Publication Cover
Production Planning & Control
The Management of Operations
Volume 34, 2023 - Issue 9
922
Views
7
CrossRef citations to date
0
Altmetric
Research Articles

From Quality-I to Quality-II: cultivating an error culture to support lean thinking and rework mitigation in infrastructure projects

ORCID Icon, ORCID Icon, ORCID Icon, ORCID Icon, ORCID Icon &
Pages 812-829 | Received 28 Nov 2020, Accepted 25 Jun 2021, Published online: 20 Aug 2021

References

  • Agnihothri, S. R., and R. S. Kenett. 1995. “The Impact of Defects on a Process with Rework.” European Journal of Operational Research 80 (2): 308–327. doi:10.1016/0377-2217(94)00173-A.
  • Alexander, J., F. Ackermann, and P. E. D. Love. 2019. “Taking a Holistic Exploration of the Project Life Cycle on Public-Private Partnerships.” Project Management Journal 50 (6): 673–685. doi:10.1177/8756972819848226.
  • Amalberti, R. 2001. “The Paradoxes of Almost Totally Safe Transportation Systems.” Safety Science 37 (2–3): 109–126. doi:10.1016/S0925-7535(00)00045-X.
  • Angelis, J., R. Conti, C. Cooper, and C. Gill. 2011. “Building a High-Commitment Lean Culture.” Journal of Manufacturing Technology Management 22 (5): 569–586. doi:10.1108/17410381111134446.
  • Bandura, A. 1986. Social Foundations of Thought and Action: A Social Cognitive Theory. Englewood Cliffs, NJ: Prentice-Hall. doi:10.5465/amr.1987.4306538.
  • Barber, Patrick, Andrew Graves, Mark Hall, Darryl Sheath, and Cyril Tomkins. 2000. “Quality Failure Costs in Civil Engineering Projects.” International Journal of Quality & Reliability Management 17 (4/5): 479–492. doi:10.1108/02656710010298544.
  • Beary, T. M., and T. S. Abdelhamid. 2005. “Production Planning Process in Residential Construction Using Lean Construction and Six Sigma Principles.” Paper presented at the Proceedings of the Construction Research Congress 2005, San Diego, USA, April 5th–7th, 153–162. doi:10.1061/40754(183)16.
  • Biswas, P., and B. R. Sarker. 2008. “Optimal Batch Quantity Models for a Lean Production System with in-Cycle Rework and Scrap.” International Journal of Production Research 46 (23): 6585–6610. doi:10.1080/00207540802230330.
  • Chen, T. H. 2017. “Optimizing Pricing, Replenishment and Rework Decision for Imperfect and Deteriorating Items in a Manufacturer-Retail Channel.” International Journal of Production Economics 183: 539–550. doi:10.1016/j.ijpe.2016.08.015.
  • Choudhry, R. M. 2014. “Behavior-Based Safety on Construction Sites: A Case Study .” Accident; Analysis and Prevention 70: 14–23. doi:10.1016/j.aap.2014.03.007
  • Cole, J. 2018. “Report of the Review Panel on Building Standards Compliance and Enforcement.” Building Standards Division, Directorate for Local Government and Communities, The Scottish Government, Livingston, Scotland. Accessed 4 November 2020. https://www.gov.scot/binaries/content/documents/govscot/publications/corporate-report/2018/06/report-review-compliance-enforcement/documents/00537870-pdf/00537870-pdf/govscot%3Adocument/00537870.pdf
  • Cooper, K. 1993. “The Rework Cycle: Benchmarks for the Project Manager.” Project Management Journal 24 (1): 17–21.
  • Creswell, J. W. 2009. Research Design: Qualitative, Quantitative, and Mixed Method Approaches. Los Angeles, CA: Sage Publications.
  • Crowley, A. 1998. “Construction as a Manufacturing Process: Lessons from the Automotive Industry.” Computers & Structures 67 (5): 389–400. doi:10.1016/S0045-7949(97)00147-8.
  • Das, Ajay, Mark Pagell, Michael Behm, and Anthony Veltri. 2008. “Toward a Theory of the Linkages between Safety and Quality.” Journal of Operations Management 26 (4): 521–535. doi:10.1016/j.jom.2007.06.005.
  • Dekker, S. 2006. The Field Guide to Understanding Human Error. London, UK: CRC Press. 10.1201/9781315239675
  • Dekker, S. 2014. Safety Differently: Human Factors for a New Era. 2nd ed. Boca Raton, FL: CRC Press. doi:10.1201/b17126.
  • Dekker, S. 2017. “Zero Commitment: Commentary on Zwetsloot et al. and Sherratt and Dainty.” Policy and Practice in Health and Safety 15 (2): 124–130. doi:10.1080/14773996.2017.1374027.
  • Dervin, B. 1992. “From the Mind's Eye of the User: The Sense-Making Qualitative-Quantitative Methodology.” In Qualitative Research in Information Management, edited by J. D. Glazier and R. R. Powell, 61–84. Englewood, CO: Libraries Unlimited. doi:10.1086/602575.
  • Dervin, B. 1998. “Sense-Making Theory and Practice: An Overview of User Interests in Knowledge Seeking and Use.” Journal of Knowledge Management 2 (2): 36–46. doi:10.1108/13673279810249369.
  • Dora, Manoj, Maneesh Kumar, Dirk Van Goubergen, Adrienn Molnar, and Xavier Gellynck. 2013. “Operational Performance and Critical Success Factors of Lean Manufacturing in European Food Processing SME’s.” Trends in Food Science & Technology 31 (2): 156–164. doi:10.1016/j.tifs.2013.03.002.
  • Dörner, D. 1996. The Logic of Failure. Reading, MA: Addison-Wesley. doi:10.1093/acprof:oso/9780198521914.003.0002.
  • Edmonson, A. C. 1999. “Psychological Safety and Learning from Behaviour in Work Teams.” Administrative Science Quarterly 44 (2): 350–383. doi:10.2307/2666999.
  • Egan, J. 1998. Rethinking Construction: Report of the Construction Task Force. London, UK: HMSO. Accessed 20 October 2020. https://constructingexcellence.org.uk/wp-content/uploads/2014/10/rethinking_construction_report.pdf.
  • Ehrhart, M. G., G. A. Aarons, and L. R. Farahnak. 2014. “Assessing the Organizational Context for EBP Implementation: The Development and Validity Testing of the Implementation Climate Scale (ICS).” Implementation Science: IS 9: 157. doi:10.1186/s13012-014-0157-1.
  • Flapper, S. D. P., J. C. Fransoo, R. A. C. M. Broekmeulen, and K. Inderfurth. 2002. “Planning and Control of Rework in Process Industries: A Review.” Production Planning & Control 13 (1): 26–34. doi:10.1080/09537280110061548.
  • Flapper, Simme Douwe P., and Ruud H. Teunter. 2004. “Logistic Planning of Rework with Deteriorating Work-in-Process.” International Journal of Production Economics 88 (1): 51–59. doi:10.1016/S0925-5273(03)00130-0.
  • Forcada, N., M. Gangolells, M. Casals, and M. Macarulla. 2017. “Factors Affecting Rework Costs in Construction.” Journal of Construction Engineering and Management 143 (8): 04017032. doi:10.1061/(ASCE)CO.1943-7862.0001324.
  • Freire, J., and L. F. Alarcón. 2002. “Achieving Lean Design Process: Improvement Methodology.” Journal of Construction Engineering and Management 128 (3): 248–256. doi:10.1061/(ASCE)0733-9364(2002)128:3(248).
  • Frese, Michael, Felix Brodbeck, Torsten Heinbokel, Christina Mooser, Erik Schleiffenbaum, and Petra Thiemann. 1991. “Errors in Training Computer Skills: On the Positive Function of Errors.” Human–Computer Interaction 6 (1): 77–93. doi:10.1207/s15327051hci0601_3.
  • Frese, M., and N. Keith. 2015. “Action Errors, Error Management, and Learning in organizations.” Annual Review of Psychology 66: 661–687. doi:10.1146/annurev-psych-010814-015205
  • Fruhen, L. S., R. H. Flin, and R. McLeod. 2014. “Chronic Unease for Safety in Managers: A Conceptualization.” Journal of Risk Research 17 (8): 969–979. doi:10.1080/13669877.2013.822924.
  • Fruhen, L. S., and N. Keith. 2014. “Team Cohesion and Error Culture in Risky Work Environments.” Safety Science 65: 20–27. doi:10.1016/j.ssci.2013.12.011.
  • Gaim, Medhanie, Nils Wåhlin, Miguel Pina e Cunha, and Stewart Clegg. 2018. “Analysing Competing Demands in Organisations: A Systemic Comparison.” Journal of Organization Design 7 (1): 6. doi:10.1186/s41469-018-0030-9.
  • Gann, D. M. 1996. “Construction as a Manufacturing Process? Similarities and Differences between Industrialised Housing and Car Production in Japan.” Construction Management and Economics 14 (5): 437–450. doi:10.1080/014461996373304.
  • Geller, E. S. 2001. “Behaviour-Based Safety in Industry: Realising the Large-Scale Potential of Psychology to Promote Human Welfare.” Applied and Preventative Psychology 10: 87–105. doi:10.1017/S0962-1849(02)01002-8.
  • Giustiniano, L., M. Pina e Cunha, A. V. Simpson, A. Rego, and S. Clegg. 2020. “Resilient Leadership as Paradox Work: Notes from COVID-19.” Management and Organisation Review 16 (5): 971. doi:10.1017/mor.2020.57.
  • Goerler, A., and S. Voß. 2016. “Dynamic Lot-Sizing with Rework of Defective Items and Minimum Lot-Size Constraints.” International Journal of Production Research 54 (8): 2284–2297. doi:10.1080/00207543.2015.1070970.
  • Gomez, S., G. Ballard, P. Arroyo, C. Hackler, R. Spencley, and I. D. Tommelein. 2020. “Lean, Psychological Safety, and Behaviour-Based Quality: A Focus on People and Value Delivery." In Proceedings of the 28th Annual Conference of the International Group for Lean Construction (IGLC28), Berkeley, San Francisco, California, USA, edited by I.D. Tommelein and E. Daniel. doi:10.24928/2020/0056.
  • Goodman, P. S., R. Ramanujam, J. S. Carroll, A. C. Edmondson, D. A. Hofmann, and K. M. Sutcliffe. 2011. “Organizational Errors: Directions for Future Research.” Research in Organizational Behavior 31: 151–176. doi:10.1016/j.riob.2011.09.003.
  • Green, S. D. 1999. “The Dark Side of Lean Construction: Exploitation and Ideology.” In Proceedings of the 7th Conference of the International Group for Lean Construction (IGLC-7), edited by I. D. Tommelein, 21–32. Berkeley, CA: University of California, Berkeley. Accessed 17 August 2020. http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.418.4301&rep=rep1&type=pdf#page=29
  • Green, S. D., and S. C. May. 2005. “Lean Construction: Arenas of Enactment, Models of Diffusion and the Meaning of ‘Leanness.” Building Research & Information 33 (6): 498–511. doi:10.1080/09613210500285106P.
  • Guo, B. H. W., T. W. Yiu, and V. A. González. 2016. “Predicting Safety Behaviour in the Construction Industry: Development and Test of an Integrative Model.” Safety Science 84: 1–11. doi:10.1016/j.ssci.2015.11.020.
  • Han, S., P. E. D. Love, and F. Peña-Mora. 2013. “A System Dynamics Model for Assessing the Impacts of Design Errors in Construction Projects.” Mathematical and Computer Modelling 57 (9–10): 2044–2053. doi:10.1016/j.mcm.2011.06.039.
  • Hayford, O. 2010. “Australia: Alliance Contracts – A Commercial Framework Requires A Commercial Lawyer.” Project Insights. Mondaq, Clayton Utz, 20th September. Accessed 12 November 2020. https://www.mondaq.com/australia/contracts-and-commercial-law/110526/alliance-contracts–a-commercial-framework-requires-a-commercial-lawyer
  • Hines, P., D. Taylor, and A. Walsh. 2020. “The Lean Journey: Have we Got It Wrong?” Total Quality Management & Business Excellence 31 (3–4): 389–406. doi:10.1080/14783363.2018.1429258.
  • Hjørland, B. 1998. “Theory and Metatheory of Information Science: A New Interpretation.” Journal of Documentation 54 (5): 606–621. doi:10.1108/EUM0000000007183.
  • Hofmann, D. A., and M. Frese. 2011. “Errors, Error Taxonomies, Error Prevention, and Error Management: laying the Groundwork for Discussing Errors in Organizations.” In Errors in Organizations. Routledge, edited by D. A. Hoffman and M. Frese, 1–44. New York, NY: Taylor and Francis. doi:10.4324/9780203817827.
  • Hollnagel, E. 2010. Safer Complex Industrial Environments. Boca Raton, FL: CRC Press. doi:10.1201/9781420092493.
  • Hollnagel, E. 2013. “A Tale of Two Safeties.” International Electronic Journal of Nuclear Safety and Simulation 4 (13): 1–10.
  • Hollnagel, E. 2014. Safety-I and Safety-II: The past and Future of Safety Management. London: CRC Press. doi:10.1201/9781315607511.
  • Howell, G., and G. Ballard. 1999. “Bringing Light to the Dark Side of Lean Construction: A Response to Stuart Green.” In Proceedings of the 7th Conference of the International Group for Lean Construction (IGLC-7), edited by I. D. Tommelein, 33–37. Berkeley, CA: University of California, Berkeley. Accessed 17 August 2020. http://faculty.ce.berkeley.edu/tommelein/IGLC-7/PDF/Howell&Ballard.pdf.
  • Hwang, B.-G., X. Hao, and K. J. Goh. 2014. “Investigating the Client-Related Rework in Building Projects: The Case of Singapore.” International Journal of Project Management 32 (4): 698–708. doi:10.1016/j.ijproman.2013.08.009.
  • Hwang, B.-G., S. R. Thomas, C. T. Haas, and C. H. Caldas. 2009. “Measuring the Impact of Rework on Construction Cost Performance.” Journal of Construction Engineering and Management 135 (3): 187–198. doi:10.1061/(ASCE)0733-9364(2009)135:3(187).
  • Kahn, W. A. 1990. “ Psychological Conditions of Personal Engagement and Disengagement at Work.” Academy of Management Journal 33 (4): 692–724. doi:10.2307/256287.
  • Koskela, L., A. Ferrantelli, J. Niiranen, E. Pikas, and D. Bhargav. 2019. “Epistemological Explanation for Lean Construction.” Journal of Construction Engineering and Management 145 (2): 04018131. doi:10.1061/(ASCE)CO.1943-7862.0001597.
  • Lei, Z., E. Naveh, and Z. Novikov. 2016. “Errors in Organizations: An Integrative Review via the Level of Analysis, Temporal Dynamism, and Priority Lenses.” Journal of Management 42 (5): 1315–1343. doi:10.1177/0149206316633745.
  • Li, Y., and T. Taylor. 2014. “Modelling the Impact of Design Rework on Transportation Infrastructure Construction Project Performance.” Journal of Construction Engineering and Management 140 (9): 04014044. doi:10.1061/(ASCE)CO.1943-7862.0000878.
  • Liker, J. K. 2004. The Toyota Way, 14 Management Principles from the World’s Greatest Manufacturer. New York, NY: McGraw-Hill. doi:10.1080/14767330701234002.
  • Liker, J. K., and M. Hoseus. 2010. “Human Resource Development in Toyota Culture.” International Journal of Human Resources Development and Management 10 (1): 34–50. doi:10.1504/ijhrm.2010.029445.
  • Love, P. E. D. 2020. “Creating a Mindfulness to Learn from Errors: Enablers of Rework Containment and Reduction in Construction.” Developments in the Built Environment 1 (1): 100001. doi:10.1016/j.dibe.2019.100001.
  • Love, P. E. D., D. J. Edwards, Z. Irani, and D. H. T. Walker. 2009. “Project Pathogens: The Anatomy of Omission Errors in Construction and Resource Engineering Projects.” IEEE Transactions on Engineering Management 56 (3): 425–435. doi:10.1109/TEM.2008.927774.
  • Love, P. E. D., and H. Li. 2000. “Overcoming the Problems Associated with Quality Certification.” Construction Management and Economics 18 (2): 139–149. doi:10.1080/014461900370771.
  • Love, P. E. D., and J. Matthews. 2020. “Quality, Requisite Imagination and Resilience: Managing Risk and Uncertainty in Construction.” Reliability Engineering & System Safety 204: 107172. doi:10.1016/j.ress.2020.107172.
  • Love, P. E. D., and J. Smith. 2016. “Toward Error Management in Construction: Moving beyond a Zero Vision.” Journal of Construction Engineering and Management 142 (11): 04016058. doi:10.1061/(ASCE)CO.1943-7862.0001170.
  • Love, P. E. D., J. Smith, F. Ackermann, and Z. Irani. 2018. “The Praxis of Stupidity: An Explanation to Understand the Barriers Mitigating Rework in Construction.” Production Planning & Control 29 (13): 1112–1125. doi:10.1080/09537287.2018.1518551.
  • Love, P. E. D., J. Smith, F. Ackermann, and Z. Irani. 2019. “Making Sense of Rework and Its Unintended Consequence in Projects: The Emergence of Uncomfortable Knowledge in Practice.” International Journal of Project Management 37 (3): 501–516. doi:10.1016/j.ijproman.2019.02.004.
  • Love, P. E. D., J. Smith, F. Ackermann, Z. Irani, W. Fang, H. Luo, and L. Y. Ding. 2019. “Houston, we Have a Problem! Understanding the Tensions between Quality and Safety in Construction.” Production Planning & Control 30 (16): 1354–1365. doi:10.1080/09537287.2019.1617908.
  • Love, P. E. D., P. Teo, J. Smith, F. Ackermann, and Y. Zhou. 2019. “The Nature and Severity of Workplace Injuries in Construction: Engendering Operational Benchmarking.” Ergonomics 62 (10): 1273–1288. doi:10.1080/00140139.2019.1644379.
  • Macomber, H., and G. Howell. (2004). “Two Great Wastes in Organisations: A Typology for Addressing the Concerns for the Underutilisation of Human Potential.” Proceedings of the 12th Conference of the International Group for Lean Construction (IGLC-12), 25–27 July, Helsingør, Denmark. Accessed 18 August 2020. https://leanconstruction.org.uk/wp-content/uploads/2018/09/Macomber-and-Howell-Two-Great-Wastes-in-Organisations.pdf.
  • Mannion, R., and J. Braithwaite. 2017. “False Dawns and New Horizons in Patient Safety Research and Practice.” International Journal of Health Policy and Management 6 (12): 685–689. doi:10.15171/ijhpm.2017.115.
  • Martínez-Jurado, P. D., J. Moyano-Fuentes, and P. Jerez-Gómez. 2014. “Human Resource Management in Lean Production and Implementation Processes: Success Factors in the Aeronautics Industry.” BRQ Business Research Quarterly 17 (1): 47–68. doi:10.1016/j.cede.2013.06.004.
  • Meng, X. 2019. “Lean Management in the Context of Construction Supply Chains.” International Journal of Production Research 57 (11): 3784–3798. doi:10.1080/00207543.2019.1566659.
  • Michaud, M.,. E.-C. Forgues, V. Carignan, D. Forgues, and C. Ouellet-Plamondon. 2019. “A Lean Approach to Optimize BIM Information Flow using Value Stream Mapping.” ITcon, 24, 472–488. https://www.itcon.org/2019/25
  • Miles, M. B., A. M. Huberman, and A. J. Saldaña. 2014. Qualitative Data Analysis: A Methods Sourcebook. London, UK: SAGE.
  • Moore-Bick, M. S. 2017. “Grenfell Tower Inquiry.” Accessed 4th November 2020. https://www.grenfelltowerinquiry.org.uk/.
  • Neill, S. D. 1987. “The Dilemma of the Subjective in Information Organization and Retrieval.” Journal of Documentation 43 (3): 193–211. doi:10.1108/eb026808.
  • Norman, D. A. 1981. “Categorization of Action Slips.” Psychological Review 88 (1): 1–15. doi:10.1037/0033-295X.88.1.1.
  • Oberauer, K., and R. Kliegl. 2006. “A Formal Model of Capacity Limits in Working Memory.” Journal of Memory and Language 55 (4): 601–626. doi:10.1016/j.jml.2006.08.009.
  • Ohno, T. 1988. Toyota Production System: Beyond Large-Scale Production. Portland, OR: Productivity Press.
  • Priven, V., and R. Sacks. 2015. “Effects of the Last Planner System on Social Networks among Construction Trade Crews.” Journal of Construction Engineering and Management 141 (6): 04015006. doi:10.1061/(ASCE)CO.1943-7862.0000975.
  • Putman, R. 1993. Managing Democracy Work: Civic Tradition in Modern Italy. Princeton, NJ: Princeton University Press.
  • Ramanujam, R., and P. S. Goodman. 2003. “Latent Errors and Adverse Organizational Consequences: A Conceptualization.” Journal of Organizational Behavior 24 (7): 815–836. doi:10.1002/job.218.
  • Reason, J. 1990. Human Error. New York, NY: Cambridge University Press. doi:10.1016/j.riob.2011.09.003.
  • Reason, J. 1997. Managing the Risk of Organizational Accidents. Aldershot, UK: Ashgate.
  • Robinson-Fayek, A., M. Dissanayake, and O. Campero. 2004. “Developing a Standard Methodology for Measuring and Classifying Construction Fieldwork.” Canadian Journal of Civil Engineering 31 (6): 1077–1089. doi:10.1139/l04-068.
  • Rodrigues, A., and J. Bowers. 1996. “The Role of System Dynamics in Project Management.” International Journal of Project Management 14 (4): 213–220. doi:10.1016/0263-7863(95)00075-5.
  • Saldaña, A. J. 2014. The Coding Manual for Qualitative Researchers. London, UK: SAGE.
  • Sasou, K., and J. Reason. 1999. “Team Errors: Definition and Taxonomy.” Reliability Engineering & System Safety 65 (1): 1–9. doi:10.1016/S0951-8320(98)00074-X.
  • Schein, E. H. 2010. Organisational Culture and Leadership. 4th Ed. San Francisco, CA: Jossey-Bass.
  • Scherrer-Rathje, M., T. A. Boyle, and P. Deflorin. 2009. “Lean, Take Two! Reflections from the Second Attempt at Lean Implementation.” Business Horizons 52 (1): 79–88. doi:10.1016/j.bushor.2008.08.004.
  • Seawright, J., and J. Gerring. 2008. “Case Selection Techniques in Case Study Research.” Political Research Quarterly 61 (2): 294–308. doi:10.1177/1065912907313077.
  • Shah, R., and P. T. Ward. 2007. “Defining and Developing Measures of Lean Production.” Journal of Operations Management 25 (4): 785–805. doi:10.1016/j.jom.2007.01.019.
  • Smith, K. M., and A. L. Valenta. 2018. “Safety I to Safety II: A Paradigm Shift or More Work as Imagined? Comment on “False Dawns and New Horizons in Patient Safety Research and Practice”.” International Journal of Health Policy and Management 7 (7): 671–673. doi:10.15171/ijhpm.2018.24
  • Spencley, R., G. Pfeffer, E. Gordon, F. Hain, D. Reed, and M. Marosszeky. 2018. “Behaviour-Based Quality Closing the Knowing Doing Gap.” In Proc. 26th Annual Conference of the International. Group for Lean Construction (IGLC), edited by V.A. González, 1170–1181. Chennai, India. doi:10.24928/2018/0532.
  • Ullah, M., and C. W. Kang. 2014. “Effect of Rework, Rejects and Inspection on Lot Size with Work-in-Process Inventory.” International Journal of Production Research 52 (8): 2448–2460. doi:10.1080/00207543.2013.873554.
  • Unisearch. 2019. “Opal Tower Investigation Final Report.” Independent Advice to NSW Minister for Planning and Housing, 19th February, Sydney, Australia. Accessed 4 November 2020. https://www.planning.nsw.gov.au/-/media/Files/DPE/Reports/opal-tower-investigation-final-report-2018-02-22.pdf?la=en.
  • Van Dyck, C., M. Frese, M. Baer, and S. Sonnentag. 2005. “Organizational Error Management Culture and Its Impact on Performance: A Two-Study Replication.” The Journal of Applied Psychology 90 (6): 1228–1240. doi:10.1037/0021-9010.90.6.1228
  • Walker, D. H. T. 1995. “An Investigation into Construction Time Performance.” Construction Management and Economics 13 (3): 263–274. doi:10.1080/01446199500000030.
  • Walker, D. H. T., and F. Rahmani. 2016. “Delivering a Water Treatment Plant Project Using a Collaborative Project Procurement Approach.” Construction Innovation 16 (2): 158–184. doi:10.1108/CI-03-2015-0015.
  • Walker, D. H. T., and S. Rowlinson. 2020. Handbook of Integrated Project Delivery. Abingdon, UK: Routledge. doi:10.1201/9781315185774.
  • Wanberg, J., C. Harper, M. Hallowell, and S. Rajendran. 2013. “Relationship between Construction Safety and Quality Performance.” Journal of Construction Engineering and Management 139 (10): 04013003. doi:10.1061/(ASCE)CO.1943-7862.0000732.
  • Wee, H. M., and G. A. Widyadana. 2012. “Economic Production Quantity Models for Deteriorating Items with Rework and Stochastic Preventive Maintenance Time.” International Journal of Production Research 50 (11): 2940–2952. doi:10.1080/00207543.2011.578159.
  • Westrum, R. 2004. “A Typology of Organisational Cultures.” Quality and Safety in Health Care 13 (suppl_2): ii22–ii27. doi:10.1136/qshc.2003.009522.
  • Westrum, R. 2014. “The Study of Information Flow: A Personal Journey.” Safety Science 67: 58–63. doi:10.1016/j.ssci.2014.01.009.
  • Yap, J. B. H., J. R. Chong, R. M. Skitmore, and W. P. Lee. 2020. “Rework Causation That Undermines Safety Performance during Production in Construction.” Journal of Construction Engineering and Management 146 (9): 04020106. doi:10.1061/(ASCE)CO.1943-7862.0001902.
  • Ye, G., Z. Jin, B. Xia, and R. M. Skitmore. 2015. “Analysing the Causes for Reworks in Construction Projects in China.” Journal of Management in Engineering 31 (6): 04014097. doi:10.1061/(ASCE)ME.1943-5479.0000347).
  • Zhao, B. 2011. “Learning from Errors: The Role of Context, Emotion, and Personality.” Journal of Organizational Behavior 32 (3): 435–463. doi:10.1002/job.696.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.