References
- Bagni, G., M. Godinho Filho, M. Thürer, and M. Stevenson. 2020. “Systematic Review and Discussion of Production Control Systems That Emerged Between 1999 and 2018.” Production Planning & Control : 1–15. doi:https://doi.org/10.1080/09537287.2020.1742398.
- Bergamaschi, D., R. Cigolini, M. Perona, and A. Portioli. 1997. “Order Review and Release Strategies in a Job Shop Environment: A Review and a Classification.” International Journal of Production Research 35 (2): 399–420. doi: https://doi.org/10.1080/002075497195821.
- Bertolini, M., M. Braglia, M. Frosolini, and L. Marrazzini. 2020. “Work in Next Queue CONWIP.” Computers & Industrial Engineering 143: 106437. doi: https://doi.org/10.1016/j.cie.2020106437.
- Braglia, M., R. Gabbrielli, and L. Marrazzini. 2020. “Rolling Kanban: A New Visual Tool to Schedule Family Batch Manufacturing Processes with Kanban.” International Journal of Production Research 58 (13): 3998–4014. doi: https://doi.org/10.1080/00207543.2019.1639224.
- Buer, S. V., G. I. Fragapane, and J. O. Strandhagen. 2018. “The Data-Driven Process Improvement Cycle: Using Digitalization for Continuous Improvement.” IFAC-PapersOnLine 51 (11): 1035–1040. doi: https://doi.org/10.1016/j.ifacol.2018.08.471.
- Framinan, J. M., P. L. González, and R. R. Usano. 2003. “The CONWIP Production Control System: Review and Research Issues.” Production Planning & Control 14 (3): 255–265. doi: https://doi.org/10.1080/0953728031000102595.
- Fredendall, L. D., D. Ojha, and J. W. Patterson. 2010. “Concerning the Theory of Workload Control.” European Journal of Operational Research 201 (1): 99–111. doi: https://doi.org/10.1016/j.ejor.2009.02.003.
- Halinen, Aino, and Jan-Åke Törnroos. 2005. “Using Case Methods in the Study of Contemporary Business Networks.” Journal of Business Research 58 (9): 1285–1285. doi: https://doi.org/10.1016/j.jbusres.2004.02.001.
- Kingsman, B. G., I. P. Tatsiopoulos, and L. Hendry. 1989. “A Structural Methodology for Managing Manufacturing Lead Times in Make-to-Order Companies.” European Journal of Operational Research 40 (2): 196–209. doi: https://doi.org/10.1016/0377-2217(89)90330-5.
- Krishnamurthy, A., and R. Suri. 2009. “Planning and Implementing POLCA: A Card-Based Control System for High Variety or Custom Engineered Products.” Production Planning & Control 20 (7): 596–610. doi: https://doi.org/10.1080/09537280903034297
- Land, M. 2009. “Cobacabana (Control of Balance by Card-Based Navigation): A Card-Based System for Job Shop Control.” International Journal of Production Economics 117 (1): 97–103. doi: https://doi.org/10.1016/j.ijpe.2008.08.057
- Lane, G. 2007. Made-to-Order Lean. Excelling in a High-Mix, Low-Volume Environment. New York: Productivity Press.
- Matt, D. T. 2014. “Adaptation of the Value Stream Mapping Approach to the Design of Lean Engineer-to-Order Production Systems.” Journal of Manufacturing Technology Management 25 (3): 334– 350. doi: https://doi.org/10.1108/JMTM-05-2012-0054.
- Monden, Y. 1998. Toyota Production System: An Integrated Approach to Just-In-Time. Norcross: Engineering and Management Press.
- Ohno, T. 1988. Toyota Production System: Beyond Large-Scale Production. Boca Raton: CRC Press.
- Oosterman, B., M. Land, and G. Gaalman. 2000. “The Influence of Shop Characteristics on Workload Control.” International Journal of Production Economics 68 (1): 107–119. doi: https://doi.org/10.1016/S0925-5273(99)00141-3.
- Parry, G. C., and C. E. Turner. 2006. “Application of Lean Visual Process Management Tools.” Production Planning & Control 17 (1): 77–86. doi: https://doi.org/10.1080/09537280500414991.
- Prakash, J., and J. F. Chin. 2014. “Modified CONWIP Systems: A Review and Classification.” Production Planning & Control 26 (4): 1–307. doi: https://doi.org/10.1080/09537287.2014.898345.
- Riezebos, J. 2010. “Design of POLCA Material Control Systems.” International Journal of Production Research 48 (5): 1455–1477. doi: https://doi.org/10.1080/00207540802570677.
- Savino, M. M., and A. Mazza. 2015. “Kanban-Driven Parts Feeding Within a Semi-Automated O-Shaped Assembly Line: A Case Study in the Automotive Industry.” Assembly Automation 35 (1): 3–15. doi: https://doi.org/10.1108/AA-07-2014-068.
- Spearman, M. L., D. L. Woodruff, and W. Hopp. 1990. “CONWIP: A Pull Alternative to Kanban.” International Journal of Production Research 28 (5): 879–894. doi: https://doi.org/10.1080/00207549008942761.
- Stevenson, M., L. Hendry, and B. G. Kingsman. 2005. “A Review of Production Planning and Control: The Applicability of Key Concepts to the Make-to-Order Industry.” International Journal of Production Research 43 (5): 869–898. doi: https://doi.org/10.1080/0020754042000298520.
- Stray, V., N. B. Moe, and G. R. Bergersen. 2017. “Are Daily Stand-Up Meetings Valuable? A Survey of Developers in Software Teams.” International Conference on Agile Software Development, Cologne, May 22–26.
- Sugimori, Y., K. Kusunoki, F. Cho, and S. Uchikawa. 1977. “Toyota Production System and Kanban System Materialization of Just-in-Time and Respect-for-Human System.” International Journal of Production Research 15 (6): 553–564. doi: https://doi.org/10.1080/00207547708943149.
- Suri, R. 1998. Quick Response Manufacturing: A Companywide Approach to Reducing Lead Times. Portland: Productivity Press.
- Suri, R. 2018. The Practitioner’s Guide to POLCA: The Production Control System for High-Mix, Low-Volume and Custom Products. Boca Raton: CRC Press.
- Sweeney, K. D., D. C. Sweeney, and J. F. Campbell. 2019. “The Performance of Priority Dispatching Rules in a Complex Job Shop: A Study on the Upper Mississippi River.” International Journal of Production Economics 216: 154–172. doi: https://doi.org/10.1016/j.ijpe.2019.04.024.
- Thürer, M., M. Land, and M. Stevenson. 2014. “Card-Based Workload Control for Job Shops: Improving COBACABANA.” International Journal of Production Economics 147: 180–188. doi: https://doi.org/10.1016/j.ijpe.2013.09.015.
- Thürer, M., M. Land, M. Stevenson, and L. D. Fredendall. 2016. “Card Based Delivery Date Promising in High-Variety Manufacturing with Order Release Control.” International Journal of Production Economics 172: 19–30. doi: https://doi.org/10.1016/j.ijpe.2015.11.003.
- Thürer, M., M. Stevenson, and C. W. Protzman. 2016a. Card-Based Control Systems for a Lean Work Design: The Fundamentals of Kanban, ConWIP, POLCA and COBACABANA. Boca Raton: Productivity Press.
- Thürer, M., M. Stevenson, and C. W. Protzman. 2016b. “Card-Based Production Control: A Review of the Control Mechanisms Underpinning Kanban, ConWIP, POLCA and COBACABANA Systems.” Production Planning & Control 27 (14): 1143–1157. doi:https://doi.org/10.1080/09537287.2016.1188224.
- Thürer, M., M. Stevenson, C. Silva, M. Land, and L. Fredendall. 2012. “Workload Control (WLC) and Order Release: A Lean Solution for Make-to-Order Companies.” Production & Operations Management 21 (5): 939–953. doi:https://doi.org/10.1111/j.1937-5956.2011.01307.x.
- Thürer, M., N. O. Fernandes, and M. Stevenson. 2020. “Material Flow Control in High-Variety Make-to-Order Shops: Combining COBACABANA and POLCA.” Production and Operations Management 29 (9): 2138–2152. doi:https://doi.org/10.1111/poms.13218.
- Thürer, M., N. O. Fernandes, M. Stevenson, T. Qu, and C. D. Li. 2019. “Centralised vs. decentralised Control Decision in Card-Based Control Systems: Comparing Kanban Systems and COBACABANA.” International Journal of Production Research 57 (2): 322–337. doi: https://doi.org/10.1080/00207543.2018.1425018.
- Yin, R. K. 1984. Case Study Research: Design and Methods. Beverly Hills, CA: Sage Publications.