Publication Cover
Production Planning & Control
The Management of Operations
Volume 5, 1994 - Issue 2
19
Views
2
CrossRef citations to date
0
Altmetric
Research papers

Evaluation of simple dispatching rules for dynamic single-machine earliness/tardiness problem

Pages 185-192 | Published online: 19 Apr 2007

References

  • BAKER K. R. , 1984 , Sequencing rules and due-date assignments in a job shop , Management Science , 30 , p. 1093 – 1104
  • BAKER K. R. and BERTRAND J. W. M. , 1981 , A comparison of due-date selection rules , AIIE Transactions , 13 , p. 123 – 131
  • BAKER K. R. and BERTRAND J. W. M. , 1981 , An investigation of due-date assignment rules with constrained tightness , Journal of Operations Management , 1 , p. 109 – 120
  • BAKER K. R. and BERTRAND J. W. M. , 1982 , A dynamic priority rule for scheduling against due-dates , Journal of Operations Management , 3 , p. 37 – 42
  • BAKER K. R. and KANET J. J. , 1983 , Job shop scheduling with modified due dates , Journal of Operations Management , 4 , p. 11 – 22
  • BAKER K. R. and SCUDDER G. D. , 1990 , Sequencing with earliness and tardiness penalties: A review , Operations Research , 38 , p. 22 – 36
  • BARRETT R. T. and BARMAN S. , 1986 , A SLAM II simulation study of a simplified flow shop , Simulation , 47 , p. 181 – 189
  • CONWAY R. W. , 1965 , Priority dispatching and job lateness in a job shop , Journal of Industrial Engineering , 16 , p. 228 – 237
  • CHENG T. C. E. , 1986 , Due-date determination for a single-machine shop with SPT-dispatching , Engineering Costs and Production Economics , 10 , p. 35 – 41
  • CHENG T. C. E. , 1992 , A note on the equivalence of the Wilkerson-Irwin and modified due-date rules for the mean tardiness sequencing problem , Computers and Industrial Engineering , 22 , p. 63 – 66
  • CHENG T. C. E. and GUPTA M. C. , 1989 , Survey of scheduling research involving due date determination decisions , European Journal of Operations Research , 38 , p. 156 – 166
  • CHRISTY D. P. and KANET J. J. , 1990 , Manufacturing systems with forbidden early shipment: Implication for choice of scheduling rules , International Journal of Production Research , 28 , p. 91 – 100
  • DE P. and GHOSH J. B. and WELLS C. E. , 1992 , Optimal due-date assignment and sequencing , European Journal of Operations Research , 57 , p. 323 – 331
  • FERRIS M. C. and VLACH M. , 1992 , Scheduling with earliness and tardiness penalties , Naval Research Logistics , 39 , p. 229 – 245
  • FRY T. D. and ARMSTRONG R. D. and ROSEN L. D. , 1990 , Single machine scheduling to minimize mean absoluted lateness: A heuristic solution , Computers and Operational Research , 17 , p. 105 – 112
  • GUPTA S. K. and KYPARISIS J. , 1987 , Single machine scheduling research , OMEGA , 15 , p. 207 – 227
  • GUPTA S. K. and SEN T. , 1983 , Minimizing a quadratic function of job lateness on a single machine , Engineering Costs and Production Economics , 7 , p. 187 – 194
  • KANET J. J. and CHRISTY D. P. , 1984 , Manufacturing systems with forbidden early order departure , International Journal of Production Research , 22 , p. 41 – 50
  • KANET J. J. and CHRISTY D. P. , 1989 , Manufacturing systems with forbidden early shipment: Implications for setting manufacturing lead times , International Journal of Production Research , 27 , p. 783 – 792
  • KANET J. J. and HAYYA J. C. , 1982 , Priority dispatching with operation due dates in a job shop , Journal of Operations Management , 2 , p. 167 – 175
  • LAKSHIMINARAYAN S. and LAKSHNANAN L. and PAPINEAU R. L. and ROCHETTE R. , 1978 , Optimal single-machine scheduling with earliness and tardiness penalties , Operations Research , 26 , p. 1079
  • LAWRENCE S. R. , 1991 , Scheduling a single machine to maximize net present value , International Journal of Production Research , 29 , p. 1141 – 1160
  • LIAO C. and HUANG R. , 1991 , An algorithm for minimizing the range of lateness on a single machine , Journal of the Operations Research Society , 42 , p. 183 – 186
  • MELNYK S. A. and RAGATZ G. L. , 1989 , Order review/release: Research issues and perspectives , International Journal of Production Research , 27 , p. 1081 – 1096
  • MONMA C. L. , 1980 , Sequencing to minimize maximum job cost , Operations Research , 28 , p. 942
  • MORTON T. E. , 1988 , SCHED-STAR a price based shop scheduling module , Journal of Manufacturing and Operations Management , 1 , p. 131 – 181
  • PEGDEN C. D. , 1986 , SIMAN User's Manual Systems Modelling Corporation , Sewickley
  • PEGDEN C. D. and SHANNON R. E. and SADOWSKI R. P. , 1990 , Introduction to Simulation Using SIMAN , Highstown McGraw-Hill
  • RAMASESH R. , 1990 , Dynamic job shop scheduling: A survey of simulation results , OMEGA , 18 , p. 43 – 57
  • SCUDDER G. D. and SMITH-DANIELS D. E. and ROHLEDER T. , 1990 , Use of the net present value criterion in a random job shop where early shipments are forbidden , Journal of Operations Management , 9 , p. 526 – 547
  • SIDNEY J. B. , 1977 , Optimal single-machine scheduling with earliness and tardiness penalties , Operations Research , 25 , p. 62 – 69
  • SUNDARARAGHAVAN P. S. and AHMED M. U. , 1984 , Minimizing the sum of absolute lateness in single-machine and multimachine scheduling , Naval Research Logistics , 31 , p. 325
  • WEEKS J. K. , 1979 , A simulation study of predictable due dates , Management Science , 25 , p. 363 – 373

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.