930
Views
21
CrossRef citations to date
0
Altmetric
Original Articles

Bi-objective multi-resource scheduling problem for emergency relief operations

ORCID Icon, & ORCID Icon
Pages 1191-1206 | Received 30 Mar 2016, Accepted 13 Mar 2018, Published online: 24 Jan 2019

References

  • Abounacer, R., M. Rekik, and J. Renaud. 2014. “An Exact Solution Approach for Multi-Objective Location–Transportation Problem for Disaster Response.” Computers & Operations Research 41 (0):83–93.
  • Adams, L. M. 2009. “Exploring the Concept of Surge Capacity.” Online Journal of Issues in Nursing 14 (2). DOI: 10.3912/OJIN.Vol14No02PPT03
  • Afshar, A., and A. Haghani. 2012. “Modeling Integrated Supply Chain Logistics in Real-Time Large-Scale Disaster Relief Operations.” Socio-Economic Planning Sciences 46 (4):327–38.
  • Aït-Kadi, D., J. B. Menye, and H. Kane. 2010. “Resources Assignment Model in Maintenance Activities Scheduling.” International Journal of Production Research 49 (22):6677–89.
  • Akpan, E. O. P. 2000. “Resource Smoothing: A Cost Minimization Approach.” Production Planning & Control 11 (8):775–80.
  • Allahverdi, A., C. T. Ng, T. C. E. Cheng, and M. Y. Kovalyov. 2008. “A Survey of Scheduling Problems with Setup Times or Costs.” European Journal of Operational Research 187 (3):985–1032.
  • Aringhieri, R., M. E. Bruni, S. Khodaparasti, and J. T. van Essen. 2017. “Emergency Medical Services and beyond: Addressing New Challenges through a Wide Literature Review.” Computers & Operations Research 78:349–68.
  • Artigues, C., and O. Roubellat. 2002. “An Efficient Algorithm for Operation Insertion in a Multi-Resource Job-Shop Schedule with Sequence-Dependent Setup Times.” Production Planning & Control 13 (2):175–86.
  • Bachlaus, M., M. K. Tiwari, and F. T. S. Chan. 2009. “Multi-Objective Resource Assignment Problem in a Product-Driven Supply Chain Using a Taguchi-Based DNA Algorithm.” International Journal of Production Research 47 (9):2345–71.
  • Bektas, T. 2006. “The Multiple Traveling Salesman Problem: An Overview of Formulations and Solution Procedures.” Omega 34 (3):209–19.
  • Bodaghi, B., and E. Palaneeswaran. 2016. An optimization model for scheduling emergency operations with multiple teams. Paper presented at the Proceedings of the International Conference on Industrial Engineering and Operations Management, Detroit, Michigan.
  • Bozorgi-Amiri, A., M. S. Jabalameli, and S. M. J. Mirzapour Al-e-Hashem. 2013. “A Multi-Objective Robust Stochastic Programming Model for Disaster Relief Logistics under Uncertainty.” OR Spectrum 35 (4):905–33.
  • Brucker, P., A. Drexl, R. Möhring, K. Neumann, and E. Pesch. 1999. “Resource-Constrained Project Scheduling: Notation, Classification, Models, and Methods.” European Journal of Operational Research 112 (1):3–41.
  • Cakici, E., and S. J. Mason. 2007. “Parallel Machine Scheduling Subject to Auxiliary Resource Constraints.” Production Planning & Control 18 (3):217–25.
  • Campbell, A. M., D. Vandenbussche, and W. Hermann. 2008. “Routing for Relief Efforts.” Transportation Science 42 (2):127–45.
  • Caunhye, A. M., X. Nie, and S. Pokharel. 2012. “Optimization Models in Emergency Logistics: A Literature Review.” Socio-Economic Planning Sciences 46 (1):4–13.
  • Celano, G., A. Costa, and S. Fichera. 2008. “Scheduling of Unrelated Parallel Manufacturing Cells with Limited Human Resources.” International Journal of Production Research 46 (2):405–27.
  • Chan, F. T. S., T. C. Wong, and L. Y. Chan. 2006. “Flexible Job-Shop Scheduling Problem under Resource Constraints.” International Journal of Production Research 44 (11):2071–89.
  • Depuy, G. W., and G. E. Whitehouse. 2001. “A Simple and Effective Heuristic for the Resource Constrained Project Scheduling Problem.” International Journal of Production Research 39 (14):3275–87.
  • Eckstein, A. L. H., and T. R. Rohleder. 1998. “Incorporating Human Resources in Group Technology/Cellular Manufacturing.” International Journal of Production Research 36 (5):1199–222.
  • Ehrgott, M., and X. Gandibleux. 2000. “A Survey and Annotated Bibliography of Multiobjective Combinatorial Optimization.” OR-Spektrum 22 (4):425–60.
  • Falasca, M., and C. Zobel. 2012. “An Optimization Model for Volunteer Assignments in Humanitarian Organizations.” Socio-Economic Planning Sciences 46 (4):250–60.
  • Gutjahr, W. J., and N. Dzubur. 2016. “Bi-Objective Bilevel Optimization of Distribution Center Locations considering User Equilibria.” Transportation Research Part E: Logistics and Transportation Review 85:1–22.
  • Haghani, A., and S.-C. Oh. 1996. “Formulation and Solution of a Multi-Commodity, Multi-Modal Network Flow Model for Disaster Relief Operations.” Transportation Research Part A: Policy and Practice 30 (3):231–50. doi:
  • Hartmann, S., and D. Briskorn. 2010. “A Survey of Variants and Extensions of the Resource-Constrained Project Scheduling Problem.” European Journal of Operational Research 207 (1):1–14.
  • Hwang, N.-C. R., and K. Kogan. 2003. “Dynamic Approach to Human Resources Planning for Major Professional Companies with a Peak-Wise Demand.” International Journal of Production Research 41 (6):1255–71.
  • Jotshi, A., Q. Gong, and R. Batta. 2009. “Dispatching and Routing of Emergency Vehicles in Disaster Mitigation Using Data Fusion.” Socio-Economic Planning Sciences 43 (1):1–24.
  • Karsu, Ö., and M. Azizoğlu. 2012. “The Multi-Resource Agent Bottleneck Generalised Assignment Problem.” International Journal of Production Research 50 (2):309–24.
  • Katz, A., A. B. Staiti, and K. L. McKenzie. 2006. “Preparing for the Unknown, Responding to the Known: Communities and Public Health Preparedness.” Health Affairs (Project Hope) 25 (4):946–57.
  • Klein, R. 2000. “Project Scheduling with Time-Varying Resource Constraints.” International Journal of Production Research 38 (16):3937–52.
  • Laporte, G. 2010. “A Concise Guide to the Traveling Salesman Problem.” Journal of the Operational Research Society 61 (1):35–40.
  • Lassiter, K., A. Khademi, and K. M. Taaffe. 2015. “A Robust Optimization Approach to Volunteer Management in Humanitarian Crises.” International Journal of Production Economics 163:97–111.
  • Lee, C.-Y., and L. Lei. 2001. “Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases.” Annals of Operations Research 102 (1/4):287–307.
  • Lee, K., L. Lei, M. Pinedo, and S. Wang. 2013. “Operations Scheduling with Multiple Resources and Transportation Considerations.” International Journal of Production Research 51 (23–24):7071–90.
  • Lei, L., M. Pinedo, L. Qi, S. Wang, and J. Yang. 2015. “Personnel Scheduling and Supplies Provisioning in Emergency Relief Operations.” Annals of Operations Research 235 (1):1–29.
  • McHugh, M. D. 2010. “Hospital Nurse Staffing and Public Health Emergency Preparedness: Implications for Policy.” Public Health Nursing 27 (5):442–9.
  • Najafi, M., K. Eshghi, and W. Dullaert. 2013. “A Multi-Objective Robust Optimization Model for Logistics Planning in the Earthquake Response Phase.” Transportation Research Part E: Logistics and Transportation Review 49 (1):217–49.
  • Oran, A., K. C. Tan, B. H. Ooi, M. Sim, and P. Jaillet. 2012. "Location and Routing Models for Emergency Response Plans with Priorities." In Future Security: 7th Security Research Conference, Future Security 2012, Bonn, Germany, September 4–6, 2012. Proceedings, edited by Nils Aschenbruck, Peter Martini, Michael Meier, and Jens Tölle, 129–40. Berlin, Heidelberg: Springer Berlin Heidelberg.
  • Özdamar, L., and O. Demir. 2012. “A Hierarchical Clustering and Routing Procedure for Large Scale Disaster Relief Logistics Planning.” Transportation Research Part E: Logistics and Transportation Review 48 (3):591–602.
  • Özdamar, L., E. Ekinci, and B. Küçükyazici. 2004. “Emergency Logistics Planning in Natural Disasters.” Annals of Operations Research 129 (1–4):217–45.
  • Przybylski, A., X. Gandibleux, and M. Ehrgott. 2008. “Two Phase Algorithms for the Bi-objective Assignment Problem.” European Journal of Operational Research 185 (2):509–33.
  • Raith, A., and M. Ehrgott. 2009. “A Two-Phase Algorithm for the Biobjective Integer Minimum Cost Flow Problem.” Computers & Operations Research 36 (6):1945–54.
  • Rath, S., M. Gendreau, and J. G. Walter. 2015. “Bi-objective Stochastic Programming Models for Determining Depot Locations in Disaster Relief Operations.” International Transactions in Operational Research 23 (6):997–1023.
  • Robinson, K. R., and S. A. Moses. 2006. “Effect of Granularity of Resource Availability on the Accuracy of Due Date Assignment.” International Journal of Production Research 44 (24):5391–414.
  • Rolland, E., R. A. Patterson, K. Ward, and B. Dodin. 2010. “Decision Support for Disaster Management.” Operations Management Research 3 (1–2):68–79.
  • Sahin, H., B. Y. Kara, and O. E. Karasan. 2016. “Debris Removal during Disaster Response: A Case for Turkey.” Socio-Economic Planning Sciences 53:49–59.
  • Schryen, G., G. Rauchecker, and T. Comes. 2015. “Resource Planning in Disaster Response.” Review of Business & Information Systems Engineering 57 (4):243–59.
  • Sheu, J.-B. 2007. “An Emergency Logistics Distribution Approach for Quick Response to Urgent Relief Demand in Disasters.” Transportation Research Part E: Logistics and Transportation Review 43 (6):687–709.
  • Talarico, L., F. Meisel, and K. Sörensen. 2015. “Ambulance Routing for Disaster Response with Patient Groups.” Computers & Operations Research 56:120–33.
  • Tormos, P., and A. Lova. 2003. “An Efficient Multi-Pass Heuristic for Project Scheduling with Constrained Resources.” International Journal of Production Research 41 (5):1071–86.
  • Tzeng, G.-H., H.-J. Cheng, and T. D. Huang. 2007. “Multi-Objective Optimal Planning for Designing Relief Delivery Systems.” Transportation Research Part E: Logistics and Transportation Review 43 (6):673–86.
  • Ulungu, E. L., and J. Teghem. 1995. “The Two Phases Method: An Efficient Procedure to Solve Bi-objective Combinatorial Optimization Problems.” Foundations of Computing and Decision Sciences 20 (2):149–65.
  • Van De Vonder, S., E. Demeulemeester, W. Herroelen, and R. Leus. 2006. “The Trade-off between Stability and Makespan in Resource-Constrained Project Scheduling.” International Journal of Production Research 44 (2):215–36.
  • Wang, H., L. Du, and S. Ma. 2014. “Multi-Objective Open Location-Routing Model with Split Delivery for Optimized Relief Distribution in Post-Earthquake.” Transportation Research Part E: Logistics and Transportation Review 69:160–79.
  • Wex, F., G. Schryen, S. Feuerriegel, and D. Neumann. 2014. “Emergency Response in Natural Disaster Management: Allocation and Scheduling of Rescue Units.” European Journal of Operational Research 235 (3):697–708.
  • Wong, C. S., F. T. S. Chan, and S. H. Chung. 2013. “A Joint Production Scheduling Approach considering Multiple Resources and Preventive Maintenance Tasks.” International Journal of Production Research 51 (3):883–96.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.