Wang, and Y. Koren. 2008. “Product Variety and Manufacturing Complexity in Assembly Systems and Supply Chains.” CIRP Annals 57 (1):45–48. doi:10.1016/j.cirp.2008.03.138.
  • Huang, G. Q., Y. F. Zhang, and P. Y. Jiang. 2008. “RFID-Based Wireless Manufacturing for Real-Time Management of Job Shop WIP Inventories.” The International Journal of Advanced Manufacturing Technology 36 (7–8):752–764. doi:10.1007/s00170-006-0897-4.
  • Johnston, W. J., M. P. Leach, and A. H. Liu. 1999. “Theory Testing Using Case Studies in Business-to-Business Research.” Industrial Marketing Management 28 (3):201–213. doi:10.1016/S0019-8501(98)00040-6.
  • Kingsman, B. G. 2000. “Modelling Input-Output Workload Control for Dynamic Capacity Planning in Production Planning Systems.” International Journal of Production Economics 68 (1):73–93. doi:10.1016/S0925-5273(00)00037-2.
  • Kingsman, B. G., and L. C. Hendry. 2002. “The Relative Contributions of Input and Output Controls on the Performance of a Workload Control System in Make-to-Order Companies.” Production Planning and Control 13 (7):579–590. doi:10.1080/0953728021000026285.
  • Kingsman, B. G., I. P. Tatsiopoulos, and L. C. Hendry. 1989. “A Structural Methodology for Managing Manufacturing Lead Times in Make-to-Order Companies.” European Journal of Operational Research 40 (2):196–209. doi:10.1016/0377-2217(89)90330-5.
  • Kingsman, B. G., L. C. Hendry, A. Mercer, and A. De Souza. 1996. “Responding to Customer Enquiries in Make-to-Order Companies Problems and Solutions.” International Journal of Production Economics 46–47:219–231. doi:10.1016/0925-5273(95)00199-9.
  • Kritchanchai, D., and B. L. MacCarthy. 1999. “Responsiveness of the Order Fulfilment Process.” International Journal of Operations and Production Management 19 (8):812–833. doi:10.1108/01443579910274419.
  • Land, M. J. 2004. “Workload Control in Job Shops: Grasping the Tap.” PhD diss., University of Groningen.
  • Land, M. J., and G. Gaalman. 1996. “Workload Control Concepts in Job Shops a Critical Assessment.” International Journal of Production Economics 46–47:535–548. doi:10.1016/S0925-5273(96)00088-6.
  • Land, M. J., and G. J. C. Gaalman. 2009. “Production Planning and Control in SMEs: Time for Change.” Production Planning and Control 20 (7):548–558. doi:10.1080/09537280903034230.
  • Land, M. J., M. Stevenson, M. Thürer, and G. J. C. Gaalman. 2015. “Job Shop Control: In Search of the Key to Delivery Improvements.” International Journal of Production Economics 168:257–266. doi:10.1016/j.ijpe.2015.07.007.
  • Makris, S., G. Michalos, and G. Chryssolouris. 2012. “RFID Driven Robotic Assembly for Random Mix Manufacturing.” Robotics and Computer-Integrated Manufacturing 28 (3):359–365. doi:10.1016/j.rcim.2011.10.007.
  • Matson, J. B., and D. C. McFarlane. 1999. “Assessing the Responsiveness of Existing Production Operations.” International Journal of Operations and Production Management 19 (8):765–784. doi:10.1108/01443579910274374.
  • Michalos, G., P. Sipsas, S. Makris, and G. Chryssolouris. 2016. “Decision Making Logic for Flexible Assembly Lines Reconfiguration.” Robotics and Computer-Integrated Manufacturing 37:233–250. doi:10.1016/j.rcim.2015.04.006.
  • Moreira, M. R. A., and RaFS. Alves. 2009. “A Methodology for Planning and Controlling Workload in a Job-Shop: A Four-Way Decision-Making Problem.” International Journal of Production Research 47 (10):2805–2821. doi:10.1080/00207540701725083.
  • Oosterman, B., M. J. Land, and G. J. C. Gaalman. 2000. “The Influence of Shop Characteristics on Workload Control.” International Journal of Production Economics 68 (1):107–119. doi:10.1016/S0925-5273(99)00141-3.
  • Peng, D., R. Schroeder, and R. Shah. 2008. “Linking Routines to Operations Capabilities: A New Perspective.” Journal of Operations Management 26 (6):730–748. doi:10.1016/J.JOM.2007.11.001.
  • Philipoom, P. R., and T. D. Fry. 1992. “Capacity-Based Order Review/Release Strategies to Improve Manufacturing Performance.” International Journal of Production Research 30 (11):2559–2572. doi:10.1080/00207549208948176.
  • Pujawan, I. N., and A. U. Smart. 2012. “Factors Affecting Schedule Instability in Manufacturing Companies.” International Journal of Production Research 50 (8):2252–2266. doi:10.1080/00207543.2011.575095.
  • Ragatz, G. L., and V. A. Mabert. 1988. “An Evaluation of Order Release Mechanisms in a Job-Shop Environment.” Decision Sciences 19 (1):167–189. doi:10.1111/j.1540-5915.1988.tb00260.x.
  • Ramirez-Campos, S., L. T. Trevino, M. Cedillo Campos, and J. Leza. 2006. “Assembly Line Reconfiguration Under Disturbances: An Evolutionary Approach to Decision Making.” In 15th International Conference on Computing. 24–32. Mexico City: IEEE. doi:10.1109/CIC.2006.27.
  • Raturi, A. S., and E. P. Jack. 2004. “Creating a Volume-Flexible Firm.” Business Horizons 47 (6):69–78. doi:10.1016/j.bushor.2004.09.010.
  • Riezebos, J., G. J. Korte, and M. J. Land. 2003. “Improving a Practical DBR Buffering Approach Using Workload Control.” International Journal of Production Research 41 (4):699–712. doi:10.1080/0020754031000065485.
  • Ross, J., and B. M. Staw. 1993. “Organizational Escalation and Exit: Lessons from the Shoreham Nuclear Power Plant.” Academy of Management Journal 36 (4):701–732. doi:10.5465/256756.
  • Ruiz-Torres, A. J., and F. Mahmoodi. 2007. “Impact of Worker and Shop Flexibility on Assembly Cells.” International Journal of Production Research 45 (6):1369–1388. doi:10.1080/00207540600690727.
  • Saenz de Ugarte, B., A. Artiba, and R. Pellerin. 2009. “Manufacturing Execution System – A Literature Review.” Production Planning and Control 20 (6):525–539. doi:10.1080/09537280902938613.
  • Shafer, S. M., and T. L. Smunt. 2004. “Empirical Simulation Studies in Operations Management: Context, Trends, and Research Opportunities.” Journal of Operations Management 22 (4):345–354. doi:10.1016/j.jom.2004.05.002.
  • Stevenson, M. 2006. “Refining a Workload Control (WLC) Concept: A Case Study.” International Journal of Production Research 44 (4):767–790. doi:10.1080/00207540500338070.
  • Stevenson, M., and L. C. Hendry. 2006. “Aggregate Load-Oriented Workload Control: A Review and a Re-Classification of a Key Approach.” International Journal of Production Economics 104 (2):676–693. doi:10.1016/j.ijpe.2005.05.022.
  • Stevenson, M., L. C. Hendry, and B. G. Kingsman †. 2005. “A Review of Production Planning and Control: The Applicability of Key Concepts to the Make-to-Order Industry.” International Journal of Production Research 43 (5):869–898. doi:10.1080/0020754042000298520.
  • Teece, D. J., G. Pisano, and A. Shuen. 1997. “Dynamic Capabilities and Strategic Management.” Strategic Management Journal 18 (7):509–533.
  • Thürer, M., C. Silva, and M. Stevenson. 2010. “Workload Control Release Mechanisms: From Practice Back to Theory Building.” International Journal of Production Research 48 (12):3593–3617. doi:10.1080/00207540902922810.
  • Thürer, M., M. J. Land, M. Stevenson, L. D. Fredendall, and M. Godinho Filho. 2015. “Concerning Workload Control and Order Release: The Pre-Shop Pool Sequencing Decision.” Production and Operations Management 24 (7):1179–1192. doi:10.1111/poms.12304.
  • Thürer, M., M. Stevenson, and C. Silva. 2011. “Three Decades of Workload Control Research: A Systematic Review of the Literature.” International Journal of Production Research 49 (23):6905–6935. doi:10.1080/00207543.2010.519000.
  • Thürer, M., M. Stevenson, and M. J. Land. 2016. “On the Integration of Input and Output Control: Workload Control Order Release.” International Journal of Production Economics 174:43–53. (April): doi:10.1016/j.ijpe.2016.01.005.
  • Thürer, M., M. Stevenson, and T. Qu. 2015. “Simple Subcontracting Rules for Make-to-Order Shops with Limited Subcontractor Capacity: An Assessment by Simulation.” Production Planning and Control 26 (13):1145–1161. doi:10.1080/09537287.2015.1019590.
  • Thürer, M., M. Stevenson, C. Silva, and M. Land. 2013. “Towards an Integrated Workload Control (WLC) Concept: The Performance of Due Date Setting Rules in Job Shops with Contingent Orders.” International Journal of Production Research 51 (15):4502–4516. doi:10.1080/00207543.2013.774485.
  • Thürer, M., M. Stevenson, C. Silva, M. J. Land, and L. D. Fredendall. 2012. “Workload Control and Order Release: A Lean Solution for Make-to-Order Companies.” Production and Operations Management 21 (5):939–953. doi:10.1111/j.1937-5956.2011.01307.x.
  • Thürer, M., M. Stevenson, T. Qu, and M. Godinho Filho. 2014. “The Design of Simple Subcontracting Rules for Make-to-Order Shops: An Assessment by Simulation.” European Journal of Operational Research 239 (3):854–864. doi:10.1016/j.ejor.2014.06.018.
  • van Kampen, T. J. D. P., van Donk, and D. J. van der Zee. 2010. “Safety Stock or Safety Lead Time: Coping with Unreliability in Demand and Supply.” International Journal of Production Research 48 (24):7463–7481. doi:10.1080/00207540903348346.
  • Wang, J., Z. Luo, and E. C. Wong. 2010. “RFID-Enabled Tracking in Flexible Assembly Line.” The International Journal of Advanced Manufacturing Technology 46 (1–4):351–360. doi:10.1007/s00170-009-2102-z.
  • Xu, L. D., E. L. Xu, and L. Li. 2018. “Industry 4.0: State of the Art and Future Trends.” International Journal of Production Research 56 (8):2941–2962. doi:10.1080/00207543.2018.1444806.
  • Yan, H., M. Stevenson, L. C. Hendry, and M. J. Land. 2016. “Load-Oriented Order Release (LOOR) Revisited: Bringing It Back to the State of the Art.” Production Planning and Control 27 (13):1078–1091. doi:10.1080/09537287.2016.1183831.
  • Yin, R. K. 2009. Case study research: Design and methods. 4th ed. Thousand Oaks: Sage Publications.
  • Zhang, Y., G. Zhang, J. Wang, S. Sun, S. Si, and T. Yang. 2015. “Real-Time Information Capturing and Integration Framework of the Internet of Manufacturing Things.” International Journal of Computer Integrated Manufacturing 28 (8):811–822. doi:10.1080/0951192X.2014.900874.
  • Zhong, R. Y., Q. Y. Dai, T. Qu, G. J. Hu, and G. Q. Huang. 2013. “RFID-Enabled Real-Time Manufacturing Execution System for Mass-Customization Production.” Robotics and Computer-Integrated Manufacturing 29 (2):283–292. doi:10.1016/j.rcim.2012.08.001.
  • Zhong, R. Y., Z. Li, L. Y. Pang, Y. Pan, T. Qu, and G. Q. Huang. 2013. “RFID-Enabled Real-Time Advanced Planning and Scheduling Shell for Production Decision Making.” International Journal of Computer Integrated Manufacturing 26 (7):649–662. doi:10.1080/0951192X.2012.749532.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.