A comparative study of overall equipment effectiveness measurement systems

ORCID Icon, ORCID Icon & ORCID Icon
Pages 1-20 | Received 04 Feb 2020, Accepted 30 Jan 2022, Published online: 28 Mar 2022

References

  • Ahuja, G., and R. Katila. 2001. “Technological Acquisitions and the Innovation Performance of Acquiring Firms: A Longitudinal Study.” Strategic Management Journal 22 (3): 197–220. doi:10.1002/smj.157.
  • Al Janahi, R., H. Da Wan, Y. Lee, and A. Zarreh. 2020. “Effectiveness and Fitness of Production Line to Meet Customers’ Demand.” Procedia Manufacturing 51: 1348–1354. doi:10.1016/j.promfg.2020.10.188.
  • Aleš, Z., J. Pavlů, V. Legát, F. Mošna, and V. Jurča. 2019. “Methodology of Overall Equipment Effectiveness Calculation in the Context of Industry 4.0 Environment.” Ekspolatacja i Niezawodnosc – Maintenance and Reliability 21 (3): 411–418. doi:10.17531/ein.2019.3.7.
  • Andersson, C., and M. Bellgran. 2015. “On the Complexity of Using Performance Measures: Enhancing Sustained Production Improvement Capability by Combining OEE and Productivity.” Journal of Manufacturing Systems 35: 144–154. doi:10.1016/j.jmsy.2014.12.003.
  • Andy, N. 2002. “Business Performance Measurement: theory and Practice.” Choice Reviews Online 40 (02): 40–1010–40–1010. doi:10.5860/choice.40-1010.
  • Antonsen, Y. 2014. “The Downside of the Balanced Scorecard: A Case Study from Norway.” Scandinavian Journal of Management 30 (1): 40–50. doi:10.1016/j.scaman.2013.08.001.
  • Ardichvili, A., R. Cardozo, and S. Ray. 2003. “A Theory of Entrepreneurial Opportunity Identification and Development.” Journal of Business Venturing 18 (1): 105–123. doi:10.1016/S0883-9026(01)00068-4.
  • Badiger, A. S., and R. Gandhinathan. 2008. “A Proposal: Evaluation of OEE and Impact of Six Big Losses on Equipment Earning Capacity.” International Journal of Process Management and Benchmarking 2 (3): 234. doi:10.1504/IJPMB.2008.017962.
  • Bamber, C. J., P. Castka, J. M. Sharp, and Y. Motara. 2003. “Cross-Functional Team Working for Overall Equipment Effectiveness (OEE).” Journal of Quality in Maintenance Engineering 9 (3): 223–238. doi:10.1108/13552510310493684.
  • Bengtsson, M., L. G. Andersson, and P. Ekstrom. 2020. “Misconceptions within the Use of Overall Equipment Effectiveness – A Theoretical Discussion on Industrial Examples.” In Advances in Transdisciplinary Engineering 13: 36–47. doi:10.3233/ATDE200141.
  • Bokrantz, J., A. Skoogh, T. Ylipää, and J. Stahre. 2016. “Handling of Production Disturbances in the Manufacturing Industry.” Journal of Manufacturing Technology Management 27 (8): 1054–1075. doi:10.1108/JMTM-02-2016-0023.
  • Braglia, M., D. Castellano, M. Frosolini, and M. Gallo. 2018. “Overall Material Usage Effectiveness (OME): A Structured Indicator to Measure the Effective Material Usage within Manufacturing Processes.” Production Planning & Control 29 (2): 143–157. doi:10.1080/09537287.2017.1395920.
  • Braglia, M., D. Castellano, M. Frosolini, and M. Gallo. 2019. “Integrating Considerations of Uncertainty within the OEE of a Manufacturing Line.” International Journal of Industrial and Systems Engineering 32 (4): 469–496. doi:10.1504/IJISE.2019.101333.
  • Braglia, M., M. Frosolini, and M. Gallo. 2016. “Enhancing SMED: Changeover out of Machine Evaluation Technique to Implement the Duplication Strategy.” Production Planning & Control 27 (4): 328–342. doi:10.1080/09537287.2015.1126370.
  • Chambers, S. 2015. “Process Types.” In Wiley Encyclopedia of Management, edited by C. L. Cooper, S. Roden, M. Lewis, and N. Slack, 1–3. Chichester.Wiley-Blackwell. 10.1002/9781118785317.weom100221
  • Cigolini, R., and A. Grando. 2009. “Modelling Capacity and Productivity of Multi-Machine Systems.” Production Planning & Control 20 (1): 30–39. doi:10.1080/09537280802627969.
  • Dal, B., P. Tugwell, and R. Greatbanks. 2000. “Overall Equipment Effectiveness as a Measure of Operational improvement – A Practical Analysis.” International Journal of Operations & Production Management 20 (12): 1488–1502. doi:10.1108/01443570010355750.
  • De Groote, P. 1995. “Maintenance Performance Analysis: A Practical Approach.” Journal of Quality in Maintenance Engineering 1 (2): 4–24. doi:10.1108/13552519510089556.
  • De Ron, A. J., and J. E. Rooda. 2005. “Equipment Effectiveness: OEE Revisited.” IEEE Transactions on Semiconductor Manufacturing 18 (1): 190–196. doi:10.1109/TSM.2004.836657.
  • Denso. 2006. “Introduction to Total Productive Maintenance.” Student Study Guide, TPM100.
  • Domingo, R., and S. Aguado. 2015. “Overall Environmental Equipment Effectiveness as a Metric of a Lean and Green Manufacturing System.” Sustainability 7 (7): 9031–9047. doi:10.3390/su7079031.
  • Durán, Orlando, Andrea Capaldo, and Paulo Duran Acevedo. 2018. “Sustainable Overall Throughputability Effectiveness (S.O.T.E.) as a Metric for Production Systems.” Sustainability, 10 (2): 362. doi:10.3390/su10020362.
  • Ingemansson, A. 2004. “On Reduction of Production Disturbances in Manufacturing Systems Based on Discrete-Event Simulation.” https://www.lth.se/fileadmin/maskinkonstruktion/robotteknik/arkiv/2004/arne_ingemanssin_2004_thesis.pdf
  • ISO British Standards Institution. 2014a. Automation Systems and Integration – Key Performance Indicators (KPIs) for Manufacturing Operations Management Part 2: Definitions and Descriptions (BS ISO 22400-2:2014). Technical Report. Key Performance Indicators (KPIs) for Manufacturing Operations Management.
  • ISO/TC 184/SC 5. 2014b. “ISO 22400-2:2014 Automation Systems and Integration – Key Performance Indicators (KPIs) for Manufacturing Operations Management.” https://www.iso.org/standard/56847.html
  • Ivancic, I. 1998. “Development of Maintenance in Modern Production.” Euromaintenance ’98 Conference Proceedings, 15–25.
  • Jeong, K. Y., and D. T. Phillips. 2001. “Operational Efficiency and Effectiveness Measurement.” International Journal of Operations and Production Management 21 (11): 1404–1416. doi:10.1108/EUM0000000006223.
  • Johnsson, C. 2014. “Key Performance Indicators Used as Measurement Parameter for Plant-Wide Feedback Loops: (Work in Progress).” IFIP Advances in Information and Communication Technology 440: 91–99. doi:10.1007/978-3-662-44733-8_12.
  • Jonsson, P., and M. Lesshammar. 1999. “Evaluation and Improvement of Manufacturing Performance Measurement systems – The Role of OEE.” International Journal of Operations and Production Management 19 (1): 55–78. doi:10.1108/01443579910244223.
  • Kumar, M., J. Antony, R. K. Singh, M. K. Tiwari, and D. Perry. 2006. “Implementing the Lean Sigma Framework in an Indian SME: A Case Study.” Production Planning & Control 17 (4): 407–423. doi:10.1080/09537280500483350.
  • Leachman, R. C. 1997. “Closed-Loop Measurement of Equipment Efficiency and Equipment Capacity.” IEEE Transactions on Semiconductor Manufacturing 10 (1): 84–97. doi:10.1109/66.554490.
  • Lindberg, C. F., S. Tan, J. Yan, and F. Starfelt. 2015. “Key Performance Indicators Improve Industrial Performance.” Energy Procedia 75: 1785–1790. doi:10.1016/j.egypro.2015.07.474.
  • Ljungberg, Õ. 1998. “Measurement of Overall Equipment Effectiveness as a Basis for TPM Activities.” International Journal of Operations & Production Management 18 (5): 495–507. doi:10.1108/01443579810206334.
  • Loughlin, S. 2003. “A Holistic Approach to Overall Equipment Effectiveness (OEE).” Computing and Control Engineering 14 (6): 37–42. doi:10.1049/cce:20030608.
  • Melnyk, S. A., D. M. Stewart, and M. Swink. 2004. “Metrics and Performance Measurement in Operations Management: Dealing with the Metrics Maze.” Journal of Operations Management 22 (3): 209–218. doi:10.1016/j.jom.2004.01.004.
  • Mhiri, E. 2016. Planification de la production à capacité finie dans un contexte à forte variabilité, application à l’industrie des semi-conducteurs.
  • Muchiri, P., and L. Pintelon. 2008. “Performance Measurement Using Overall Equipment Effectiveness (OEE): Literature Review and Practical Application Discussion.” International Journal of Production Research 46 (13): 3517–3535. doi:10.1080/00207540601142645.
  • Muthiah, K. M. N., and S. H. Huang. 2007. “Overall Throughput Effectiveness (OTE) Metric for Factory-Level Performance Monitoring and Bottleneck Detection.” International Journal of Production Research 45 (20): 4753–4769. doi:10.1080/00207540600786731.
  • Muthiah, K. M. N., S. H. Huang, and S. Mahadevan. 2008. “Automating Factory Performance Diagnostics Using Overall Throughput Effectiveness (OTE) Metric.” The International Journal of Advanced Manufacturing Technology 36 (7-8): 811–824. doi:10.1007/s00170-006-0891-x.
  • Nachiappan, R. M., and N. Anantharaman. 2006. “Evaluation of Overall Line Effectiveness (OLE) in a Continuous Product Line Manufacturing System.” Journal of Manufacturing Technology Management 17 (7): 987–1008. doi:10.1108/17410380610688278.
  • Nakajima, S. 1988. Introduction to TPM: Total Productive Maintenance, Productivity Pr ed. ISBN 13: 9780915299232
  • Neely, A., M. Gregory, and K. Platts. 1995. “Performance Measurement System Design: A Literature Review and Research Agenda.” International Journal of Operations and Production Management 15 (4): 80–116. doi:10.1108/01443579510083622.
  • Oechsner, R., M. Pfeffer, L. Pfitzner, H. Binder, E. Müller, and T. Vonderstrass. 2002. “From Overall Equipment Efficiency (OEE) to Overall Fab Effectiveness (OFE).” Materials Science in Semiconductor Processing 5 (4–5): 333–339. doi:10.1016/S1369-8001(03)00011-8.
  • Raouf, A. 1994. “Improving Capital Productivity through Maintenance.” International Journal of Operations & Production Management 14 (7): 44–52. doi:10.1108/01443579410062167.
  • Robinson, P., and S. Gelder. 2017. Operations Management in the Travel Industry. Wallingford: CABI.
  • SEMI. 2003. “E124-1103: Guide for Definition and Calculation of Overall Factory Efficiency (OFE) and Other Associated Factory Level Productivity Metrics.” https://store-us.semi.org/products/e12400-semi-e124-guide-for-definition-and-calculation-of-overall-factory-efficiency-ofe-and-other-associated-factory-level-productivity-metrics.
  • SEMI. 2014. “E79-1106: Specification for Definition and Measurement of Equipment.” https://store-us.semi.org/products/e07900-semi-e79-specification-for-definition-and-measurement-of-equipment-productivity.
  • Scott, D., and R. Pisa. 1998. “Can Overall Factory Effectiveness Prolong Moore’s Law?” Solid State Technology 41 (3): 75–82.
  • Sohal, A., J. Olhager, P. O’Neill, and D. Prajogo. 2010. “Implementation of OEE – Issues and Challenges.” Proceedings of APMS 2010 – International Conference on Advances in Production Management Systems.
  • Stamatis, D. H. 2017. The OEE Primer: Understanding Overall Equipment Effectiveness, Reliability, and Maintainability. New York: Productivity Press. doi:10.1201/EBK1439814062.
  • Tsang, A. H. C., A. K. S. Jardine, and H. Kolodny. 1999. “Measuring Maintenance Performance: A Holistic Approach.” International Journal of Operations and Production Management 19 (7): 691–715. doi:10.1108/01443579910271674.
  • Turner, T. J., U. S. Bititci, and S. S. Nudurupati. 2005. “Implementation and Impact of Performance Measures in Two SMEs in Central Scotland.” Production Planning & Control 16 (2): 135–151. doi:10.1080/0953728051233133048.
  • Wakiru, J. M., L. Pintelon, P. Muchiri, and P. Chemweno. 2021. “Integrated Maintenance Policies for Performance Improvement of a Multi-Unit Repairable, One Product Manufacturing System.” Production Planning & Control 32 (5): 347–367. doi:10.1080/09537287.2020.1736684.
  • Wojakowski, P. 2015. “Plant Performance Calculation in Automotive Industry Using Andon System.” Research in Logistics & Production 5 (4): 361–370.
  • Wudhikarn, R. 2016. “Implementation of the Overall Equipment Cost Loss (OECL) Methodology for Comparison with Overall Equipment Effectiveness (OEE).” Journal of Quality in Maintenance Engineering 22 (1): 81–93. doi:10.1108/JQME-12-2011-0001.
  • Wudhikarn, R., C. Smithikul, and W. Manopiniwes. 2010. “Developing Overall Equipment Cost Loss Indicator.” Advances in Intelligent and Soft Computing 66: 557–567. doi:10.1007/978-3-642-10430-5_43.
  • Ylipää, Torn. 2000. High-Reliability Manufacturing Systems. Gothenburg: Chalmers University of Technology.
  • Zammori, F. 2015. “Fuzzy Overall Equipment Effectiveness (FOEE): Capturing Performance Fluctuations through LR Fuzzy Numbers.” Production Planning & Control 26 (6): 451–466. doi:10.1080/09537287.2014.920545.
  • Zandieh, S., S. A. N. Tabatabaei, and M. Ghandehary. 2012. “Evaluation of Overall Equipment Effectiveness in a Continuous Process Production.” Interdisciplinary Journal of Contemporary Research in Business 3 (10): 590–599.
  • Zhu, L., C. Johnsson, J. Mejvik, M. Varisco, and M. Schiraldi. 2018. “Key Performance Indicators for Manufacturing Operations Management in the Process Industry.” IEEE International Conference on Industrial Engineering and Engineering Management, Vol. 2017-December, 969–973. doi:10.1109/IEEM.2017.8290036.
  • Zhu, L., C. Johnsson, M. Varisco, and M. M. Schiraldi. 2018b. “Key Performance Indicators for Manufacturing Operations management – Gap Analysis between Process Industrial Needs and ISO 22400 Standard.” Procedia Manufacturing 25: 82–88. doi:10.1016/j.promfg.2018.06.060.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.