Publication Cover
Production Planning & Control
The Management of Operations
Volume 32, 2021 - Issue 10
835
Views
1
CrossRef citations to date
0
Altmetric
Original Articles

Combining an automatic material handling system with lean production to improve outgoing quality assurance in a semiconductor foundry

, &
Pages 829-844 | Received 19 Aug 2017, Accepted 08 May 2020, Published online: 25 May 2020

References

  • Abdulmalek, F. A., and J. Rajgopal. 2007. “Analyzing the Benefits of Lean Manufacturing and Value Stream Mapping via Simulation: A Process Sector Case Study.” International Journal of Production Economics 107 (1): 223–236. doi:10.1016/j.ijpe.2006.09.009.
  • Ahmad, R., C. Masse, S. Jituri, J. Doucette, and P. Mertiny. 2018. “Alberta Learning Factory for Training Reconfigurable Assembly Process Value Stream Mapping.” Procedia Manufacturing 23: 237–242. doi:10.1016/j.promfg.2018.04.023.
  • Alves, T., I. Tommelein, and G. Ballard. 2005. Value stream mapping for make-to-order products in a job shop environment. Construction Research Congress 2005, San Diego, CA, 1–10. doi:10.1061/40754(183)2.
  • Bartlett, K., J. Lee, S. Ahmed, G. Nemhauser, J. Sokol, and B. Na. 2014. “Congestion-Aware Dynamic Routing in Automated Material Handling Systems.” Computers & Industrial Engineering 70: 176–182. doi:10.1016/j.cie.2014.02.002.
  • Belhadi, A., F. E. Touriki, and S. El Fezazi. 2018. “Benefits of Adopting Lean Production on Green Performance of SMEs: A Case Study.” Production Planning & Control 29 (11): 873–894. doi:10.1080/09537287.2018.1490971.
  • Bellisario, A., and A. Pavlov. 2018. “Performance Management Practices in Lean Manufacturing Organizations: A Systematic Review of Research Evidence.” Production Planning & Control 29 (5): 367–385. doi:10.1080/09537287.2018.1432909.
  • Casali, A., and C. Ernst. 2012. “Discovering Correlated Parameters in Semiconductor Manufacturing Processes: A Data Mining Approach.” IEEE Transactions on Semiconductor Manufacturing 25 (1): 118–127. doi:10.1109/TSM.2011.2171375.
  • Chen, A., and A. Hong. 2010. “Sample-Efficient Regression Trees (SERT) for Semiconductor Yield Loss Analysis.” IEEE Transactions on Semiconductor Manufacturing 23 (3): 358–369. doi:10.1109/TSM.2010.2048968.
  • Chen, Y. J., C. Y. Fan, and K. H. Chang. 2016. “Manufacturing Intelligence for Reducing False Alarm of Defect Classification by Integrating Similarity Matching Approach in CMOS Image Sensor Manufacturing.” Computers & Industrial Engineering 99: 465–473. doi:10.1016/j.cie.2016.05.009.
  • Chien, C. F., K. H. Chang, and W. C. Wang. 2014. “An Empirical Study of Design-of-Experiment Data Mining for Yield-Loss Diagnosis for Semiconductor Manufacturing.” Journal of Intelligent Manufacturing 25 (5): 961–972. doi:10.1007/s10845-013-0791-5.
  • Chien, C. F., C. Y. Hsu, and P. N. Chen. 2013. “Semiconductor Fault Detection and Classification for Yield Enhancement and Manufacturing Intelligence.” Flexible Services and Manufacturing Journal 25 (3): 367–388. doi:10.1007/s10696-012-9161-4.
  • Chien, C.-F., S. Lin, and J.-C. Cheng. 2008. “Construct Fuzzy Decision Tree for Mining Interrelated Semiconductor Manufacturing Data for Yield Enhancement.” Journal of Quality 15 (3): 193–210.
  • Chien, C. F., W. C. Wang, and J. C. Cheng. 2007. “Data Mining for Yield Enhancement in Semiconductor Manufacturing and an Empirical Study.” Expert Systems with Applications 33 (1): 192–198. doi:10.1016/j.eswa.2006.04.014.
  • Chung, J. 2015. “Estimating Arrival Times of Transportation Jobs for Automated Material Handling in LCD Fabrication Facilities.” Journal of Manufacturing Systems 35: 112–119. doi:10.1016/j.jmsy.2014.11.017.
  • Cil, I., and Y. S. Turkan. 2013. “An ANP-Based Assessment Model for Lean Enterprise Transformation.” The International Journal of Advanced Manufacturing Technology 64 (5–8): 1113–1130. doi:10.1007/s00170-012-4047-x.
  • Cocca, P., F. Marciano, M. Alberti, and D. Schiavini. 2019. “Leanness Measurement Methods in Manufacturing Organisations: A Systematic Review.” International Journal of Production Research 57 (15–16): 5103–5118. doi:10.1080/00207543.2018.1521016.
  • Dai, W. B., V. N. Dubinin, J. H. Christensen, V. Vyatkin, and X. P. Guan. 2017. “Toward Self-Manageable and Adaptive Industrial Cyber-Physical Systems with Knowledge-Driven Autonomic Service Management.” IEEE Transactions on Industrial Informatics 13 (2): 725–736. doi:10.1109/TII.2016.2595401.
  • Datta, A. 1998. “Automating the Discovery of As-Is Business Process Models: Probabilistic and Algorithmic Approaches.” Information Systems Research 9 (3): 275–301. doi:10.1287/isre.9.3.275.
  • Demchuk, L., and R. Baitsar. 2015. “Combined Usage of Theory of Constraints, Lean and Six Sigma in Quality Assurance of Manufacturing Processes.” Key Engineering Materials 637: 21–26. doi:10.4028/www.scientific.net/KEM.637.21.
  • Dotoli, M., N. Epicoco, M. Falagario, N. Costantino, and B. Turchiano. 2015. “An Integrated Approach for Warehouse Analysis and Optimization: A Case Study.” Computers in Industry 70: 56–69. doi:10.1016/j.compind.2014.12.004.
  • Fischer, C., M. Lušić, F. Faltus, R. Hornfeck, and J. Franke. 2016. “Integrating Workers’ Feedback into Continuous Information Flows: Enabling Lean Quality Assurance by Worker Information Systems.” Advanced Materials Research 1140: 435–442. doi:10.4028/www.scientific.net/AMR.1140.435.
  • Garza-Reyes, J. A., J. T. Romero, K. Govindan, A. Cherrafi, and U. Ramanathan. 2018. “A PDCA-Based Approach to Environmental Value Stream Mapping (E-VSM).” Journal of Cleaner Production 180: 335–348. doi:10.1016/j.jclepro.2018.01.121.
  • Gollan, P. J., S. Kalfa, R. Agarwal, R. Green, and K. Randhawa. 2014. “Lean Manufacturing as a High-Performance Work System: The Case of Cochlear.” International Journal of Production Research 52 (21): 6434–6447. doi:10.1080/00207543.2014.940430.
  • Han, G. H., M. Dong, and X. F. Shao. 2011. “A Stochastic Dynamic Programming Approach-Based Yield Management with Substitution and Uncertainty in Semiconductor Manufacturing.” Computers & Mathematics with Applications 61 (4): 1241–1253. doi:10.1016/j.camwa.2011.01.003.
  • Hong, P., and Z. M. Leffakis. 2017. “Managing Demand Variability and Operational Effectiveness: Case of Lean Improvement Programmes and MRP Planning Integration.” Production Planning & Control 28 (13): 1066–1080. doi:10.1080/09537287.2017.1329956.
  • Hwang, I., and Y. J. Jang. 2020. “Q(Lambda) Learning-Based Dynamic Route Guidance Algorithm for Overhead Hoist Transport Systems in Semiconductor Fabs.” International Journal of Production Research 58 (4): 1199–1221. doi:10.1080/00207543.2019.1614692.
  • Hwang, I., Y. J. Jang, and H. Choi. 2018. “Overhead Shuttle Design for a Flat Panel Display Production Line Considering the Contactless Power Supply Capacity.” Computers & Industrial Engineering 126: 232–242. doi:10.1016/j.cie.2018.09.026.
  • Kelton, W. D., R. P. Sadowski, and N. B. Zupick. 2015. Simulation with Arena. 6th ed. New York, NY: McGraw-Hill Education.
  • Kim, H., D. E. Lim, and S. Lee. 2020. “Deep Learning-Based Dynamic Scheduling for Semiconductor Manufacturing with High Uncertainty of Automated Material Handling System Capability.” IEEE Transactions on Semiconductor Manufacturing 33 (1): 13–22. doi:10.1109/TSM.2020.2965293.
  • Kuo, C. H., and C. S. Huang. 2006. “Dispatching of Overhead Hoist Vehicles in a Fab Intrabay Using a Multimission-Oriented Controller.” The International Journal of Advanced Manufacturing Technology 27 (7–8): 824–832. doi:10.1007/s00170-004-2244-y.
  • Lee, J. H., and S. H. Ha. 2009. “Recognizing Yield Patterns through Hybrid Applications of Machine Learning Techniques.” Information Sciences 179 (6): 844–850. doi:10.1016/j.ins.2008.11.008.
  • Li, T. S., C. L. Huang, and Z. Y. Wu. 2006. “Data Mining Using Genetic Programming for Construction of a Semiconductor Manufacturing Yield Rate Prediction System.” Journal of Intelligent Manufacturing 17 (3): 355–361. doi:10.1007/s10845-005-0008-7.
  • Liao, D. Y., and C. N. Wang. 2004. “Neural-Network-Based Delivery Time Estimates for Prioritized 300-mm Automatic Material Handling Operations.” IEEE Transactions on Semiconductor Manufacturing 17 (3): 324–332. doi:10.1109/TSM.2004.831533.
  • Liao, D. Y., M. D. Jeng, and M. X. Zhou. 2007. “Application of Petri Nets and Lagrangian Relaxation to Scheduling Automatic Material-Handling Vehicles in 300-mm Semiconductor Manufacturing.” IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews) 37 (4): 504–516. doi:10.1109/TSMCC.2007.897321.
  • Liker, J. K., and D. Meier. 2006. The Toyota Way Field Book. New York, NY: McGraw‐Hill.
  • Lin, J. T., F. K. Wang, and P. Y. Yen. 2004. “The Maximum Loading and the Optimum Number of Vehicles in a Double-Loop of an Interbay Material Handling System.” Production Planning & Control 15 (3): 247–255. doi:10.1080/09537280410001688666.
  • Liu, Q. Q., H. L. Yang, and Y. C. Xin. 2020. “Applying Value Stream Mapping in an Unbalanced Production Line: A Case Study of a Chinese Food Processing Enterprise.” Quality Engineering 32 (1): 111–123. doi:10.1080/08982112.2019.1637526.
  • Lizarelli, F. L., and D. H. Alliprandini. 2020. “Comparative Analysis of Lean and Six Sigma Improvement Projects: Performance, Changes, Investment, Time and Complexity.” Total Quality Management & Business Excellence 31 (3–4): 407–428. doi:10.1080/14783363.2018.1428087.
  • Lokas, K. 2010. “Focus on Product Quality Key to Cutting Cycle Times.” Solid State Technology 53 (7): 30–32.
  • Meissner, A., M. Müller, A. Hermann, and J. Metternich. 2018. “Digitalization as a Catalyst for Lean Production: A Learning Factory Approach for Digital Shop Floor Management.” Procedia Manufacturing 23: 81–86. doi:10.1016/j.promfg.2018.03.165.
  • Monden, Y. 2011. Toyota Production System: An Integrated Approach to Just-in-Time. 4th ed. Boca Raton, FL: CRC Press.
  • Montoya-Torres, J. R. 2006. “A Literature Survey on the Design Approaches and Operational Issues of Automated Wafer-Transport Systems for Wafer Fabs.” Production Planning & Control 17 (7): 648–663. doi:10.1080/09537280600900774.
  • Na, B., J. E. Woo, and J. Lee. 2016. “Lifter Assignment Problem for Inter-Line Transfers in Semiconductor Manufacturing Facilities.” The International Journal of Advanced Manufacturing Technology 86 (5–8): 1615–1626. doi:10.1007/s00170-015-8327-0.
  • Nakata, K., R. Orihara, Y. Mizuoka, and K. Takagi. 2017. “A Comprehensive Big-Data-Based Monitoring System for Yield Enhancement in Semiconductor Manufacturing.” IEEE Transactions on Semiconductor Manufacturing 30 (4): 339–344. doi:10.1109/TSM.2017.2753251.
  • Negrao, L. L. L., M. Godinho, and G. Marodin. 2016. “Lean Practices and Their Effect on Performance: A Literature Review.” Production Planning & Control 28 (1): 33–56. doi:10.1080/09537287.2016.1231853.
  • Panwar, A., B. P. Nepal, R. Jain, and A. P. S. Rathore. 2015. “On the Adoption of Lean Manufacturing Principles in Process Industries.” Production Planning & Control 26 (7): 564–587. doi:10.1080/09537287.2014.936532.
  • Rebelo, M., G. Santos, and R. Silva. 2014. “Conception of a Flexible Integrator and Lean Model for Integrated Management Systems.” Total Quality Management & Business Excellence 25 (5–6): 683–701. doi:10.1080/14783363.2013.835616.
  • Rother, M., and J. Shook. 1999. Learning to See: Value Stream Mapping to Add Value and Eliminate Muda. Cambridge, MA: Lean Enterprise Institute.
  • Tenera, A., and L. C. Pinto. 2014. “A Lean Six Sigma (LSS) Project Management Improvement Model.” Procedia – Social and Behavioral Sciences 119: 912–920. doi:10.1016/j.sbspro.2014.03.102.
  • Tu, Y. M., C. W. Lu, and A. H. I. Lee. 2013. “AMHS Capacity Determination Model for Wafer Fabrication Based on Production Performance Optimization.” International Journal of Production Research 51 (18): 5520–5535. doi:10.1080/00207543.2013.784416.
  • Verrier, B., B. Rose, and E. Caillaud. 2016. “Lean and Green Strategy: The Lean and Green House and Maturity Deployment Model.” Journal of Cleaner Production 116: 150–156. doi:10.1016/j.jclepro.2015.12.022.
  • Vinodh, S., S. V. Kumar, and K. E. K. Vimal. 2014. “Implementing Lean Sigma in an Indian Rotary Switches Manufacturing Organisation.” Production Planning & Control 25 (4): 288–302. doi:10.1080/09537287.2012.684726.
  • Wahab, A. N. A., M. Mukhtar, and R. Sulaiman. 2013. “A Conceptual Model of Lean Manufacturing Dimensions.” Procedia Technology 11: 1292–1298. doi:10.1016/j.protcy.2013.12.327.
  • Wang, C. N. 2009. “The Heuristic Dispatching Method of Automatic Material Handling System in 300mm Semiconductor Fabrication.” International Journal of Innovative Computing Information and Control 5 (7): 1927–1935.
  • Wang, C. N., P. C. Chiu, I. F. Cheng, and Y. F. Huang. 2019. “Contamination Improvement of Touch Panel and Color Filter Production Processes of Lean Six Sigma.” Applied Sciences 9 (9): 1893. 1-21. doi:10.3390/app9091893.
  • Wang, C. N., Y. H. Lee, H. P. Hsu, and V. H. Dang. 2017. “The Heuristic Preemptive Dispatching Rule Using Stocker for Conveyor-Based Material Handling System of 450-mm Wafer Fabrication.” The International Journal of Advanced Manufacturing Technology 88 (5–8): 2179–2189. doi:10.1007/s00170-016-8908-6.
  • Wang, P. S., T. H. Yang, and L. C. Yu. 2018. “Lean-Pull Strategy for Order Scheduling Problem in a Multi-Site Semiconductor Crystal Ingot-Pulling Manufacturing Company.” Computers & Industrial Engineering 125: 545–562. doi:10.1016/j.cie.2018.03.043.
  • Weber, C. M. 2013. “Characterizing the Economic Value of Organizational Learning in Semiconductor Manufacturing.” IEEE Transactions on Semiconductor Manufacturing 26 (1): 42–52. doi:10.1109/TSM.2012.2212287.
  • Womack, J. P., and D. T. Jones. 2003. Lean Thinking: Banish Waste and Create Wealth in Your Corporation. New York, NY: Simon & Schuster.
  • Yang, J. T., C. M. Weber, and P. Gabella. 2013. “Enabling Collaborative Solutions across the Semiconductor Manufacturing Ecosystem.” IEEE Transactions on Semiconductor Manufacturing 26 (4): 465–475. doi:10.1109/TSM.2013.2258414.
  • Yang, T. H., Y. Y. Kuo, C. T. Su, and C. L. Hou. 2015. “Lean Production System Design for Fishing Net Manufacturing Using Lean Principles and Simulation Optimization.” Journal of Manufacturing Systems 34: 66–73. doi:10.1016/j.jmsy.2014.11.010.
  • Yang, T. H., Y. F. Wen, Z. R. Hsieh, and J. X. Zhang. 2020. “A Lean Production System Design for Semiconductor Crystal-Ingot Pulling Manufacturing Using Hybrid Taguchi Method and Simulation Optimization.” Assembly Automation 40 (3): 433–445. doi:10.1108/AA-11-2018-0193.
  • Zhou, B.-H., J.-X. Chen, and Z.-Q. Lu. 2016. “An Analytical Model for Continuous Flow Transporters of AMHSs with Multi-Loop Conveyors and Priority Rules.” International Journal of Computer Integrated Manufacturing 29 (5): 489–503. doi:10.1080/0951192X.2015.1070204.
  • Zhou, Q., and B. H. Zhou. 2016. “A Deadlock Recovery Strategy for Unified Automated Material Handling Systems in 300 mm Wafer Fabrications.” Computers in Industry 75: 1–12. doi:10.1016/j.compind.2015.10.014.
  • Zhu, X. Y., H. Zhang, and Z. G. Jiang. 2019. “Application of Green-Modified Value Stream Mapping to Integrate and Implement Lean and Green Practices: A Case Study.” International Journal of Computer Integrated Manufacturing, Online: 1–16. doi:10.1080/0951192X.2019.1667028.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.