Publication Cover
Production Planning & Control
The Management of Operations
Volume 34, 2023 - Issue 1
1,339
Views
7
CrossRef citations to date
0
Altmetric
Articles

Barriers to lean implementation in engineer-to-order manufacturing with subsequent assembly on-site: state of the art and future directions

&
Pages 91-115 | Received 03 Jul 2020, Accepted 06 Feb 2021, Published online: 23 Feb 2021

References

  • Abu, F., H. Gholami, M. Z. Mat Saman, N. Zakuan, and D. Streimikiene. 2019. “The Implementation of Lean Manufacturing in the Furniture Industry: A Review and Analysis on the Motives, Barriers, Challenges, and the Applications.” Journal of Cleaner Production 234: 660–680. doi:10.1016/j.jclepro.2019.06.279.
  • Aghimien, D., A. Oke, C. Aigbavboa, and C. Musenga. 2019. “Drivers of Sustainable Construction Practices in the Zambian Construction Industry.” Energy Procedia 158 (1): 3246–3252. doi:10.1016/j.egypro.2019.01.995.
  • Alfnes, E., M. K. Thomassen, and E. Gran. 2016. “A Framework for Lean Flow in Turbulent High-Variety Low-Volume Manufacturing Environments.” IFIP Advances in Information and Communication Technology 488: 935–942. doi:10.1007/978-3-319-51133-7_110.
  • Amaro, P., A. C. Alves, and R. M. Sousa. 2019. “Lean Thinking: A Transversal and Global Management Philosophy to Achieve Sustainability Benefit.” Lean Engineering for Global Development Springer International Publishing. doi:10.1007/978-3-030-13515-7.
  • American Institute of Architects. 2007. “Integrated Project Delivery: A Guide”. http://www.aia.org/groups/aia/documents/pdf/aiab083423.pdf.
  • Amrani, A., Y. Ducq, and C. Goetz. 2016. “Analyzing the Lean Manufacturing Challenges to Sustain Flexible Aeronautic Industry.” In ILS 2016 – 6th International Conference on Information Systems, Logistics and Supply Chain, 1: 1–8. Bordeaux, France.
  • Amrani, A., and Y. Ducq. 2020. “Lean Practices Implementation  in Aerospace Based on Sector Characteristics: Methodology and Case Study.” Production Planning and Control 31 (16): 1313–1335. doi:10.1080/09537287.2019.1706197.
  • Clarivate Analytics. 2020. “Journal Citation Reports”. Clarivate Analytics. https://clarivate.com/webofsciencegroup/solutions/journal-citation-reports/
  • Arend, R. J., and J. D. Wisner. 2005. “Small Business and Supply Chain Management: Is There a Fit?” Journal of Business Venturing 20 (3): 403–436. doi:10.1016/j.jbusvent.2003.11.003.
  • Aslam, M., Z. Gao, and G. Smith. 2020. “Exploring Factors for Implementing Lean Construction for Rapid Initial Successes in Construction.” Journal of Cleaner Production 277: 123295. doi:10.1016/j.jclepro.2020.123295.
  • Aziz, R. F., and S. M. Hafez. 2013. “Applying Lean Thinking in Construction and Performance Improvement.” Alexandria Engineering Journal 52 (4): 679–695. doi:10.1016/j.aej.2013.04.008.
  • Babalola, O., E. O. Ibem, and I. C. Ezema. 2019. “Implementation of Lean Practices in the Construction Industry: A Systematic Review.” Building and Environment 148: 34–43. doi:10.1016/j.buildenv.2018.10.051.
  • Ballard, H. G. 2000. “The Last Planner System of Production Control”. Ph.D. Thesis, The University of Birmingham.
  • Basu, P., and P. K. Dan. 2020. “A Comprehensive Study of Manifests in Lean Manufacturing Implementation and Framing an Administering Model.” International Journal of Lean Six Sigma 11 (4): 797–820. doi:10.1108/IJLSS-11-2017-0131.
  • Bayhan, H. G., S. Demirkesen, and E. Jayamanne. 2019. “Enablers and Barriers of Lean Implementation in Construction Projects.” IOP Conference Series: Materials Science and Engineering 471 (2): 022002. doi:10.1088/1757-899X/471/2/022002.
  • Behnam, D., A. Ayough, and S. H. Mirghaderi. 2018. “Value Stream Mapping Approach and Analytical Network Process to Identify and Prioritize Production System’s Mudas (Case Study: Natural Fibre Clothing Manufacturing Company).” The Journal of the Textile Institute 109 (1): 64–72. doi:10.1080/00405000.2017.1322737.
  • Belkadi, S., I. Cherti, and M. Bahaj. 2019. “The Barriers to Lean Implementation in This New Industrial Context.” Advances in Intelligent Systems and Computing 913 (January): 214–221. doi:10.1007/978-3-030-11881-5_18.
  • Berger, A. 1997. “Continuous Improvement and Kaizen: Standardization and Organizational Designs.” Integrated Manufacturing Systems 8 (2): 110–117. doi:10.1108/09576069710165792.
  • Bhamu, J., and K. S. Sangwan. 2014. “Lean Manufacturing: Literature Review and Research Issues.” International Journal of Operations & Production Management 34 (7): 876–940. doi:10.1108/IJOPM-08-2012-0315.
  • Bhasin, S. 2008. “Lean and Performance Measurement.” Journal of Manufacturing Technology Management 19 (5): 670–684. doi:10.1108/17410380810877311.
  • Bhasin, S. 2012. “Prominent Obstacles to Lean.” International Journal of Productivity and Performance Management 61 (4): 403–425. doi:10.1108/17410401211212661.
  • Birkie, S. E., and P. Trucco. 2016. “Understanding Dynamism and Complexity Factors in Engineer-to-Order and Their Influence on Lean Implementation Strategy.” Production Planning & Control 27 (5): 345–359. doi:10.1080/09537287.2015.1127446.
  • Böhm, A. 2004. “Theoretical Coding: Text Analysis in Grounded Theory.” In A Companion to Qualitative Research (vol. 1), 270–275.
  • Boland, A., G. Cherry, and R. Dickson. 2017. Doing a Systematic Review: A Student’s Guide. Thousand Oaks, CA: Sage.
  • Booth, A., A. Sutton, and D. Papaioannou. 2016. Systematic Approaches to a Successful Literature Review. Thousand Oaks, CA: Sage.
  • Bortolotti, T., P. Danese, and P. Romano. 2013. “Assessing the Impact of Just-in-Time on Operational Performance at Varying Degrees of Repetitiveness.” International Journal of Production Research 51 (4): 1117–1130. doi:10.1080/00207543.2012.678403.
  • Brady, D. A., P. Tzortzopoulos, J. Rooke, C. T. Formoso, and A. Tezel. 2018. “Improving Transparency in Construction Management: A Visual Planning and Control Model.” Engineering, Construction and Architectural Management 25 (10): 1277–1297. doi:10.1108/ECAM-07-2017-0122.
  • Braglia, M., G. Carmignani, and F. Zammori. 2006. “A New Value Stream Mapping Approach for Complex Production Systems.” International Journal of Production Research 44 (18–19): 3929–3952. doi:10.1080/00207540600690545.
  • Braglia, M., M. Frosolini, M. Gallo, and L. Marrazzini. 2019. “Lean Manufacturing Tool in Engineer-to-Order Environment: Project Cost Deployment.” International Journal of Production Research 57 (6): 1825–1839. doi:10.1080/00207543.2018.1508905.
  • Braglia, M., P. Dallasega, and L. Marrazzini. 2020. “Overall Construction Productivity: A New Lean Metric to Identify Construction Losses and Analyse Their Causes in Engineer-to-Order Construction Supply Chains.” Production Planning and Control 0 (0): 1–18. doi:10.1080/09537287.2020.1837931.
  • Braglia, M., R. Gabbrielli, and L. Marrazzini. 2019. “Overall Task Effectiveness: A New Lean Performance Indicator in Engineer-to-Order Environment.” International Journal of Productivity and Performance Management 68 (2): 407–422. doi:10.1108/IJPPM-05-2018-0192.
  • Breuer, H., and F. Steinhoff. 2010. “Grounded Innovation–A Research Approach for the Fuzzy Front End of Innovation Management.” In Proceedings of BAI International Conference on Business and Innovation, Kitakyushu, Japan (vol. 7). ISSN 1729-9322.
  • Brox, J. A., and C. Fader. 2002. “The Set of Just-in-Time Management Strategies: An Assessment of Their Impact on Plant-Level Productivity and Input-Factor Substitutability Using Variable Cost Function Estimates.” International Journal of Production Research 40 (12): 2705–2720. doi:10.1080/00207540210137657.
  • Buer, S. V., J. O. Strandhagen, and F. T. S. Chan. 2018. “The Link between Industry 4.0 and Lean Manufacturing: Mapping Current Research and Establishing a Research Agenda.” International Journal of Production Research 56 (8): 2924–2940. doi:10.1080/00207543.2018.1442945.
  • Cagliano, R., F. Caniato, R. Golini, A. Longoni, and E. Micelotta. 2011. “The Impact of Country Culture on the Adoption of New Forms of Work Organization.” International Journal of Operations & Production Management 31 (3): 297–323. doi:10.1108/01443571111111937.
  • Cano, S., J. Delgado, L. Botero, and O. Rubiano. 2015. “Barriers and Success Factors in Lean Construction’s Implementation – Survey in Pilot Context.” In Proc. 23rd Ann. Conf. of the Int’l. Group for Lean Construction. Perth, Australia, July 29–31, pp. 631–641. Available at www.iglc.net
  • Chadegani, A., H. Salehi, M. Yunus, H. Farhadi, M. Fooladi, M. Farhadi, and N. Ale Ebrahim. 2013. “A Comparison between Two Main Academic Literature Collections: Web of Science and Scopus Databases.” Asian Social Science 9 (5): 18–26. https://ssrn.com/abstract=2257540.
  • Cheng, R., and A. Johnson. 2016. “Motivation and Means: How and Why IPD and Lean Lead to Success.” conservancy.umn.edu.
  • Cherrafi, A., S. Elfezazi, J. A. Garza-Reyes, K. Benhida, and A. Mokhlis. 2017. “Barriers in Green Lean Implementation: A Combined Systematic Literature Review and Interpretive Structural Modelling Approach.” Production Planning & Control 28 (10): 829–842. doi:10.1080/09537287.2017.1324184.
  • Cho, S., and G. Ballard. 2011. “Last Planner and Integrated Project Delivery.” Lean Construction Journal 1: 67–78.
  • Chouiraf, F., and A. Chafi. 2018. “Adaptation of the Value Stream Mapping (VSM) for the Moroccan Artisanal Enterprise.” In Colloquium in Information Science and Technology, 124–129, CIST 2018-Oct. New York, USA: IEEE. doi:10.1109/CIST.2018.8596624.
  • Claycomb, C., C. Dröge, and R. Germain. 1999. “The Effect of Just-in-Time with Customers on Organizational Design and Performance.” The International Journal of Logistics Management 10 (1): 37–58. doi:10.1108/09574099910805923.
  • Dallasega, P., and E. Rauch. 2017. “Sustainable Construction Supply Chains through Synchronized Production Planning and Control in Engineer-to-Order Enterprises.” Sustainability 9 (10): 1888. doi:10.3390/su9101888.
  • Dallasega, P., E. Marengo, and A. Revolti. 2021. “Strengths and Shortcomings of Methodologies for Production Planning and Control of Construction Projects: A Systematic Literature Review and  Future Perspectives.” Production Planning and Control 32 (4): 1–26. doi:10.1080/09537287.2020.1725170.
  • Dallasega, P., E. Rauch, and M. Frosolini. 2018. “A Lean Approach for Real-Time Planning and Monitoring in Engineer-to-Order Construction Projects.” Buildings 8 (3): 38. doi:10.3390/buildings8030038.
  • Dallasega, P., R. A. Rojas, G. Bruno, and E. Rauch. 2019. “An Agile Scheduling and Control Approach in ETO Construction Supply Chains.” Computers in Industry 112: 103122. doi:10.1016/j.compind.2019.08.003.
  • Danese, P., V. Manfè, and P. Romano. 2018. “A Systematic Literature Review on Recent Lean Research: State-of-the-Art and Future Directions.” International Journal of Management Reviews 20 (2): 579–605. doi:10.1111/ijmr.12156.
  • Dekkers, R., C. M. Chang, and J. Kreutzfeldt. 2013. “The Interface between Product Design and Engineering and Manufacturing: A Review of the Literature and Empirical Evidence.” International Journal of Production Economics 144 (1): 316–333. doi:10.1016/j.ijpe.2013.02.020.
  • Demirkesen, S., and H. G. Bayhan. 2019. “Critical Success Factors of Lean Implementation in the Construction Industry.” IEEE Transactions on Engineering Management 1: 1–17. doi:10.1109/TEM.2019.2945018.
  • Denyer, D., and D. Tranfield. 2009. “Producing a Systematic Review.” In The Sage Handbook of Organizational Research Methods, edited by D. A. Buchanan and A. Bryman, 671–689. London, UK: Sage Publications Ltd.
  • Dominici, G., and F. Palumbo. 2013. “Decoding the Japanese Lean Production System according to a Viable Systems Perspective.” Systemic Practice and Action Research 26 (2): 153–171. doi:10.1007/s11213-012-9242-z.
  • Dora, M., M. Kumar, and X. Gellynck. 2016. “Determinants and Barriers to Lean Implementation in Food-Processing SMEs – a Multiple Case Analysis.” Production Planning & Control 27 (1): 1–23. doi:10.1080/09537287.2015.1050477.
  • Equit, C., and C. Hohage. 2016. “Ausgewählte Entwicklungen Und Konfliktlinien Der Grounded-Theory-Methodologie.” In Handbuch Grounded Theory. Von Der Methodologie Zur Forschungspraxis, 9–46. Weinheim Basel, Schweiz: Beltz Verlag.
  • Erthal, A., and L. Marques. 2018. “National Culture and Organisational Culture in Lean Organisations: A Systematic Review.” Production Planning & Control 29 (8): 668–687. doi:10.1080/09537287.2018.1455233.
  • European Commission. 2020. “Internet Market, Industry, Entrepreneurship and SMEs.” https://ec.europa.eu/growth/sectors/mechanical-engineering_en.
  • Excellence in Research for Australia. 2018. “ERA Conference Rating.” https://www.arc.gov.au/excellence-research-australia.
  • Famiyeh, S., C. T. Amoatey, E. Adaku, and C. S. Agbenohevi. 2017. “Major Causes of Construction Time and Cost Overruns: A Case of Selected Educational Sector Projects in Ghana.” Journal of Engineering, Design and Technology 15 (2): 181–198. doi:10.1108/JEDT-11-2015-0075.
  • Forero, S., S. Cardenas, H. Vargas, and C. Garcia. 2015. “A Deeper Look into the Perception and Disposition to Integrated Project Delivery (IPD) in Colombia.” In Proceedings of IGLC 23–23rd Annual Conference of the International Group for Lean Construction: Global Knowledge-Global Solutions, 297–306. Perth, Australia: IGLC.
  • Freeland, J. R. 1991. “A Survey of Just-in-Time Purchasing Practices in the United States.” Production and Inventory Management Journal 32 (2): 43.
  • Fukushima, K. 2000. “Defining ‘Pull Scheduling.’” In Bulletin of the Department of Economics (vol. 1), pp. 35–36.
  • Galsworth, G. D. 1997. Visual Systems: Harnessing the Power of the Visual Workplace, 320. New York: American Management Association.
  • Gepp, M., M. Foehr, and J. Vollmar. 2016. “Standardization, Modularization and Platform Approaches in the Engineer-to-Order Business – Review and Outlook.” In 2016 Annual IEEE Systems Conference (SysCon), 287–301. Orlando, USA: IEEE. doi:10.1109/SYSCON.2016.7490549.
  • Godinho Filho, M., G. M. D. Ganga, and A. Gunasekaran. 2016. “Lean Manufacturing in Brazilian Small and Medium Enterprises: Implementation and Effect on Performance.” International Journal of Production Research 54 (24): 7523–7545. doi:10.1080/00207543.2016.1201606.
  • Gupta, S., and S. K. Jain. 2013. “A Literature Review of Lean Manufacturing.” International Journal of Management Science and Engineering Management 8 (4): 241–249. doi:10.1080/17509653.2013.825074.
  • Guz, A. N., and J. J. Rushchitsky. 2009. “On the Problem of Evaluation of Scientific Publications.” International Applied Mechanics 45 (3): 233–244.
  • Hame, N. B. M., T. O. Kowang, and G. C. Fei. 2017. “Categorization of Lean Research and Development Tools and Techniques: A Process-Based Approach.” Indian Journal of Science and Technology 10 (3), 1–7. doi:10.17485/ijst/2017/v10i3/110643.
  • Haque, B., K. S. Pawar, and R. J. Barson. 2003. “The Application of Business Process Modelling to Organisational Analysis of Concurrent Engineering Environments.” Technovation 23 (2): 147–162. doi:10.1016/S0166-4972(01)00103-1.
  • Hermes, M. 2015. “Prefabrication & Modularization as a Part of Lean Construction -Status Quo in Germany.” In Proceedings of IGLC 23 – 23rd Annual Conference of the International Group for Lean Construction: Global Knowledge – Global Solutions, 2015-Janua, 235–245. Perth, Australia: IGLC.
  • Hines, P., M. Holweg, and N. Rich. 2004. “Learning to Evolve: A Review of Contemporary Lean Thinking.” International Journal of Operations & Production Management 24 (10): 994–1011. doi:10.1108/01443570410558049.
  • Ho, S. 1993. “Transplanting Japanese Management Techniques.” Long Range Planning 26 (4): 81–89. doi:10.1016/0024-6301(93)90061-J.
  • Hussain, K., Z. He, N. Ahmad, M. Iqbal, and T. S. M. Mumtaz. 2019. “Green, Lean, Six Sigma Barriers at a Glance: A Case from the Construction Sector of Pakistan.” Building and Environment 161: 106225. doi:10.1016/j.buildenv.2019.106225.
  • Institute, Construction Industry. 2005. “Lean Principles in Construction.” Research Summary. https://www.construction-institute.org/resources/knowledgebase/knowledge-areas/general-cii-information/topics/rt-191.
  • Jadhav, J., S. Mantha, and S. Rane. 2014. “Exploring Barriers in Lean Implementation.” International Journal of Lean Six Sigma 5 (2): 122–148. doi:10.1108/IJLSS-12-2012-0014.
  • Jamil, S., B. Xia, S. Fawzia, A. Karim, and A. Olanipekun. 2018. “Barriers to Implementing Lean Construction Practices in the Kingdom of Saudi Arabian (KSA) Construction Industry.” World Development 1 (1): 1–15. doi:10.1016/j.worlddev.2018.08.012.
  • Jin, H. W., and T. L. Doolen. 2014. “A Comparison of Korean and US Continuous Improvement Projects.” International Journal of Productivity and Performance Management 63 (4): 384–405. doi:10.1108/IJPPM-01-2013-0012.
  • Josephson, P. E., and L. Björkman. 2013. “Why Do Work Sampling Studies in Construction? The Case of Plumbing Work in Scandinavia.” Engineering, Construction and Architectural Management 20 (6): 589–603. doi:10.1108/ECAM-12-2011-0108.
  • Junker, B. 2010. “Kaizen for Improvement of Rapid Protein Production for Early Reagent Protein Quantities.” Biochemical Engineering Journal 49 (3): 435–444. doi:10.1016/j.bej.2010.02.007.
  • Kalsaas, B. T., J. Skaar, and R. T. Thorstensen. 2016. “Pull vs. Push in Construction Work Informed by Last Planner.” In 23rd Annual Conference of the International Group for Lean Construction, 103–112. Perth, Australia: IGLC.
  • Kattman, B., T. P. Corbin, L. E. Moore, and L. Walsh. 2012. “Visual Workplace Practices Positively Impact Business Processes.” Benchmarking: An International Journal 19 (3): 412–430. doi:10.1108/14635771211243021.
  • Kaur, M., and R. Kaur. 2013. “Kaizen Costing Technique – a Literature Review.” International Journal of Research in Commerce and Management 4: 84–87.
  • Kenley, R., and O. Seppänen. 2006. Location-Based Management for Construction: Planning, Scheduling and Control. Oxfordshire, England, UK: Routledge.
  • Kim, Y. W., K. Rezqallah, H. W. Lee, and J. Angeley. 2016. “Integrated Project Delivery in Public Projects: Limitations and Opportunity.” In IGLC 2016 – 24th Annual Conference of the International Group for Lean Construction, 93–102. Boston, USA: IGLC.
  • Kjersem, K.,. L. Lillebryg, and P. Kiekebos. 2015. “Implementing Lean in Engineer-to-Order Industry: A Case Study.” IFIP 1: 248–255. doi:10.1007/978-3-319-22759-7.
  • Kumar, R., and V. Kumar. 2014. “Barriers in Implementation of Lean Manufacturing System in Indian Industry: A Survey.” International Journal of Latest Trends in Engineering and Technology 4 (2): 243–251.
  • Leu, X., and K. Ashoka. 2019. “Supply Chain Management in Prefabricated Construction: An Overview of a Developed Conceptual Framework.” Journal of System and Management Sciences 9 (2): 43–79.
  • Li, S., Y. Fang, and X. Wu. 2020. “A Systematic Review of Lean Construction in Mainland China.” Journal of Cleaner Production 257: 120581. doi:10.1016/j.jclepro.2020.
  • Liberati, A., D. G. Altman, J. Tetzlaff, C. Mulrow, P. C. Gøtzsche, J. P. A. Ioannidis, M. Clarke, P. J. Devereaux, J. Kleijnen, and D. Moher. 2009. “The PRISMA Statement for Reporting Systematic Reviews and Meta-Analyses of Studies That Evaluate Health Care Interventions: Explanation and Elaboration.” Journal of Clinical Epidemiology 62 (10): e1–e34. doi:10.1016/j.jclinepi.2009.06.006.
  • Liker, J. K., and J. M. Morgan. 2006. “The Toyota Way in Services: The Case of Lean Product Development.” Academy of Management Perspectives 20 (2): 5–20. doi:10.5465/amp.2006.20591002.
  • Liker, J. K. 2004. “The 14 Principles of the Toyota Way: An Executive Summary of the Culture Behind TPS.” In The Toyota Way: 14 Management Principles from the World’s Greatest Manufacturer, 35–41. New York: McGraw-Hill.
  • Little, D., R. Rollins, M. Peck, and J. K. Porter. 2000. “Integrated Planning and Scheduling in the Engineer-to-Order Sector.” International Journal of Computer Integrated Manufacturing 13 (6): 545–554. doi:10.1080/09511920050195977.
  • Lodgaard, E., I. Gamme, S. Aschehoug, and J. A. Ingvaldsen. 2016. “Barriers to Lean Implementation: Perceptions of Top Managers, Middle Managers and Workers.” Engineering, Construction and Architectural Management 57 (2): 159–167. doi:10.1016/j.procir.2016.11.033.
  • Lugert, A., A. Batz, and H. Winkler. 2018. “Empirical Assessment of the Future Adequacy of Value Stream Mapping in Manufacturing Industries.” Journal of Manufacturing Technology Management 29 (5): 886–906. doi:10.1108/JMTM-11-2017-0236.
  • Luo, L.,. X. Jin, G. Q. Shen, Y. Wang, X. Liang, X. Li, and C. Z. Li. 2020. “Supply Chain Management for Prefabricated Building Projects in Hong Kong.” Journal of Management in Engineering 36 (2): 05020001. doi:10.1061/(ASCE)ME.1943-5479.0000739.
  • Mano, A. P., S. E. Gouvea da Costa, and E. Pinheiro de Lima. 2020. “Criticality Assessment of the Barriers to Lean Construction.” International Journal of Productivity and Performance Management 70 (1): 65–86. doi:10.1108/IJPPM-11-2018-0413.
  • Marodin, G. A., and T. A. Saurin. 2014. “Managing Barriers to Lean Production Implementation: Context Matters.” International Journal of Production Research 53 (13): 3947–3962. doi:10.1080/00207543.2014.980454.
  • Marodin, G. A., and T. A. Saurin. 2015. “Classification and Relationships between Risks That Affect Lean Production Implementation: A Study in Southern Brazil.” Journal of Manufacturing Technology Management 26 (1): 57–79. doi:10.1108/JMTM-12-2012-0113.
  • Matt, D. T., and E. Rauch. 2014. “Implementing Lean in Engineerto-Order Manufacturing: Experiences from a ETO Manufacturer.” Handbook of Research on Design and Management of Lean Production Systems 1: 148–172. doi:10.4018/978-1-4666-5039-8.ch008.
  • Matthews, O., and G. A. Howell. 2005. “Integrated Project Delivery an Example of Relational Contracting.” Lean Construction Journal 2 (1): 46–61.
  • McBurney, M. K., and P. L. Novak. 2002. ‘What Is Bibliometrics and Why Should You Care?’ In IEEE International Professional Communication Conference, 108–114. New York, USA: IEEE.
  • Mittal, V. K., R. Sindhwani, and P. K. Kapur. 2016. “Two-Way Assessment of Barriers to Lean–Green Manufacturing System: Insights from India.” International Journal of System Assurance Engineering and Management 7 (4): 400–407. doi:10.1007/s13198-016-0461-z.
  • Mossman, A. 2018. “What Is Lean Construction: Another Look.” In 26th Annual Conference of the International Group for Lean Construction, 1240–1250. New York, USA: IGLC.
  • Murguía, D., X. Brioso, and A. Pimentel. 2016. “Applying Lean Techniques to Improve Performance in the Finishing Phase of a Residential Building.” In IGLC 2016 – 24th Annual Conference of the International Group for Lean Construction, 43–52. New York, USA: IGLC
  • Okoli, C., and K. Schabram. 2010. A Guide to Conducting a Systematic Literature Review of Information Systems Research. Sprouts: Working Papers on Information Systems.
  • Omotayo, T. S., U. Kulatunga, and B. Bjeirmi. 2018. “Critical Success Factors for Kaizen Implementation in the Nigerian Construction Industry.” International Journal of Productivity and Performance Management 67 (9): 1816–1836. doi:10.1108/IJPPM-11-2017-0296.
  • Panizzolo, R., P. Garengo, M. K. Sharma, and A. Gore. 2012. “Lean Manufacturing in Developing Countries: Evidence from Indian SMEs.” Production Planning & Control 23 (10–11): 769–788. doi:10.1080/09537287.2011.642155.
  • Pereira, A. C., J. Dinis-Carvalho, A. C. Alves, and P. Arezes. 2019. “How Industry 4.0 Can Enhance Lean Practices.” FME Transactions 47 (4): 810–822. doi:10.5937/fmet1904810P.
  • Petticrew, M., and H. Roberts. 2008. Systematic Reviews in the Social Sciences: A Practical Guide. New Jersey, USA: John Wiley & Sons.
  • Portioli-Staudacher, A., and M. Tantardini. 2012. “Lean Implementation in Non-Repetitive Companies: A Survey and Analysis.” International Journal of Services and Operations Management 11 (4): 385–406. doi:10.1504/IJSOM.2012.046076.
  • Powell, D., J. O. Strandhagen, I. Tommelein, G. Ballard, and M. Rossi. 2014. “A New Set of Principles for Pursuing the Lean Ideal in Engineer-to-Order Manufacturers.” Procedia CIRP 17: 571–576. doi:10.1016/j.procir.2014.01.137.
  • Ratajczak, J., C. P. Schimanski, C. Marcher, M. Riedl, and D. T. Matt. 2017. “Mobile Application for Collaborative Scheduling and Monitoring of Construction Works According to Lean Construction Methods.” In International Conference on Cooperative Design. Cham: Springer.
  • Ratajczak, J., M. Riedl, and D. T. Matt. 2019. “BIM-Based and AR Application Combined with Location-Based Management System for the Improvement of the Construction Performance.” Buildings 9 (5): 118. doi:10.3390/buildings9050118.
  • Rauch, E., M. Unterhofer, and P. Dallasega. 2018. “Industry Sector Analysis for the Application of Additive Manufacturing in Smart and Distributed Manufacturing Systems.” Manufacturing Letters 15: 126–131. doi:10.1016/j.mfglet.2017.12.011.
  • Rauch, E., P. Dallasega, and D. T. Matt. 2015. “Synchronization of Engineering, Manufacturing and on-Site Installation in Lean ETO-Enterprises’.” Procedia CIRP 37: 128–133. doi:10.1016/j.procir.2015.08.047.
  • Rossini, M., F. Audino, F. Costa, F. D. Cifone, K. Kundu, and A. Portioli-Staudacher. 2019. “Extending Lean Frontiers: A Kaizen Case Study in an Italian MTO Manufacturing Company.” The International Journal of Advanced Manufacturing Technology 104 (5–8): 1869–1888. doi:10.1007/s00170-019-03990-x.
  • Salonitis, K., and C. Tsinopoulos. 2016. “Drivers and Barriers of Lean Implementation in the Greek Manufacturing Sector.” Procedia CIRP 57: 189–194. doi:10.1016/j.procir.2016.11.033.
  • Sanders, A., C. Elangeswaran, and J. Wulfsberg. 2016. “Industry 4.0 Implies Lean Manufacturing: Research Activities in Industry 4.0 Function as Enablers for Lean Manufacturing.” Journal of Industrial Engineering and Management 9 (3): 811–833. doi:10.3926/jiem.1940.
  • Schimanski, C. P., G. P. Monizza, C. Marcher, and D. T. Matt. 2020. “Conceptual Foundations for a New Lean BIM-Based Production System in Construction.” In 27th Annual Conference of the International Group for Lean Construction, IGLC 2019, 877–888. doi:10.24928/2019/0106.
  • Schulze, F., and P. Dallasega. 2020. “Industry 4.0 Concepts and Lean Methods Mitigating Traditional Losses in Engineer-to-Order Manufacturing with Subsequent Assembly on-Site: A Framework.” Procedia Manufacturing 51: 1363–1370. doi:10.1016/j.promfg.2020.10.190.
  • Seth, D., and S. Rastogi. 2019. “Application of Vendor Rationalization Strategy for Manufacturing Cycle Time Reduction in Engineer to Order (ETO) Environment: A Case Study.” IFIP Advances in Information and Communication Technology 18 (1): 1: 48–172. doi:10.1007/978-3-030-30000-5_71.
  • Seth, D., N. Seth, and P. Dhariwal. 2017. “Application of Value Stream Mapping (VSM) for Lean and Cycle Time Reduction in Complex Production Environments: A Case Study.” Production Planning & Control 28 (5): 398–419. doi:10.1080/09537287.2017.1300352.
  • Shanker, A., and K. Varghese. 2013. “Evaluation of Location Based Management System in the Construction of Power Transmission and Distribution Projects.” In ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction. Vol. 30. IAARC Publications.
  • Singh, J., and H. Singh. 2020. “Application of Lean Manufacturing in Automotive Manufacturing Unit.” International Journal of Lean Six Sigma 11 (1): 171–210. doi:10.1108/IJLSS-06-2018-0060.
  • Sriram, P. K., E. Alfnes, and E. Arica. 2013. “A Concept for Project Manufacturing Planning and Control for Engineer-to-Order Companies.” IFIP Advances in Information and Communication Technology 398 (PART 2): 699–706. doi:10.1007/978-3-642-40361-3_89.
  • Stamm, M., and T. Neitzert. 2008. “Value Stream Mapping (VSM) in a Manufacture-to-Order Small and Medium Enterprise.” In 3rd World Conference on Production and Operations Management, Tokyo, Japan, 1–15. Tokyo, Japan: JOMSA.
  • Stoettrup, M., S. Larsen, S. M. Lindhard, and T. D. Brunoe. 2019. “Mass Customization in the House Building Industry: Literature Review and Research Directions.” Frontiers in Built Environment 5 (October): 1–12. doi:10.3389/fbuil.2019.00115.
  • Strandhagen, J. W., L. R. Vallandingham, E. Alfnes, and J. O. Strandhagen. 2018. “Operationalizing Lean Principles for Lead Time Reduction in Engineer-to-Order (ETO) Operations: A Case Study.” IFAC-PapersOnLine 51 (11): 128–133. doi:10.1016/j.ifacol.2018.08.246.
  • Strandhagen, S. V Buer, M. Semini, and E. Alfnes. 2019. “Digitalized Manufacturing Logistics in Engineer-to-Order Operations.” In IFIP Advances in Information and Communication Technology, 566: 579–587. doi:10.1007/978-3-030-30000-5_71.
  • Tezel, A., and Z. Aziz. 2015. “Visual Controls at the Workface of Road Construction and Maintenance: Preliminary Report.” http://eprints.hud.ac.uk/id/eprint/29093/.
  • Tezel, A., and Z. Aziz. 2017. “Visual Management in Highways Construction and Maintenance in England.” Engineering, Construction and Architectural Management 24 (3): 486–513. doi:10.1108/ECAM-02-2016-0052.
  • Tezel, A., L. Koskela, and Z. Aziz. 2018. “Lean Thinking in the Highways Construction Sector: Motivation, Implementation and Barriers.” Production Planning & Control 29 (3): 247–269. doi:10.1080/09537287.2017.1412522.
  • Tezel, A., L. Koskela, P. Tzortzopoulos, C. Torres, and T. Alves. 2015. “Visual Management in Brazilian Construction Companies: Taxonomy and Guidelines for Implementation.” Journal of Management in Engineering 31: 1–18.
  • Tezel, A., M. Taggart, L. Koskela, P. Tzortzopoulos, J. Hanahoe, and M. Kelly. 2020. “Lean Construction and BIM in Small and Medium-Sized Enterprises (SMEs) in Construction: A Systematic Literature Review.” Canadian Journal of Civil Engineering 47 (2): 186–201. doi:10.1139/cjce-2018-0408.
  • Tomašević, I., D. Slović, and D. Stojanović. 2016. “Improving Efficiency of Engineer-to-Order Operations through Lean Implementation: Empirical Research.” In Symorg 2016 (vol. 1), 1036–1044. New York, USA: IEEE. doi:10.4018/978-1-4666-5039-8.ch008.
  • Tomašević, I., D. Stojanović, D. Slović, B. Simeunović, and I. Jovanović. 2020. “Lean in High-Mix/Low-Volume Industry: A Systematic Literature Review.” Production Planning and Control 0 (0): 1–16. doi:10.1080/09537287.2020.1782094.
  • Tranfield, D., D. Denyer, and P. Smart. 2003. “Towards a Methodology for developing evidence-Informed Management Knowledge by Means of Systematic Review.” British Journal of Management 14 (3): 207–222. doi:10.1111/1467-8551.00375.
  • Villar-Fidalgo, L., M. D. Espinosa Escudero, and M. Domínguez Somonte. 2019. “Applying Kaizen to the Schedule in a Concurrent Environment.” Production Planning & Control 30 (8): 624–638. doi:10.1080/09537287.2019.1566281.
  • Wesz, J. G. B., C. T. Formoso, and P. Tzortzopoulos. 2018. “Planning and Controlling Design in Engineered-to-Order Prefabricated Building Systems.” Engineering, Construction and Architectural Management 25 (2): 134–152. doi:10.1108/ECAM-02-2016-0045.
  • Wuni, I. Y., and G. Q. Shen. 2020. “Fuzzy Modelling of the Critical Failure Factors for Modular Integrated Construction Projects.” Journal of Cleaner Production 264: 121595. doi:10.1016/j.jclepro.2020.121595.
  • Yadav, O. P., B. Nepal, P. S. Goel, R. Jain, and R. P. Mohanty. 2010. “Insights and Learnings from Lean Manufacturing Implementation Practices.” International Journal of Services and Operations Management 6 (4): 398–422. doi:10.1504/IJSOM.2010.032916.
  • Yang, L. R. 2013. “Key Practices, Manufacturing Capability and Attainment of Manufacturing Goals: The Perspective of Project/Engineer-to-Order Manufacturing.” International Journal of Project Management 31 (1): 109–125. doi:10.1016/j.ijproman.2012.03.005.
  • Yusup, M. Z., W. H. W. Mahmood, and M. R. Salleh. 2015. “Basic Formation in Streamlining Lean Practices in Manufacturing Operations – a Review.” International Journal of Advanced Operations Management 7 (4): 255–273. doi:10.1504/IJAOM.2015.075024.
  • Zhang, L., B. E. Narkhede, and A. P. Chaple. 2017. “Evaluating Lean Manufacturing Barriers: An Interpretive Process.” Journal of Manufacturing Technology Management 28 (8): 1086–1114. doi:10.1108/JMTM-04-2017-0071.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.