167
Views
0
CrossRef citations to date
0
Altmetric
Research Article

Opportunity management enablers in construction projects: a systematic literature review

ORCID Icon, ORCID Icon, ORCID Icon & ORCID Icon
Received 23 Dec 2023, Accepted 29 May 2024, Published online: 11 Jun 2024

References

  • Abdelfatah, S., M. Abdel-Hamid, and A.-A. Ahmed. 2020. “Applying Value Engineering Technique Using Building Information Modeling at Underground Metro Station.” International Journal of Engineering Research and Technology 13 (7): 1555–1561. https://doi.org/10.37624/IJERT/13.7.2020.1555-1561.
  • Alleman, D., and D. Tran. 2021. “Exploring a Progressive Design-Build Best-Value Delivery Method in Highway Construction.” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 13 (1): 1–14. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000443.
  • Allison, M., H. Ashcraft, R. Cheng, S. Klawens, and J. Pease. 2018. “Integrated Project Delivery: An Action Guide for Leaders.” https://lean-construction-gcs.storage.googleapis.com/wp-content/uploads/2022/09/08193823/IPD_Full-Pass_180603_comp.pdf.
  • Andújar-Montoya, M. D., A. Galiano-Garrigós, V. Echarri-Iribarren, and C. Rizo-Maestre. 2020. “BIM-LEAN as a Methodology to Save Execution Costs in Building Construction—an Experience Under the Spanish Framework.” Applied Sciences 10 (6): 1913. https://doi.org/10.3390/app10061913.
  • APM. 2006. APM Body of Knowledge. 5th ed. Princes Risborough, UK: Association for Project Management.
  • Arantes, A., and L. M. D. Ferreira. 2021. “A Methodology for the Development of Delay Mitigation Measures in Construction Projects.” Production Planning & Control 32 (3): 228–241. https://doi.org/10.1080/09537287.2020.1725169.
  • Arditi, D., A. Elhassan, and Y. C. Toklu. 2002. “Constructability Analysis in the Design Firm.” Journal of Construction Engineering and Management 128 (2): 117–126. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:2(117).
  • Aziz, R. F., and S. M. Hafez. 2013. “Applying Lean Thinking in Construction and Performance Improvement.” Alexandria Engineering Journal 52 (4): 679–695. https://doi.org/10.1016/j.aej.2013.04.008.
  • Bahrami, H., and S. Evans. 2010. “Super-Flexibility: A Toolkit for Dynamic Adaptation.” In Super-Flexibility for Knowledge Enterprises. Berlin, Germany: Springer.
  • Baker, B. N., D. C. Murphy, and D. Fisher. 1988. “Project Management Handbook.” In Project Management Handbook, edited by D. I. Cleland and W. R. King. 2nd ed., 902–919. Hoboken, USA: John Wiley & Sons, Inc.
  • Bensalah, M., A. Elouadi, and H. Mharzi. 2019. “Overview: The Opportunity of BIM in Railway.” Smart and Sustainable Built Environment 8 (2): 103–116. https://doi.org/10.1108/SASBE-11-2017-0060.
  • Bhattacharya, S., and A. Mathur. 2022. “Synergising Lean Objectives Through BIM to Enhance Productivity and Performance.” International Journal of Productivity and Performance Management 72 (7): 2135–2154. https://doi.org/10.1108/IJPPM-04-2021-0199.
  • Bourdeau, J., D. Edgar, E. Koski, I. Pohoriljakova, T. Mottus, and R. Baird. 2020. “Conservation Design Assist: An Innovative Model to Integrate Conservation Expertise within the Major Rehabilitation of Canada’s Parliamentary Centre Block.” Studies in Conservation 65 (sup1): P25–P30. https://doi.org/10.1080/00393630.2020.1762410.
  • Bower, D. C., and D. H. Walker. 2007. “Planning Knowledge for Phased Rollout Projects.” Project Management Journal 38 (3): 45–60. https://doi.org/10.1002/pmj.20005.
  • Briner, R. B., and D. Denyer. 2012. “Systematic Review and Evidence Synthesis as a Practice and Scholarship Tool.” In The Oxford Handbook of Evidence-Based Management, 112–129. Oxford: Oxford University Press. https://doi.org/10.1093/oxfordhb/9780199763986.013.0007.
  • Brunet, M., and D. Forgues. 2019. “Investigating Collective Sensemaking of a Major Project Success.” International Journal of Managing Projects in Business 12 (3): 644–665. https://doi.org/10.1108/IJMPB-08-2018-0167.
  • Bryde, D. J., and L. Robinson. 2005. “Client Versus Contractor Perspectives on Project Success Criteria.” International Journal of Project Management 23 (8): 622–629. https://doi.org/10.1016/j.ijproman.2005.05.003.
  • Bryde, D. J., and J. M. Volm. 2009. “Perceptions of Owners in German Construction Projects: Congruence with Project Risk Theory.” Construction Management and Economics 27 (11): 1059–1071. https://doi.org/10.1080/01446190903222403.
  • Bygballe, L. E., M. Endresen, and S. Fålun. 2018. “The Role of Formal and Informal Mechanisms in Implementing Lean Principles in Construction Projects.” Engineering, Construction and Architectural Management 25 (10): 1322–1338. https://doi.org/10.1108/ECAM-07-2017-0138.
  • Caffieri, J. J., P. E. Love, A. Whyte, and D. D. Ahiaga-Dagbui. 2018. “Planning for Production in Construction: Controlling Costs in Major Capital Projects.” Production Planning & Control 29 (1): 41–50. https://doi.org/10.1080/09537287.2017.1376258.
  • Chahrour, R., M. A. Hafeez, A. M. Ahmad, H. I. Sulieman, H. Dawood, S. Rodriguez-Trejo, M. Kassem, K. K. Naji, and N. Dawood. 2021. “Cost-Benefit Analysis of BIM-Enabled Design Clash Detection and Resolution.” Construction Management and Economics 39 (1): 55–72. https://doi.org/10.1080/01446193.2020.1802768.
  • Chapman, C., and S. Ward. 2004. “Why Risk Efficiency Is a Key Aspect of Best Practice Projects.” International Journal of Project Management 22 (8): 619–632. https://doi.org/10.1016/j.ijproman.2004.05.001.
  • Czerewko, M., A. Bastekin, J. Tunnicliffe, and R. O’Rourke. 2019. “Wind Turbine Construction in and Around Carsington Pasture in Derbyshire; Overcoming the Challenges Posed by Difficult Ground Conditions.” Quarterly Journal of Engineering Geology and Hydrogeology 52 (4): 459–480. https://doi.org/10.1144/qjegh2018-198.
  • Daraei, A., A. F. H. Sherwani, R. H. Faraj, Q. Kalhor, S. Zare, and A. Mahmoodzadeh. 2019. “Optimization of the Outlet Portal of Heybat Sultan Twin Tunnels Based on the Value Engineering Methodology.” SN Applied Sciences 1(3): 1–10. https://doi.org/10.1007/s42452-019-0279-9.
  • Davis, J., K. Mengersen, S. Bennett, and L. Mazerolle. 2014. “Viewing Systematic Reviews and Meta-Analysis in Social Research Through Different Lenses.” SpringerPlus 3 (1): 511. https://doi.org/10.1186/2193-1801-3-511.
  • Davis, K. 2014. “Different Stakeholder Groups and Their Perceptions of Project Success.” International Journal of Project Management 32 (2): 189–201. https://doi.org/10.1016/j.ijproman.2013.02.006.
  • De Wit, A. 1988. “Measurement of Project Success.” International Journal of Project Management 6 (3): 164–170. https://doi.org/10.1016/0263-7863(88)90043-9.
  • Demirkesen, S., E. Sadikoglu, and E. Jayamanne. 2022. “Investigating Effectiveness of Time Studies in Lean Construction Projects: Case of Transbay Block 8.” Production Planning & Control 33 (13): 1283–1303. https://doi.org/10.1080/09537287.2020.1859151.
  • Ellis, J., D. J. Edwards, W. D. Thwala, O. Ejohwomu, E. E. Ameyaw, and M. Shelbourn. 2021. “A Case Study of a Negotiated Tender Within a Small-to-Medium Construction Contractor: Modelling Project Cost Variance.” Buildings 11 (6): 1–28. https://doi.org/10.3390/buildings11060260.
  • Gharehbaghi, K., K. McManus, and K. Robson. 2019. “Minimizing the Environmental Impacts of Mega Infrastructure Projects: Australian Public Transport Perspective.” Journal of Engineering, Design and Technology 17 (4): 736–746. https://doi.org/10.1108/JEDT-12-2018-0223.
  • Gorod, A., L. Hallo, L. Statsenko, T. Nguyen, and N. Chileshe. 2021. “Integrating Hierarchical and Network Centric Management Approaches in Construction Megaprojects Using a Holonic Methodology.” Engineering, Construction and Architectural Management 28 (3): 627–661. https://doi.org/10.1108/ECAM-01-2020-0072.
  • Göttsche, J., and M. Kelly. 2020. “Assessing the Impact of Resource Efficiency on Selected Case Studies in Ireland.” In Proceedings of the Institution of Civil Engineers - Waste and Resource Management; 2020. Thomas Telford Ltd. https://doi.org/10.1680/jwarm.20.00006.
  • Gransberg, N. J., and D. D. Gransberg. 2020. “Public Project Construction Manager-at-Risk Contracts: Lessons Learned from a Comparison of Commercial and Infrastructure Projects.” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 12 (1): 1–9. https://doi.org/10.1680/jwarm.20.00006.
  • Haaskjold, H., B. Andersen, and J. A. Langlo. 2021. “Dissecting the Project Anatomy: Understanding the Cost of Managing Construction Projects.” Production Planning & Control 34 (2): 117–138. https://doi.org/10.1080/09537287.2021.1891480.
  • Hällgren, M. 2012. “The Construction of Research Questions in Project Management.” International Journal of Project Management 30 (7): 804–816. https://doi.org/10.1016/j.ijproman.2012.01.005.
  • Hein, C. J., M. S. Fenster, K. B. Gedan, J. R. Tabar, E. A. Hein, and T. DeMunda. 2021. “Leveraging the Interdependencies between Barrier Islands and Backbarrier Saltmarshes to Enhance Resilience to Sea-Level Rise.” Frontiers in Marine Science 8: 1–17. https://doi.org/10.3389/fmars.2021.721904.
  • Hietajärvi, A.-M., K. Aaltonen, and H. Haapasalo. 2017. “Opportunity Management in Large Projects: A Case Study of an Infrastructure Alliance Project.” Construction Innovation 17 (3): 340–362. https://doi.org/10.1108/CI-10-2016-0051.
  • Hillson, D. 2002. “Extending the Risk Process to Manage Opportunities.” International Journal of Project Management 20 (3): 235–240. https://doi.org/10.1016/S0263-7863(01)00074-6.
  • Huang, Z., H. Zhang, Z. Long, W. Qiu, G. Meng, and L. Zhu. 2021. “Field Test Optimization of Shield Tunnelling Parameters Undercrossing an Existing High-Speed Railway Tunnel: A Case Study.” Geotechnical and Geological Engineering 39: 1381–1398. https://doi.org/10.1007/s10706-020-01564-3.
  • Ika, L. A., and J. K. Pinto. 2022. “The “Re-meaning” of Project Success: Updating and Recalibrating for a Modern Project Management.” International Journal of Project Management 40 (7): 835–848. https://doi.org/10.1016/j.ijproman.2022.08.001.
  • IPA (Infrastructure and Projects Authority). 2017. Guide for Effective Benefits Management in Major Projects: Key Benefits Management Principles and Activities for Major Projects. London, UK: Infrastructure and Projects Authority. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/671452/Guide_for_Effective_Benefits_Management_in_Major_Projects.pdf.
  • Jang, S., Y. Jeong, G. Lee, and Y. Kang. 2019. “Enhancing Subcontractors’ Participation in BIM-Based Design Coordination Under a DBB Contract.” Journal of Management in Engineering 35 (6): 1–14. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000714.
  • Johansen, A., Y. C. Bjerke, and A. Landmark. 2018. “Effective Opportunity Management in a Megaproject.” Procedia Computer Science 138: 883–890. https://doi.org/10.1016/j.procs.2018.10.115.
  • Johansen, A., P. Eik-Andresen, A. Dypvik Landmark, A. Ekambaram, and A. Rolstadås. 2016. “Value of Uncertainty: The Lost Opportunities in Large Projects.” Administrative Sciences 6 (3): 1–17. https://doi.org/10.3390/admsci6030011.
  • Johansen, A., N. O. Olsson, J. George, and R. Asbjørn. 2019. Project Risk and Opportunity Management: An Owner’s Perspective. London, UK: Routledge.
  • Kelly, J., S. Male, and D. Graham. 2014. Value Management of Construction Projects. 2nd ed. Chichester, UK: John Wiley & Sons.
  • Khodeir, L. M., and A. El Ghandour. 2019. “Examining the Role of Value Management in Controlling Cost Overrun [Application on Residential Construction Projects in Egypt].” Ain Shams Engineering Journal 10 (3): 471–479. https://doi.org/10.1016/j.asej.2018.11.008.
  • Kolltveit, B. J., J. T. Karlsen, and K. Grønhaug. 2004. “Exploiting Opportunities in Uncertainty During the Early Project Phase.” Journal of Management in Engineering 20 (4): 134–140. https://doi.org/10.1061/(ASCE)0742-597X(2004)20:4(134).
  • Koseoglu, O., and E. T. Nurtan-Gunes. 2018. “Mobile BIM Implementation and Lean Interaction on Construction Site: A Case Study of a Complex Airport Project.” Engineering, Construction and Architectural Management 25 (10): 1298–1321. https://doi.org/10.1108/ECAM-08-2017-0188.
  • Koseoglu, O., M. Sakin, and Y. Arayici. 2018. “Exploring the BIM and Lean Synergies in the Istanbul Grand Airport Construction Project.” Engineering, Construction and Architectural Management 25 (10): 1339–1354. https://doi.org/10.1108/ECAM-08-2017-0186.
  • Krane, H. P., A. Johansen, and R. Alstad. 2014. “Exploiting Opportunities in the Uncertainty Management.” Procedia - Social and Behavioral Sciences 119: 615–624. https://doi.org/10.1016/j.sbspro.2014.03.069.
  • Krane, H. P., A. Rolstadas, and N. O. Olsson. 2011. “An Empirical Analysis of Project Risk in a Time Perspective.” International Journal of Project Organisation and Management 3 (1): 36–56. https://doi.org/10.1504/IJPOM.2011.038863.
  • Krippendorff, K. 2018. Content Analysis: An Introduction to Its Methodology. Thousand Oaks, CA: Sage Publications.
  • Kutsch, E., and M. Hall. 2016. Project Resilience: The Art of Noticing, Interpreting, Preparing, Containing and Recovering. London: Routledge.
  • Laryea, S., and R. Watermeyer. 2020. “Managing Uncertainty in Fast-Track Construction Projects: Case Study from South Africa.” Proceedings of Institution of Civil Engineers: Management, Procurement and Law 173 (2): 49–63. https://doi.org/10.1680/jmapl.19.00039.
  • Laurent, J., and R. M. Leicht. 2019. “Practices for Designing Cross-Functional Teams for Integrated Project Delivery.” Journal of Construction Engineering and Management 145 (3): 1–11. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001605.
  • Lechler, T. G., B. H. Edington, and T. Gao. 2012. “Challenging Classic Project Management: Turning Project Uncertainties into Business Opportunities.” Project Management Journal 43 (6): 59–69. https://doi.org/10.1002/pmj.21304.
  • Lee, E.-B., D. Alleman, D. Thomas, and C.-M. Kim. 2020. “Integrating CA4PRS V. 3 Road Widening Schedule Module into US Highway Early Constructability Process: California SR-91 Corridor Improvement Program Case Study.” Transport 35 (1): 1–19. https://doi.org/10.3846/transport.2019.11650.
  • Lehtiranta, L. 2014. “Risk Perceptions and Approaches in Multi-Organizations: A Research Review 2000–2012.” International Journal of Project Management 32 (4): 640–653. https://doi.org/10.1016/j.ijproman.2013.09.002.
  • Leicht, David, Daniel Castro-Fresno, Joaquìn Dìaz, and Christian Baier. 2020. “Multidimensional Construction Planning and Agile Organized Project Execution-The 5D-PROMPT Method.” Sustainability 12 (16): 6340. https://doi.org/10.3390/su12166340.
  • Li, X., C. Wang, and A. Alashwal. 2021. “Case Study on BIM and Value Engineering Integration for Construction Cost Control.” Advances in Civil Engineering 2021: 1–13. https://doi.org/10.1155/2021/8849303.
  • Liu, Y., E.-J. Houwing, M. Hertogh, Z. Yuan, and H. Liu. 2022. “Explorative Learning in Infrastructure Development Megaprojects: The Case of the Hong Kong-Zhuhai-Macao Bridge.” Project Management Journal 53 (2): 113–127. https://doi.org/10.1177/87569728211065574.
  • Lyu, Z., P. Lin, D. Guo, and G. Q. Huang. 2020. “Towards Zero-Warehousing Smart Manufacturing from Zero-Inventory Just-in-Time Production.” Robotics and Computer-Integrated Manufacturing 64: 1–11. https://doi.org/10.1016/j.rcim.2020.101932.
  • Ma, X., A. P. Chan, H. Wu, F. Xiong, and N. Dong. 2018. “Achieving Leanness with BIM-Based Integrated Data Management in a Built Environment Project.” Construction Innovation 18 (4): 469–487. https://doi.org/10.1108/CI-10-2017-0084.
  • Majava, J., H. Haapasalo, and K. Aaltonen. 2019. “Elaborating Factors Affecting Visual Control in a Big Room.” Construction Innovation 19 (1): 34–47. https://doi.org/10.1108/CI-06-2018-0048.
  • Marsov, A., N. O. Olsson, and O. Lædre. 2022. “Research Approaches in Opportunity Management: scoping Review.” Procedia Computer Science 196: 872–879. https://doi.org/10.1016/j.procs.2021.12.087.
  • Mitropoulos, P., and V. Tajima. 2022. “Constructability Opportunities in the Engineering Design of Marine Pier Structures: A Case Study.” International Journal of Construction Management 22 (3): 366–378. https://doi.org/10.1080/15623599.2019.1624677.
  • Morgan, D. L. 1993. “Qualitative Content Analysis: A Guide to Paths Not Taken.” Qualitative Health Research 3 (1): 112–121. https://doi.org/10.1177/104973239300300107.
  • Mossman, A., G. Ballard, and C. Pasquire. 2013. Lean Project Delivery—Innovation in Integrated Design & Delivery. In The Design Manager’s Handbook, 165–190. Chichester, UK: John Wiley & Sons. https://doi.org/10.13140/2.1.2713.2804.
  • Olsson, N. O., and O. J. Klakegg. 2023. A Resilience Perspective on Governance for Construction Project Delivery. Construction Project Organising, 85–100. Chichester, UK: John Wiley & Sons.
  • Othman, A. A. E., and S. M. Abdelrahim. 2020. “Achieving Sustainability Through Reducing Construction Waste During the Design Process: A Value Management Perspective.” Journal of Engineering, Design and Technology 18 (2): 362–377. https://doi.org/10.1108/JEDT-03-2019-0064.
  • Page, Matthew J., Joanne E. McKenzie, Patrick M. Bossuyt, Isabelle Boutron, Tammy C. Hoffmann, Cynthia D. Mulrow, Larissa Shamseer, et al. 2021. “The PRISMA 2020 Statement: An Updated Guideline for Reporting Systematic Reviews.” International Journal of Surgery (London, England) 88: 105906. https://doi.org/10.1016/j.ijsu.2021.105906.
  • Pati, D., and L. N. Lorusso. 2018. “How to Write a Systematic Review of the Literature.” HERD 11 (1): 15–30. https://doi.org/10.1177/1937586717747384.
  • Perez, A. M., and S. Ghosh. 2018. “Barriers Faced by New-Adopter of Last Planner System®: A Case Study.” Engineering, Construction and Architectural Management 25 (9): 1110–1126. https://doi.org/10.1108/ECAM-08-2017-0162.
  • Peters, L. D., A. D. Pressey, A. J. Gilchrist, and W. J. Johnston. 2018. “Involving Customers in Innovation: knowledgeability and Agency as Process Variables.” Journal of Business & Industrial Marketing 33 (2): 164–173. https://doi.org/10.1108/JBIM-04-2016-0083.
  • Pollack, J., J. Helm, and D. Adler. 2018. “What is the Iron Triangle, and How Has It Changed?” International Journal of Managing Projects in Business 11 (2): 527–547. https://doi.org/10.1108/IJMPB-09-2017-0107.
  • Power, W., D. Sinnott, and P. Lynch. 2021. “Evaluating the Efficacy of a Dedicated Last Planner System Facilitator to Enhance Construction Productivity.” Construction Economics and Building 21 (3): 142–158. https://doi.org/10.5130/AJCEB.v21i3.7640.
  • Ramani, P. V., and L. K. L. Ksd. 2021. “Application of Lean in Construction Using Value Stream Mapping.” Engineering, Construction and Architectural Management 28 (1): 216–228. https://doi.org/10.1108/ECAM-12-2018-0572.
  • Rasmussen, H. L. 2021. “The Challenge of Integrating Operational Knowledge in Building and Ship Design.” Facilities 39 (3/4): 136–155. https://doi.org/10.1108/F-10-2019-0106.
  • Reichheld, F. 2006. “The Ultimate Question: Driving Good Profits and True Growth.” Harvard Business School Press, Boston, MA 15 (1): 137–139.
  • Rodrigues, M. R., and S. M. Lindhard. 2021. “Benefits and Challenges to Applying IPD: Experiences from a Norwegian Mega-Project.” Construction Innovation 23 (2): 287–305. https://doi.org/10.1108/CI-03-2021-0042.
  • Rolstadås, A., A. Johansen, Y. C. Bjerke, and T. O. Malvik. 2019. “Managing Risk and Opportunities in Complex Projects.” In IFIP International Conference on Advances in Production Management Systems, 631–639. Cham, Switzerland: Springer.
  • Savolainen, J. M., A. Saari, A. Männistö, and K. Kähkonen. 2018. “Indicators of Collaborative Design Management in Construction Projects.” Journal of Engineering, Design and Technology 16 (4): 674–691. https://doi.org/10.1108/JEDT-09-2017-0091.
  • Seppänen, O., J. Evinger, and C. Mouflard. 2014. “Effects of the Location-Based Management System on Production Rates and Productivity.” Construction Management and Economics 32 (6): 608–624. https://doi.org/10.1080/01446193.2013.853881.
  • Shabani, R., T. O. Malvik, A. Johansen, and O. Torp. 2022. “Dealing with Uncertainties in the Design Phase of Road Projects.” International Journal of Managing Projects in Business 16 (8): 27–57. https://doi.org/10.1108/IJMPB-02-2022-0050.
  • Shafiq, M. T. 2021. “Client-Driven Level 2 BIM Implementation: A Case Study from the UAE. The Open Construction & Building.” Technology Journal 15 (1): 129–140. https://doi.org/10.2174/1874836802115010129.
  • Shahhosseini, V., M. R. Afshar, and O. Amiri. 2018. “Value Engineering Practices in Infrastructure Projects: A Case Study of Ilam Gas Refinery’s Water Transmission System at Reno Mountain, Iran.” International Journal of Construction Management 18 (5): 351–363. https://doi.org/10.1080/15623599.2017.1326298.
  • Snyder, H. 2019. “Literature Review as a Research Methodology: An Overview and Guidelines.” Journal of Business Research 104: 333–339. https://doi.org/10.1016/j.jbusres.2019.07.039.
  • Staub-French, S., A. Pilon, E. Poirier, A. Fallahi, M. Kasbar, F. Calderon, Z. Teshnizi, and T. Froese. 2022. “Construction Process Innovation on Brock Commons Tallwood House.” Construction Innovation 22 (1): 1–22. https://doi.org/10.1108/CI-11-2019-0117.
  • Wawak, S., and K. Woźniak. 2020. “Evolution of Project Management Studies in the XXI Century.” International Journal of Managing Projects in Business 13 (4): 867–888. https://doi.org/10.1108/IJMPB-01-2020-0002.
  • Williams, R. I., Jr., L. A. Clark, W. R. Clark, and D. M. Raffo. 2021. “Re-examining Systematic Literature Review in Management Research: Additional Benefits and Execution Protocols.” European Management Journal 39 (4): 521–533. https://doi.org/10.1016/j.emj.2020.09.007.
  • Williams, T., H. Vo, M. Bourne, P. Bourne, R. Kirkham, G. Masterton, P. Quattrone, and C. Toczycka. 2023. “Benefits Realisation: case Studies in Public Major Project Delivery with Recommendations for Practice.” Production Planning & Control 1–21. Advance online publication. https://doi.org/10.1080/09537287.2023.2256287.
  • Xing, W., J. L. Hao, L. Qian, V. W. Tam, and K. S. Sikora. 2021. “Implementing Lean Construction Techniques and Management Methods in Chinese Projects: A Case Study in Suzhou, China.” Journal of Cleaner Production 286: 124944. https://doi.org/10.1016/j.jclepro.2020.124944.
  • Yu, J., M-y Leung, and X. Jiang. 2022. “Impact of Critical Factors within Decision Making Process of Public Engagement and Public Consultation for Construction Projects–Case Studies.” International Journal of Construction Management 22 (12): 2290–2299. https://doi.org/10.1080/15623599.2020.1783600.
  • Zender, Y. O., and B. G. de Soto. 2021. “Use of Scrum in the Rehabilitation of a Commercial Building in Peru.” Construction Innovation 21 (2): 145–163. https://doi.org/10.1108/CI-12-2019-0140.